22 janvier 2020 | International, Aérospatial

Leonardo flies new Falco Xplorer drone

By: Tom Kington

ROME — A new 24-hour-endurance drone built by Italy's Leonardo has made its maiden flight in trials run in cooperation with the Italian Air Force, the firm said.

The Falco Xplorer, an evolution of earlier Falco models, flew for 60 minutes from Trapani Air Base in Sicily on Jan. 15 in a dedicated flying area before landing safely, Leonardo reported.

First launched last year at the Paris Air Show, the Xplorer offers a maximum payload of 350kg, a maximum takeoff weight of 1.3 tons, and it can operate above 24,000 feet.

The Italian firm is offering the drone with its Gabbiano T-80 radar, SAGE electronic-intelligence system, an electro-optical turret and a hyperspectral sensor for monitoring pollution and agriculture.

Aimed at both civilian and military customers, the Xplorer will feature satellite navigation, while pending flight tests will aim to certify the aircraft to NATO'S STANAG 4671 standard.

In its statement, Leonardo said the Xplorer was not subject to International Traffic in Arms Regulations (ITAR) restrictions, making it widely available for export around the world.

The drone is the third evolution in the Falco family, which includes the Falco and the larger Falco EVO, which offers 15 hours endurance.

Before its launch last year, Leonardo CEO Alessandro Profumo said the Xplorer will “overlap with the Predator A - it would be a new product for Predator A customers.”

The UN and the European Union's frontier protection agency Frontex are among existing customers of the Falco, while national customers are thought to be Jordan, Saudia Arabia, Pakistan and Turkmenistan.

https://www.defensenews.com/global/europe/2020/01/20/leonardo-flies-new-falco-xplorer-drone

Sur le même sujet

  • Newest Bradley fielding delayed as Army works to fix battery problem

    27 janvier 2021 | International, Terrestre

    Newest Bradley fielding delayed as Army works to fix battery problem

    By: Jen Judson WASHINGTON — The Army is testing a solution to address overheating and toxic gas production in the newest version of the Bradley Infantry Fighting Vehicle's turret battery, but its release has been delayed by almost a year, the service's program office told Defense News. The problem was discovered during the Army Test and Evaluation Command-run Full Operational Test and Evaluation at Fort Hood, Texas, where the Bradley A4 batteries were hooked directly into test equipment placing additional strain on them. The Bradley A4 design features a new charger but not new batteries. The new charger did not come with a voltage regulator, which caused the older batteries to overheat and produce the toxic gas during testing. The command suspended the maneuver portion of the test due to safety concerns related to the batteries overheating in all six test articles, according to a report recently released from the Director of Operational Test and Evaluation. “All six test article turret batteries overheated and discharged toxic fumes into the turret and crew compartment,” the report states. “This is a safety hazard to soldiers. The program manager was present during test and observed the turret battery issue. He supported the recommendation to suspend the remaining maneuver missions.” According to the program office, the service is partnered with several vendors that developed Bradley A4 — BAE Systems is the prime contractor — to design and test a solution after determining the problem during the testing process. The program office now expects to receive a materiel release by January 2022 with field maintenance new equipment training and operator new equipment training beginning at the same time. The original materiel release decision was expected in third quarter of fiscal 2021, the DOT&E report stated. The first Armored Brigade Combat Team is scheduled to get its new Bradley A4s in September 2022, the Bradley program office said. The Bradley A4 is an engineering change proposal program that brings in new suspension and track upgrades and upgrades the electrical system and power train to restore lost mobility and integrate new technologies. The current Bradley, for example, struggled to take on the power needed to run an active protection system. The Bradley won't receive an APS system until A4 is up and running. The Army reduced its Bradley modifications further in its FY21 budget request after cutting future upgrades beyond its A4 variant in FY20. The service is working to replace the Bradley down the road with an Optionally Manned Fighting Vehicle program. But the Bradley and its fire support vehicle will remain in ABCT formations until the 2050s. The FY21 appropriations bill slashed the Bradley program by $161 million due to production delays. https://www.defensenews.com/land/2021/01/25/newest-bradley-fielding-delayed-as-army-works-to-fix-battery-problem/

