6 décembre 2019 | International, Terrestre

FLIR Wins U.S. Army Heavyweight Robot Contract Worth Up to $109M

Arlington, Va., December 4, 2019 - FLIR Systems, Inc. (NASDAQ: FLIR) announced that its Kobra™ robot has been chosen for the United States (U.S.) Army's Common Robotic System-Heavy (CRS-H) program. The five-year production contract to build upwards of 350 unmanned ground vehicles (UGVs) is worth up to $109 million.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20191204005221/en/

The CRS-H program will give the Army a ‘program of record' to build and sustain a fleet of large UGVs for years to come. The CRS-H platform calls for a robot weighing up to 700 pounds. Army Explosive Ordnance Disposal (EOD) units will use the system to perform a range of missions, such as disarming vehicle-borne improvised explosive devices (VBIEDs), unexploded ordnance, or related heavy-duty tasks. A variety of sensors and payloads also can be added to the UGV to support other missions.

“We are pleased to be selected for the U.S. Army's CRS-H program and deliver lifesaving robotic technology to our soldiers,” said Jim Cannon, president and CEO at FLIR. “This award exemplifies why we acquired Endeavor Robotics earlier this year — to capture strategic programs of record that enable us to integrate advanced solutions for the warfighter, give us the fuel to grow our business, and strengthen our position as a leader in unmanned systems.”

Over several months and two rounds of testing, the Army compared the FLIR Kobra with other vendor systems. Entrants were evaluated on robot reliability, maneuverability, and usability, among other factors before Kobra was selected as the winner. Previously, in 2017 the Army chose FLIR's legacy business, Endeavor Robotics, as its medium-sized UGV provider through the Man Transportable Robotic System Increment II (MTRS Inc II) contract. FLIR is delivering its Centaur™ UGV under this on-going program.

“Our CRS-H platform will give soldiers a powerful, extremely mobile, yet highly transportable UGV, ready to deploy at a moment's notice to keep them out of harm's way,” said David Ray, president of the Government and Defense Business Unit at FLIR. “This win is a testament to our employees who've designed such an advanced, multi-mission UGV. We look forward to working with the Army to get this robot into the field and deployed with our warfighters.”

FLIR Kobra delivers unmatched strength, power, and payload support in an easy-to-operate robot package. Kobra has a lift capacity of 330 lbs. (150 kg.) and can stretch up to eleven-and-a-half feet to access hard-to-reach places. Ready for indoor and outdoor use, Kobra maintains mobility on tough terrain and can overcome obstacles such as jersey barriers.

The award covers a five-year production period with shipments beginning in the second quarter of 2020.

For more on FLIR Systems' Unmanned Ground Systems platforms, visit www.flir.com/UIS/UGS.

About FLIR Systems, Inc.

Founded in 1978, FLIR Systems is a world-leading industrial technology company focused on intelligent sensing solutions for defense, industrial, and commercial applications. FLIR Systems' vision is to be “The World's Sixth Sense,” creating technologies to help professionals make more informed decisions that save lives and livelihoods. For more information, please visit www.flir.com and follow @flir.

Sur le même sujet

  • BAE's $1.3 Billion Contract for Howitzer Delayed by U.S. Army

    19 juillet 2018 | International, Terrestre

    BAE's $1.3 Billion Contract for Howitzer Delayed by U.S. Army

    By Anthony Capaccio The U.S. Army is delaying approval of full-scale production of BAE Systems Plc's new self-propelled howitzer, citing the need to improve quality before proceeding with additional contracts options valued at about $1.3 billion. The Army postponed triggering the most lucrative phase of the program for London-based BAE to “adequately address quality control issues,” service spokeswoman Ashley John said in an email Wednesday. “The Army will continue to work closely with BAE leadership to resolve the concerns.” The delay came after Bloomberg News reported last week that the howitzer's manufacture was hobbled by poor welding, supply-chain problems and delivery delays. Among the setbacks have been a six-month halt in deliveries last year because of welding flaws and the return of 50 of 86 vehicles that had already been delivered to repair production deficiencies. The U.S. Army is delaying approval of full-scale production of BAE Systems Plc's new self-propelled howitzer, citing the need to improve quality before proceeding with additional contracts options valued at about $1.3 billion. The Army postponed triggering the most lucrative phase of the program for London-based BAE to “adequately address quality control issues,” service spokeswoman Ashley John said in an email Wednesday. “The Army will continue to work closely with BAE leadership to resolve the concerns.” The delay came after Bloomberg News reported last week that the howitzer's manufacture was hobbled by poor welding, supply-chain problems and delivery delays. Among the setbacks have been a six-month halt in deliveries last year because of welding flaws and the return of 50 of 86 vehicles that had already been delivered to repair production deficiencies. Self-propelled 155mm howitzers are the centerpiece of the Army's artillery. The weapon is mounted on a tracked vehicle and travels with another that hauls ammunition. The Army's “long-range precision strike” program tops the service's list of modernization priorities. “We are working very closely” with the Army and the Defense Contract Management Agency, which oversees contractor performance, “and are confident the actions we have taken will support the effective transition to full production,” BAE spokeswoman Alicia Gray said in a statement. The Army eventually wants to buy 576 howitzers and ammunition carriers in an $8.1 billion program. An initial $413.7 million contract laying the groundwork for full production was awarded in December. A full-production decision would have increased vehicle production to about 60 from 48 a year. The program has been in low-rate production for several years. Gray said last week that the company is investing about $125 million to upgrade equipment to prepare “for an expanded production portfolio and accommodate the expected surge in customer requirements.” ‘Tough-Love' Approach The delay “is consistent with the increasing Army ‘tough-love' approach to contractor program-execution challenges,” such as its continuing refusal to accept delivery of Boeing Co.'s AH-64 Apache attack helicopters because of corrosion of a critical rotor assembly part that needs to be fixed, according to James McAleese of McAleese & Associates, a McLean, Virginia-based defense consulting firm. Contractors should expect “quality assurance scrutiny to increase” as the Army “drives aggressive increases in multiple production programs” for missiles, ammunition and ground combat vehicles, he said. Sections of the howitzers are initially produced at BAE's York, Pennsylvania, facility with final assembly in Elgin, Oklahoma. The program has a strong advocate in Senator Jim Inhofe of Oklahoma, the No. 2 Republican on the Senate Armed Services Committee. In its version of the fiscal 2019 defense policy bill, the panel authorized spending $110 million more than the $351.8 million requested. In a new report, the Pentagon's testing office said that testing of the howitzer at Fort Riley in Kansas found it was “operationally effective,” providing accurate fire as it traveled with other units of a brigade combat team while evading enemy counter-fire. That, however, is when the howitzers weren't dogged by reliability problems, according to the report by testing office Director Robert Behler. It cited “the number of breech, cannon, and firing train sub-component failures” and “interruptions from stuck and ruptured primers” that “contributed to delays in mission completion.” The Army's leadership is on a campaign to assure the public it's improving the oversight of its major acquisition programs, including getting its new Futures Command ready for initial operations. The Army last week chose Austin, Texas, as the location for the command that will consolidate brainpower to evaluate future threats facing the Army, decide on the technology needed to counter them and oversee development of that technology through existing commands. https://www.bloomberg.com/news/articles/2018-07-18/bae-s-1-3-billion-contract-for-howitzer-delayed-by-u-s-army

