8 juillet 2024 | International, Aérospatial

In first, Australian exercise Pitch Black gets dedicated aircraft carrier

Air forces from around the world will descend on Australia’s remote Northern Territory for a combat exercise of unprecedented scale there.

https://www.defensenews.com/training-sim/2024/07/08/in-first-australian-exercise-pitch-black-gets-dedicated-aircraft-carrier/

Sur le même sujet

  • NATO’s ‘Dynamic Messenger’ test uses 5G mesh to link underwater drones

    2 octobre 2023 | International, Naval

    NATO’s ‘Dynamic Messenger’ test uses 5G mesh to link underwater drones

    The eleven-day event focused on testing maritime unmanned systems, or MUS, and demonstrating their interoperability with NATO assets.

  • Tinker cracks down on tool checkouts after ‘lapses’ lead to impounded aircraft

    15 août 2018 | International, Aérospatial

    Tinker cracks down on tool checkouts after ‘lapses’ lead to impounded aircraft

    By: Stephen Losey The 552nd Maintenance Group at Tinker Air Force Base in Oklahoma has issued strict new rules on who can check out tools after several recent “minor lapses” in keeping track of them. In an emailed statement Monday, 552nd Air Control Wing spokesman Ron Mullan said the lapses in tool accountability did not cause any mishaps. However, the lost tool incidents led the 552nd to impound two aircraft to make sure they were safe before returning them to full flying status. “The 552nd Air Control Wing employs a multitude of standard procedures regarding activities in and around aircraft to ensure safety," Mullan said. ”Occasionally, despite sound procedures, we identify emerging trends which cause us to review and adjust these procedures as needed to maintain the highest standards of safety." The 552nd Maintenance Group supports the wing's 28 E-3 Sentry, or AWACS, aircraft. The wing's official website said those planes are worth a total of $8.4 billion. “Ensuring the safety, health and welfare of the men and women of the 552nd Air Control Wing is always a top priority and essential to mission effectiveness,” wing commander Col. Geoffrey Weiss said in a Thursday email. “Therefore, I have asked our maintenance group commander and his team to review tool checkout and accountability procedures and make necessary changes to ensure our ground and flight operations remain fully safe and effective across the full range of our mission responsibilities.” Full Article: https://www.airforcetimes.com/news/your-air-force/2018/08/14/tinker-cracks-down-on-tool-checkouts-after-lapses-lead-to-impounded-aircraft/

  • Army validates design for future helicopter engine, remains on track despite COVID

    13 août 2020 | International, Aérospatial, Terrestre

    Army validates design for future helicopter engine, remains on track despite COVID

    By: Jen Judson WASHINGTON — The Army has validated its design for its future helicopter engine, and the program remains on schedule to deliver the first engine for testing in the fourth quarter of fiscal 2021, according to service officials in charge of the effort. The Improved Engine Turbine Program (ITEP) has seen a long — and often delayed — journey as the service wrestled with funding and development strategies for several years. ITEP will replace current engines in both UH-60 Black Hawk utility helicopters and AH-64 Apache attack helicopters Since awarding a contract to General Electric Aviation in February 2019, the program has pushed forward on schedule, despite a protest from a competing team comprised of Honeywell and Pratt & Whitney, which paused work for roughly three months. And, while the Coronavirus pandemic caused some anxiety among Army officials trying to keep the program on track, those in charge were able to complete the critical design review, conducted 100 percent virtually, according to Army spokesman David Hylton. The ITEP Critical Design Review (CDR) was a multi-month process that consisted of three phases, Hylton told Defense News in a written statement. The engine control system component CDR was completed on June 5, followed by the software CDR on July 17 and the engine systems CDR on July 24, he said. The Army and GE are making “tremendous efforts to keep COVID-19 impacts from delaying the program,” Hylton wrote. GE is now working toward a test readiness review ahead of the first engine test. “We are full steam ahead in terms of understanding where we need to go next with respect to the design, Col. Gregory Fortier, who is in charge of the program office for the Army's Future Attack Reconnaissance Aircraft, said during a media briefing last month. The Army has “no reason to believe we will not fly” in fiscal 2023, he said. According to FY21 Army budget request justification documents, the service plans to fly an aircraft with an ITEP engine installed in the first quarter of FY23 followed by a low-rate initial production decision in the fourth quarter of FY24. A full-rate production decision is expected in FY26. https://www.defensenews.com/land/2020/08/12/army-validates-design-for-future-helicopter-engine-remains-on-track-despite-covid/

Toutes les nouvelles