14 juin 2023 | International, Aérospatial

Germany to use Saab system to enable Eurofighter for electronic warfare role

Germany plans to use a system made by Saab as it aims to enable Eurofighter jets for a role in electronic warfare, according to a document seen by Reuters on Wednesday.

https://www.reuters.com/world/europe/germany-use-saab-system-enable-eurofighter-electronic-warfare-role-2023-06-14/

Sur le même sujet

  • Contract Awards by US Department of Defense - March 18, 2019

    20 mars 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

    Contract Awards by US Department of Defense - March 18, 2019

    NAVY General Dynamics Electric Boat, Groton, Connecticut, is awarded a $2,039,763,908 modification to previously awarded contract N00024-17-C-2100 for additional material (to include Long Lead Time Material and Economic Ordering Quantity) associated with the Fiscal 2019 – Fiscal 2023 Virginia class submarines (SSNs 802 – 811). Work will be performed in Sunnyvale, California (19 percent); Annapolis, Maryland (6 percent); Tucson, Arizona (3 percent); Spring Grove, Illinois (3 percent); Stoughton, Massachusetts (3 percent); Bethlehem, Pennsylvania (3 percent); Jacksonville, Florida (3 percent); Arvada, Colorado (3 percent); Minneapolis, Minnesota (2 percent); Groton, Connecticut (2 percent); Windsor Locks, Connecticut (2 percent); Florence, New Jersey (2 percent); York, Pennsylvania (2 percent); Arlington, Texas (2 percent); Newport News, Virginia (2 percent); Depew, New York (1 percent); Peoria, Illinois (1 percent); Warren, Massachusetts (1 percent); Manassas, Virginia (1 percent); Portsmouth, New Hampshire (1 percent); El Cajon, California (1 percent); Fort Walton Beach, Florida (1 percent); Farmingdale, New York (1 percent); South El Monte, California (1 percent); Cleveland, Ohio (1 percent); Philadelphia, Pennsylvania (1 percent); Syracuse, New York (1 percent); Manchester, New Hampshire (1 percent); Westfield, Massachusetts (1 percent); Loanhead, United Kingdom (1 percent); Linden, New Jersey (1 percent); Louisville, Kentucky (1 percent); Orrville, Ohio (1 percent); and other U.S. sites, each less than 1 percent (25 percent). Fiscal 2019 and 2018 shipbuilding and conversion (Navy) funding in the amount of $2,039,763,908 will be obligated at time of award and will not expire at the end of the current fiscal year. The statutory authority for this sole-source award is in accordance with Federal Acquisition Regulation 6.302-1(a)(2)(iii) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Advantaged Solutions Inc., Washington, District of Columbia (N66001-19-A-0008); Alamo City Engineering, San Antonio, Texas (N66001-19-A-0009); Carahsoft Technology Corp., Reston, Virginia (N66001-19-A-0010); and Oakland Consulting Group, Lanham, Maryland (N66001-19-A-0011), are awarded a multiple-award, firm-fixed-price, Department of Defense (DoD) Enterprise Software Initiative (ESI) blanket purchase agreement (BPA) in accordance with the firms' General Services Administration (GSA) Federal Supply Schedule contracts. The overall estimated value of this BPA is $975,980,000. The four individual agreements are awarded for SAP Public Services Inc. (SAP) commercial-off-the-shelf software; software maintenance support; information technology professional services; and Cloud services in support of DoD ESI and under the direction of Office of Management and Budget Enterprise Software Category Team. The BPA provides for purchase of these products and services by the DoD, U.S. intelligence community, Coast Guard, and the federal government community world-wide. The ordering period will be for a maximum of 10 years from March 12, 2019, through March 11, 2029. This BPA is issued under DoD ESI in accordance with the policy and guidelines in the Defense Federal Acquisition Regulation Supplement, Section 208.74. This BPA will not obligate funds at the time of award. Funds will be obligated as task orders using operations and maintenance (DoD) funds. Requirements will be competed among the awardees in accordance with Federal Acquisition Regulation 8.403-3(c)(2), and the successful contractor will receive firm-fixed-price orders. This BPA was competitively procured via the GSA E-Buy website among 679 vendors. Four offers were received and four selected for award. Naval Information Warfare Center Pacific, San Diego, California, is the contracting activity. East Coast Repair and Fabrication LLC,* Norfolk, Virginia, is awarded a not-to-exceed $212,967,725 firm-fixed-price, indefinite-delivery/indefinite-quantity (IDIQ) multiple award contract (MAC) for ship repair, maintenance, and modernization of