  • DoD seeks industry input on multibillion-dollar cloud collaboration solution

    26 octobre 2018 | International, C4ISR

    DoD seeks industry input on multibillion-dollar cloud collaboration solution

    By: Jessie Bur The Pentagon and General Services Administration released a request for information Oct. 25 for a new unified collaborative cloud solution that will unite the entire defense apparatus under one enterprise contract. The Defense Enterprise Office Solution is the first capability set of three that the Department of Defense plans to use to capture its enterprise collaboration and productivity needs. The DEOS capability set needs include a productivity suite, messaging capabilities, content management systems and collaboration tools. “We operate pretty much in a disparate environment right now, and predominantly on-[premises] for these capabilities. So DEOS will give us an opportunity to tear down some of those barriers, posture us for increased interoperability while taking advantage of what the commercial community has to offer,” said Essye Miller, principal deputy to the DoD chief information officer, at a press roundtable. “From a benefit perspective, for us: real-time upgrades, real-time refresh, real-time access to innovation as our industry partners make them available to us.” The contract will be offered through GSA's IT Schedule 70, which Miller said has matured to the level that was needed to support Non-Classified Internet Protocol Router, Secret Internet Protocol Router and tactical environment needs. “In fact, IT Schedule 70 is the vehicle GSA itself used to procure its own cloud-based email, collaboration and productivity solution,” said GSA Administrator Emily Murphy, adding that GSA is committed to working with vendors who would want to propose through the expedited Schedule 70 FASt Lane program. “Using IT Schedule 70 to help DoD procure an enterprisewide solution for email, productivity and collaboration tools could establish a baseline for GSA to scale up this type of solution across the federal government in the future.” In fact, according to Federal CIO Suzette Kent, the DoD solution moves the federal government forward on initiatives to use and procure scalable cloud solutions across agencies. “When we look at where we were with the report to the president across the federal government, and the intent to leverage as many common solutions for purposes of interoperability, cybersecurity ... and the overall efficiency of how we go after those solutions and the ability to keep those current, this is a really positive collaboration, and something that we're incredibly supportive of,” said Kent. Industry has just over two weeks to respond to the RFI, which closes Nov. 9, and the subsequent request for quotes will likely be released in early 2019, according to officials. The DoD and General Services Administration also plan to hold industry days in early December 2018 to facilitate communication between government and industry on the best way to approach the contract. The award for the eventual contract is planned for sometime in the third quarter of 2019, and would likely be set for approximately 10 years and $8 billion, according to Murphy, though that number could change depending on industry input. The appropriate solution would likely have to be certified at FedRAMP Moderate, said Miller. According to Murphy, GSA and DoD have yet to determine whether a single-award or multi-award contract will best suit the DoD's needs — a debate that proved highly contentious for the Joint Enterprise Defense Infrastructure cloud contract that opened for proposals July 26 — and the RFI asks respondents to provide pros and cons for each option. But DoD CIO Dana Deasy said that the DEOS program is part of a Pentagon initiative to bring defense operations into a multi-cloud and multi-vendor environment. “Our intentions are to have a cloud that can serve general purpose computing needs, as well as what I have coined a term as ‘fit-for-purpose' clouds, which could consist of internal clouds or commercial clouds that have a unique fit for purpose,” said Deasy, adding that DEOS would be one such cloud. Because DEOS is one of three collaboration capability sets the agency is looking to fulfill, DoD could end up offering a total of three contracts in that space, according to Miller. https://www.federaltimes.com/acquisition/2018/10/25/dod-seeks-industry-input-on-multibillion-dollar-cloud-collaboration-solution

  • Wittman proposes way to keep Next-Generation Air Dominance on track

    15 juin 2023 | International, Aérospatial

    Wittman proposes way to keep Next-Generation Air Dominance on track

    Congress wants annual updates on the Next-Generation Air Dominance fighter program and affiliated efforts, to ensure the Air Force and Navy stay on track.

Toutes les nouvelles