23 janvier 2019 | International, Terrestre

India launches first private-sector howitzer facility

Rahul Bedi, New Delhi - Jane's Defence Weekly

India's Larsen & Toubro (L&T) officially launched the country's first private-sector Armoured Systems Complex (ASC) on 19 January, in which the Indian Army's (IA's) K-9 Vajra (Thunderbolt) – a variant of the Hanwha Techwin K-9 Thunder 155 mm/52-calibre tracked self-propelled howitzer (SPH) – is already being built.

Spread over 40 acres and located in the western coastal town of Hazira, the ASC, which was inaugurated by Prime Minister Narendra Modi, will be used to construct and integrate armoured platforms such as SPHs, future infantry combat vehicles and main battle tanks under the government's ‘Make in India' initiative.

The company pointed out in a statement that it has already built 10 of the 100 K-9 SPHs ordered by the IA in mid-2017 for INR45 billion (USD630 million), which were handed over to the IA in November 2018: several months ahead of schedule. Delivery of the remaining SPHs is expected to be completed within the next 22 months.

According to Ministry of Defence spokesperson Colonel Aman Anand, the first K-9 Vajra regiment is set to become operational by July.

L&T pointed out in its statement that the K-9 Vajra, which was jointly developed by L&T and South Korea's Hanwha Techwin, is being produced with 50% indigenous content, which involves the local production of more than 13,000 components per gun by about 500 different manufacturers.

https://www.janes.com/article/85878/india-launches-first-private-sector-howitzer-facility