  • US must dominate in space to win future wars, Marine Corps’ Glavy says

    11 décembre 2023 | International, Terrestre

    US must dominate in space to win future wars, Marine Corps’ Glavy says

    The U.S. is not alone in its appreciation of space and the potential advantages it affords.

  • US Army triggers start of possible ground mobility vehicle competition after long delay

    10 octobre 2018 | International, Terrestre

    US Army triggers start of possible ground mobility vehicle competition after long delay

    By: Jen Judson WASHINGTON — The Army seemed geared toward holding a rapid competition to buy a Ground Mobility Vehicle in 2016, but the plan was delayed without much explanation in favor of buying an interim vehicle already in use by special operations forces. Buying the GMV was a top priority following the fall 2015 release of the Army's Combat Vehicle Modernization Strategy, which called for such a vehicle in future and current operations. After a competition never materialized, however, rumors began to swirl that the Army may decide to buy more of the U.S. Special Operations Command's GMV — General Dynamics Ordnance and Tactical Systems' Flyer 72 — even after the service had spent several years prior testing a wide variety of commercial off-the-shelf options. But Congress spurred the effort in its fiscal 2018 defense policy bill, mandating the Army hold a competition and move forward with a program. The Program Executive Office Combat Support and Combat Service Support's product lead for the GMV has quietly stated on its website that the Army plans to pursue a competition for the GMV — calling it an Infantry Squad Vehicle — as a formal program of record. The office states that it is projected to enter into a production contract in fiscal 2020 to procure 2,000 vehicles, roughly a year later than originally planned. The Army took a big step forward on Sept. 24, releasing a market survey to industry, via the Federal Business Opportunities website, soliciting offerings for an Infantry Squad Vehicle. The notice states the service is looking for a vehicle that provides mobility for a nine-soldier infantry squad as well as its associated equipment to “move around the close battle area.” The vehicle should be lightweight, highly mobile and transportable “by all means” to include CH-47 Chinook cargo helicopters, UH-60 Black Hawk utility helicopters and by Low Velocity Air Drop. Responses to the solicitation are due on Oct. 26. While the Army has already bought quantities of the SOCOM vehicle for five airborne infantry brigade combat teams, other companies have continued to wait in the wings for the possibility to compete. And the pool of readily available ultralight vehicles is deep. In addition to GD's Flyer, these vehicles all participated in vehicle demonstrations at Fort Bragg, North Carolina, in 2014: Boeing-MSI Defense's Phantom Badger. Polaris Defense's air-transportable off-road combat vehicle DAGOR. Hendrick Dynamics' Commando Jeep. Vyper Adamas' Viper. Lockheed Martin's High Versatility Tactical Vehicle, which is a version of the British Army's HMT-400 Jackal. The Army launched its new-start GMV program in 2017 as planned, based off the service's new combat vehicle modernization strategy released in 2016, which called for the capability. The Army planned to reach a full-rate production decision on a vehicle by the end of FY19. But then it decided to split GMV procurement into two phases in the FY18 budget request and, in the first phase, planned to exclusively buy 295 of GD's Flyers through a previously awarded contract with U.S. Special Operations Command. The second phase would open up into a competition to build 1,700 more GMVs. Procuring the GMV vehicles from SOCOM raised the unit cost of the vehicle higher than the unit cost of ones that would have been procured through competition, according to FY18 budget documents. https://www.defensenews.com/digital-show-dailies/ausa/2018/10/09/us-army-triggers-start-of-possible-ground-mobility-vehicle-competition-after-long-delay

Toutes les nouvelles