surface combatants (DDG and CG) class ships and amphibious (LSD, LPD and LHD) class ships homeported in Mayport, Florida, under Lot 1. This award was made under rolling admissions of the current IDIQ-MAC Lot 1. This contract includes options which, if exercised, would bring the cumulative value of this contract to $376,964,825. Work will be performed in Mayport, Florida, and is expected to be complete by November 2019. If all options are exercised work is expected to continue through November 2021. Fiscal 2019 operations and maintenance (Navy) funding in the amount of $10,000 will be obligated at time of award and will expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with one offer received. The Southeast Regional Maintenance Center, Mayport, Florida, is the contracting activity (N4002719D1001). Raytheon Missile Systems, Tucson, Arizona, is awarded a $97,784,232 cost only modification to previously awarded contract N00024-19-C-5418 for long-lead material in support of fiscal 2019 Evolved Sea Sparrow Missile (ESSM) Block 2 low-rate initial production requirements. The Evolved SEASPARROW Missile (ESSM) program is an international cooperative effort to design, develop, test, and procure ESSM missiles. The ESSM provides enhanced ship defense. Work will be performed in Ontario, Canada (14 percent); Andover, Massachusetts (11 percent); Munich, Germany (11 percent); Edinburgh, Australia (10 percent); San Jose, California (9 percent); Hengelo, Netherlands (8 percent); Madrid, Spain (6 percent); Nogales, Mexico (5 percent); Athens, Greece (5 percent); Aarhus, Denmark (4 percent); Ankara, Turkey (4 percent); West Village, California (4 percent); Cincinnati, Ohio (4 percent); Canton, New York (2 percent); Portland, Oregon (1 percent); Marinha Grande, Portugal (1 percent); and Tampa, Florida (1 percent), and is expected to be completed by March 2023. Non-expiring other funds; fiscal 2019 and 2018 weapons procurement (Navy); and fiscal 2018 and 2017 other procurement (Navy) and funding in the amount of $20,930,156 will be obligated at time of award, and funds in the amount of $26,881 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. BAE Systems Technology Solutions and Services Inc., Rockville, Maryland, is awarded a $93,962,658 firm-fixed-price, cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract to design, procure, integrate, test, train, deliver, and support command, control, communications, computers and intelligence (C4I) systems, information and computer systems, and sensor systems for various platforms, including ships, unmanned aerial systems (UAS), shore installations and ground based systems. Services are in support of Program Executive Office (PEO) Ships, the Naval Sea Systems Command, Naval Air Systems Command, PEO C4I, and other federal agencies. Work will be performed in St. Inigoes, Maryland (35 percent); and various locations throughout the continental U.S. (65 percent), and is expected to be completed in March 2025. No funds will be obligated at time of award; funds will be obligated on individual task orders as they are issued. This contract was competitively procured via an electronic request for proposals; two offers were received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00019-19-D-0047). RAM-System, Gesellschaft Mit Beschrankter Haftung, Ottobrunn, Germany, is awarded 81,411,978 Euro and $1,137,479 for firm-fixed-price definitization modification PZ000 to previously undefinitized contract N00024-18-C-5403 for fiscal 2018-2919 German Navy's requirements for Rolling Airframe Missile (RAM) MK 49 guided missile launching systems, and associated shipboard hardware and spares. This contract will be funded 100 percent by the Federal Republic of Germany. The RAM MK 31 guided missile weapon system is an international cooperative development, production and in-service program between the U.S. and German governments. The participating governments operate under a series of memorandums of agreement/memorandums of understanding that establish the business principles for program execution along with contracting and financial agreements. RAM is a missile system designed to provide anti-ship missile defense for multiple ship platforms. This contract includes options which, if exercised, would bring the cumulative value of this contract to 121,271,557 Euro and $29,619,115. Work will be performed in Tucson, Arizona (21 percent); Louisville, Kentucky (21 percent); Ulm, Germany (17 percent); Roethenbach, Germany (16 percent); Schrobenhausen, Germany (16 percent); Ottobrunn, Germany (9 percent); and is expected to be complete by December 2023. German funding in the amount of 61,709,018 Euro and $1,137,479 will be obligated at the time of award and funds will not expire at the end of the current fiscal year. This contract was not competitively procured under the exception 10 U.S. Code 2304(c)(4), International Agreement. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Research and Engineering Development LLC, California, Maryland, is awarded a $42,791,557 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract to provide engineering services in support of the Naval Air Warfare Center Aircraft Division Human Systems Department. The Human Systems Department identifies, develops, and implements Human Engineering and Human Systems Integration analysis and design solutions for various Navy and Marine Corps aviation flight and weapon systems, and their associated maintenance and training elements. Work will be performed in Patuxent River, Maryland, and is expected to be completed in March 2022. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was competitively procured via an electronic request for proposal; two offers were received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-19-D-0042). Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded $14,587,657 for modification P00003 to a previously issued firm-fixed-price delivery order (N0001918F2048) placed against basic ordering agreement N00019-14-G-0020. This order procures 62 low-rate initial production Organic Light Emitting Diode Helmet Display Units and spares in support of the F-35 Lightning II Joint Strike Aircraft for the Navy and Marine Corps. Work will be performed in Fort Worth, Texas, and is expected to be completed in February 2020. Fiscal 2017 and 2019 aircraft procurement (Navy and Marine Corps) funds in the amount of $14,587,657 will be obligated at time of award, $11,764,239 of which will expire at the end of the fiscal year. This order combines purchases for the Navy ($7,293,829; 50 percent) and Marine Corps ($7,293,828; 50 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Wiley Wilson Burns & McDonnell JV, Alexandria, Virginia, is awarded $9,337,864 for firm-fixed-price task order N4008019F4289 under a previously awarded, indefinite-delivery/indefinite-quantity contract (N40080-15-D-0452) for the preparation of a design bid build construction package for the construction of the Wargaming Center at Marine Corps Base Quantico, Virginia. The design bid build construction package consists of full plans, specifications, detailed cost estimate, and other services as requested by the scope of work. The package is to constructs a new wargaming facility, parking structure, and area distributed node facility. The project replaces the Cinder City Switching Station and demolishes eight existing structures in the project area. Work will be performed in Quantico, Virginia, and is expected to be completed by October 2020. Fiscal 2019 military construction, planning and development, contract funds in the amount of $9,337,864 are obligated on this award and will not expire at the end of the current fiscal year. One proposal was received for this task order. Naval Facilities Engineering Command Washington, Washington, District of Columbia, is the contracting activity. AIR FORCE Scientific Applications Research Associates Inc., Cypress, California, has been awarded a $100,000,000 indefinite-delivery/indefinite-quantity contract for the Golden Horde Science and Technology demonstration effort. This contract provides for support research and development of emerging munition technologies, as well as integrated weapon demonstrations. The effort is conceptualized as a fast-paced Air Force Research Laboratory-led demonstration project executed under the auspices of the Team Eglin Weapon Consortium. Work will be performed in Cypress, California, and is expected to be complete by December 2021. This award is the result of a competitive acquisition under the Small Business Innovation Research Program. Fiscal 2019 research and development funds in the amount of $15,000,000 are being obligated on the first task order at the time of award. Air Force Research Laboratory, Eglin Air Force Base, Florida, is the contracting activity (FA8651-19-D-0072). ARMY Torch Technologies Inc., Huntsville, Alabama, was awarded an $8,815,000 modification (000057) to contract W31P4Q-09-A-0021 for strategic systems engineering, integration, test and analysis. Work will be performed in Huntsville, Alabama, with an estimated completion date of March 17, 2020. Fiscal 2019 research, development, test and evaluation funds in the amount of $8,815,000 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1788196/