Sur le même sujet

  • Contract Awards by US Department of Defense - June 24, 2019

    25 juin 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

    Contract Awards by US Department of Defense - June 24, 2019

    ARMY TCOM L.P., Columbia, Maryland, was awarded a $978,946,631 hybrid (cost-no-fee, cost-plus-fixed-fee, and firm-fixed-price) contract for the Persistent Surveillance Systems - Tethered engineering, logistics, operations and program management support. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of June 19, 2024. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W56KGY-19-D-0020). Lockheed Martin Corp., Grand Prairie, Texas, was awarded a $561,802,200 hybrid (cost-plus-fixed-fee and fixed-price-incentive) foreign military sales (Bahrain, Poland and Romania) contract for production of Army tactical missile guided missile and launching assembly service life extension program production 3. Bids were solicited via the internet with one received. Work will be performed in Grand Prairie, Texas; Camden, Arizona; Boulder, Colorado; Clearwater, Florida; St. Louis, Missouri; Lufkin, Texas; Windsor Locks, Connecticut; and Williston, Vermont, with an estimated completion date of June 30, 2022. Fiscal 2018 and 2019 missile procurement, Army and foreign military sales funds in the combined amount of $561,802,200 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-19-C-0092). Donjon Marine, Hillside, New Jersey, was awarded a $12,170,000 firm-fixed-price contract for maintenance dredging of portions of the Newark Bay, New Jersey Federal Navigation Project. Bids were solicited via the internet with three received. Work will be performed in Newark, New Jersey, with an estimated completion date of Sept. 30, 2019. Fiscal 2019 civil works funds in the amount of $12,170,000 were obligated at the time of the award. U.S. Army Corps of Engineers, New York, New York, is the contracting activity (W912DS-19-C-0013). DEFENSE LOGISTICS AGENCY Texas Power & Associates,* Palm Harbor, Florida (SPE8EG-19-D-0117); Atlantic Diving Supply, doing business as ADS,* Virginia Beach, Virginia (SPE8EG-19-D-0112); Berger/Cummins, Washington, District of Columbia (SPE8EG-19-D-0113); Caterpillar Defense, Peoria, Illinois (SPE8EG-19-D-0114); Inglett & Stubbs International, Atlanta, Georgia (SPE8EG-19-D-0115); and QGSI-USA Emergency Power, Houston, Texas (SPE8EG-19-D-0116), are sharing a maximum $900,000,0000 fixed-price, indefinite-delivery/indefinite-quantity contract under solicitation SPE8EG-18-R-0007 for generators. This was a competitive acquisition with eight offers received. These are five-year contracts with no option periods. Locations of performance are Florida, Virginia, Washington, District of Columbia, Illinois, Georgia and Texas, with a June 19, 2024, performance completion date. Using customer is Federal Emergency Management Agency. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. Welch Allyn Inc., Skaneateles Falls, New York, has been awarded a maximum $100,000,000 firm‐fixed‐price, indefinite‐delivery/indefinite‐quantity contract for patient monitoring systems, accessories and training. This is a five-year base contract with one five‐year option period. This was a competitive acquisition with 36 responses received. Location of performance is New York, with a June 24, 2024, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2D1‐19‐D‐0019). Hamilton Sundstrand, Windsor Locks, Connecticut, is to be awarded a $16,532,250 firm-fixed price contract for helicopter flight control computers. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. Location of performance is Arizona. Using military service is the Army. Type of appropriation is fiscal 2019 Army working capital funds. The contracting activity is Defense Logistics Agency Aviation, Redstone Arsenal, Alabama (SPRPA1-13-G-001X/SPRRA1-19-F-0329). NAVY L3 Technologies Inc., Northampton, Massachusetts, is awarded a $73,743,347 indefinite-delivery/indefinite-quantity contract containing cost-plus-fixed-fee, cost-reimbursement and firm-fixed-price provisions. This contract provides for depot-level repair, upgrade and overhaul services for submarine photonics mast programs. Work will be performed in Northampton, Massachusetts (98%), and at various places in the U.S. below one percent (2%) and is expected to be completed by June 2025. Fiscal 2019 other procurement (Navy) funding in the amount of $2,146,169 will be obligated on the first delivery order at time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured, in accordance with 10 U.S. Code 2304(c)(1) - only one source and no other supplies or services will satisfy agency requirements. The Naval Undersea Warfare Center Division Newport, Newport, Rhode Island, is the contracting activity (N66604-19-D-G900). Katmai Integrated Solutions LLC,* Anchorage, Alaska, is awarded a contract ceiling $21,625,000 indefinite-delivery/indefinite-quantity contract with a three year ordering period to provide subject matter support services for Immersive Training Range Support (ITRS) . Work will be performed at Camp Lejeune, North Carolina (40%), Camp Pendleton, California (40%), and Marine Corps Base, Hawaii (20%), and work is expected to be completed June 24, 2022. Fiscal 2019 operations and maintenance (Marine Corps) funds in the amount of $4,877,737 will be obligated on the first task order immediately following contract award and funds will expire the end of the current fiscal year. This contract was not competitively procured. The contract was prepared in accordance with Federal Acquisition Regulation 6.302-5 and 15 U.S. Code 637. The Marine Corps Systems Command, Quantico, Virginia, is the contract activity (M67854-19-D-7835). Advanced Solutions Inc., Washington, District of Columbia, was awarded $16,863,635 for firm-fixed-price modification to a previously awarded task order N00039-18-F-0069 issued against Blanket Purchase Agreement N00104-08-A-ZF42 and the underlying a multiple award schedule in support of Navy Enterprise Resource Planning. This modification exercises an option for cloud and integration support services. Work will be performed in Loudon, Virginia (50%) and Mechanicsburg, Pennsylvania (50%) and is expected to be completed in June 2020. Fiscal 2019 operation and maintenance (Navy) funds in the amount of $16,863,635 will be obligated at the time of the award, which will expire at the end of the current fiscal year. The Naval Information Warfare Systems Command, San Diego, California, is the contracting activity. (Awarded June 20, 2019) AIR FORCE Concentric Security LLC, Sykesville, Maryland (FA8003-19-D-A001); Nasatka Barrier Inc., Clinton, Maryland, (FA8003-19-D-A002); Cherokee Nation Security & Defense LLC., Tulsa, Oklahoma, (FA8003-19-D-A003); and Perimeter Security Partners LLC., Nashville, Tennessee (FA8003-19-D-A004) have been awarded a $45,000,000 firm-fixed-price, multiple award, indefinite-delivery/indefinite-quantity contract for vehicle barriers maintenance and repair services. This contract provides for all personnel, labor, equipment, supplies, tools, materials, supervision, travel, periodic inspection, minor repair, and other items and services necessary to provide maintenance for Air Force vehicle barrier systems. Work will be performed at all Contiguous United States (CONUS) (excluding Alaska and Hawaii) active duty Air Force installations and is expected to be completed by June 23, 2024. These awards are the result of a competitive acquisition and four offers were received. Fiscal 2019 operations and maintenance funds in the amount of $4,000 ($1,000 per awardee) are being obligated at the time of award. The Air Force Installation Contracting Center, Wright-Patterson Air Force Base, Ohio is the contracting activity. Weldin Construction LLC, Palmer, Alaska, has been awarded a $35,000,000 ceiling increase modification (P00004) to previously awarded contract FA4861-17-D-A200 for simplified acquisition of base engineering requirements. This modification will increase the contract value from $35,000,000 to $70,000,000. Work will be performed at Nellis Air Force Base, Nevada and Creech Air Force Base, Nevada, and is expected to be completed by Dec. 2021. No funds are being obligated at the time of award. The 99th Contracting Squadron, Nellis Air Force Base, Nevada, is the contracting activity. DEFENSE ADVANCED RESEARCH PROJECTS AGENCY Leidos Inc., Reston, Virginia, was awarded a modification to exercise an option totaling $8,825,457 to previously awarded contract HR0011-18-C-0127 for a Defense Advanced Research Projects Agency (DARPA) research project. The modification brings the total cumulative face value of the contract to $13,204,195. Work will be performed in Arlington, Virginia; San Diego, California; and King of Prussia, Pennsylvania, with an expected completion date of September 2020. Fiscal 2019 research, development, test and evaluation funds in the amount of $4,600,000 are being obligated at time of award. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1885753/source/GovDelivery/