  • Infantry Squad Vehicle is a cramped ride, but US Army says it meets requirements

    26 janvier 2021 | International, Terrestre

    Infantry Squad Vehicle is a cramped ride, but US Army says it meets requirements

    By: Jen Judson WASHINGTON — The U.S. Army's new Infantry Squad Vehicle is a cramped ride and offers limited protection from certain threats, according to a recent report from the Pentagon's chief weapons tester, but it still meets the service's requirements in tests and evaluations, the product lead told Defense News. The ISV “key requirements are being met and we are increasing soldier operational readiness by providing an operationally relevant vehicle that can transport small tactical units to a dismount point faster and in better physical and mental condition for the fight,” said Steven Herrick, the Army's product lead for ground mobility vehicles within the Program Executive Office Combat Support and Combat Service Support. The vehicle was designed for easy transport to operational environments with the infantry's current rotary and fixed-wing transport platforms. The key performance parameters required that the vehicle's weight not exceed 5,000 pounds and that it fit inside a CH-47 Chinook cargo helicopter. Those requirements “force dimensional requirements only allowing the vehicle to be a certain height, width and length,” he said. The requirements led to a vehicle that makes it hard for soldiers with all their gear needed for a 72-hour mission to comfortably fit inside and be able to access rucksacks on the move. The Army assessed three vendors in developmental testing from December 2019 through January 2020. The service chose General Motors Defense to supply the vehicle to the force, with the company beating out an Oshkosh Defense and Flyer Defense team as well as an SAIC and Polaris team. All offerings were capable of carrying a nine-soldier infantry squad with weapons and equipment during movement, the director of operational test and evaluation said in the report. But the Pentagon also noted the ISV “has not demonstrated the capability to carry the required mission equipment, supplies and water for a unit to sustain itself to cover a range of 300 miles within a 72-hour period.” The Army, however, has assessed the ISV requirement and solution set is in alignment, Herrick said. The DOT&E report, he said, “indicates a desire to include more equipment than a standard nine-soldier squad would carry on a 72-hour mission.” This lack of space, the report stated, “may create a logistics and operational burden” and might limit the type of missions and duration for ISVs. The soldiers that participated in the touch point evaluating the vehicles were asked to bring their Advanced Combat Helmet and Improved Outer Tactical Vest with plates; individual weapon; night vision devices; and ruck with three days' worth of supplies, Herrick said. “All vendors' ISVs are cramped and soldiers cannot reach, stow, and secure equipment as needed, degrading and slowing mission operations,” the report explained. During tests “soldiers on all ISVs could not readily access items in their rucksacks without stopping the movement, dismounting, and removing their rucksacks from the vehicle.” The soldier touch point took into account soldier comfort, visibility and ability to execute the mission, Herrick said. This was all factored into the Army's decision to choose GM Defense's vehicle. “Additionally, no current or planned combat or tactical vehicle allows access to rucksacks while moving to support operator safety,” Herrick noted. “Crew spaces on the ISV are designed to allow mission performance of specific duty tasks.” Units also lacked reliable communication capability, according to the report, using hand-held or manpack radios between 62 and 300 miles. The ISV does not have a mounted radio requirement. “Communication between the squad leader, soldiers, and the platoon leader was intermittent and not reliable,” the report found. Because of the concept of the ISV providing an effective aid to insert soldiers into combat operations, the requirements support just what the soldier carries, so there is no mounted requirement yet, Herrick said. That requirement could be added as a growth capability later. The DOT&E report also noted that the ISV doesn't have an underbody and ballistic survivability requirement, which could mean the unit would be susceptible to certain threats, but the ISV's speed as well as its small, low profile might help deal with those issues. Adding protection to the vehicle would sacrifice the speed the squad needs to rapidly inject itself into operations. Overall, GM Defense's vehicle had the highest reliability among the three vendors, demonstrating 585 mean miles between operational mission failures. The Army's user requirement is 1,200 mean miles for that situation. Herrick noted that reliability and maintainability testing was not scheduled or conducted by Army Test and Evaluation Command or the program office, so the calculations used in the DOT&E report were “not supported by traditional [reliability and maintainability] RAM elements, such as scoring conferences and time for the vendor to implement changes.” The mileage accumulated and referenced in the report was “not meant to evaluate RAM by the Army, but rather to provide the program office and contractor an initial insight on the capability of the system over 500 miles,” Herrick added. The vehicle's RAM testing is scheduled to begin this month, he added.. The service wasn't able to evaluate every aspect of the vehicle before moving into production, but it plans to test the vehicle's ability to be carried by a Chinook during its initial operational test and evaluation this year. Now that the Army has chosen the GM Defense vehicle, it has already initiated developmental testing that will lead to an initial operational test and evaluation in August 2021 at Fort Bragg, North Carolina. That testing began in November 2020. https://www.defensenews.com/land/2021/01/25/infantry-squad-vehicle-is-a-cramped-ride-but-army-says-it-meets-requirements/

  • IAV 2024: Dutch CV90 MLU releases new firepower and survival tech

    24 janvier 2024 | International, Terrestre

    IAV 2024: Dutch CV90 MLU releases new firepower and survival tech

    Since 2009, the CV90 has been the backbone of the Royal Netherlands Army.

Toutes les nouvelles