  • Maintainers Maintain Mission Readiness

    15 août 2019 | International, Aérospatial

    Maintainers Maintain Mission Readiness

    By Airman 1st Class Adriana Barrientos Fighter jets and heavies can rule the skies, but they need to get there first. It takes strict attention to detail from aircraft maintainers to service aircraft in order to launch them to the battlefield. Airmen from the 703rd Aircraft Maintenance Squadron identified and fixed a misplaced spoiler control rod on the E-3 Sentry during a Home Station Check at Joint Base Elmendorf-Richardson, June 3, 2019. Aircraft maintainers play a huge role when it comes to mission readiness. After all, they are responsible for the upkeep of aircraft that fly through the skies. It's imperative for these Airmen to be meticulous, confident and disciplined in order to carry out their mission— inspect aircraft and troubleshoot problems. The 703rd AMXS supports JBER's worldwide contingency and maintenance operations for the 3rd Wing, 11th Air Force, and the North American Aerospace Defense Command. They are responsible for the C-17 Globemaster III, E-3 Sentry, and C-130 Hercules. Crew chiefs assigned to the 703rd AMXS are assigned to either the 962nd or the 517th Aircraft Maintenance Units. One type of aircraft maintained by the 962nd AMU is the E-3 Sentry. As an airborne warning and control system or AWACS aircraft, it performs an essential mission, distinguishing between friendly and enemy activity. It also provides airborne command and control in addition to conducting all-altitude, all-weather surveillance. “I come to work and figure out what the flying and maintenance schedule is for the day,” said U.S. Air Force Staff Sgt. John Hays, 962nd AMU crew chief lead for two E-3B/C aircraft. “On a typical day, we launch one of the jets for a four to six-hour sortie and recover the jet towards the end of the shift. Once the jet lands, the other crew chiefs and I will perform a post-flight inspection and fix anything we find.” As a crew chief, Hays performs visual inspections of the entire structure of the aircraft. These include calendar inspections, which serve to provide constant observation of all components of the aircraft to ensure reliability. It was June 3rd when an issue with the jet's spoiler rod was identified during an in-depth calendar inspection, known as a Home Station Checks. “Calendar inspections vary, but a really important one is the Home Station Check that is completed every 180 days,” said U.S. Air Force Staff Sgt. Brandon Solomons, 962nd AMU crew chief. “One of the biggest things we look for during these inspections is irregular rubbing of moving components. During our mid-shift, Senior Airman Eric Goodholm noticed one of the rods was pushed up against another component in the wing called the flap track gearbox.” In this case, it was the spoiler control rod, which was not damaged but could have potentially caused a major problem during the flight. “A spoiler control rod basically helps lift the spoiler— a vital flight control surface that allows the jet to turn in flight, as well as a brake or slow down the jet during approach and landing,” said Solomon. “The pushrod is not supposed to rub on the gearbox, so myself and our production superintendent performed further investigations,” said Hays. “I identified that the two outboard spoilers follow up pushrods were connected incorrectly to the idler arm, therefore causing the pushrod to rub on the gearbox.” The total time to fix the issue was a combined eight hours, to include an operation check. “I led the fix of the malfunction along with Staff Sgt. Solomons,” said Hays. “We disconnected and reconnected the pushrods to the idler arm correctly, which provided the proper clearance from the gearbox.” These kinds of calendar inspections allow maintainers to identify defects before malfunctions cause serious danger or harm to the aircraft or personnel. In any case, a setback with the aircraft is a setback to the mission. “After ensuring the rod wasn't damaged, we got in touch with Tinker Air Force Base, and they found the same problem on three of their jets,” said Solomons. “This discovery drove a Time Change Technical Order, implemented to prevent flight binding across the fleet.” Time Change Technical Orders, or periodic updates to aircraft that authorize the modification of a system, were pushed to keep the operational tempo on track. As an air defense system, E-3s can detect, identify and track airborne enemy forces far from the boundaries of the United States or NATO countries. It can direct fighter-interceptor aircraft to these enemy targets. Thus being a vital component to the mission in day to day operations. “Something like this could have been easily overlooked, but Senior Airman Goodholm is very thorough and paid great attention to detail,” said Solomons. After the team made modifications and the pushrods were properly connected, a rig check was performed to verify if the spoilers were in the proper configuration. “I can say Senior Airman Goodholm, Staff Sgt. Hays and I contributed by identifying and planning a course of action to fix this issue, but it was an effort as an AMU that fixed the discrepancy,” said Solomons. “With the unit's team effort and strong leadership the problem was identified, fixed and the jet was able to go and perform the mission again.” General maintenance actions and inspections by not only the 703rd AMXS, but all maintainers require attention to detail day in and day out. The lives of the crew and mission success depend on it. https://www.jber.jb.mil/News/News-Articles/Article/1933112/maintainers-maintain-mission-readiness/source/GovD/

  • Exclusive: Ukraine needs more attack aircraft for war effort - ground forces commander
Toutes les nouvelles