11 juillet 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

Contract Awards by US Department of Defense - July 10, 2019

NAVY

Wyle Laboratories Inc.,* Huntsville, Alabama, is being awarded an $81,220,643 cost-plus-fixed-fee, cost-reimbursable, indefinite-delivery/indefinite-quantity contract. This contract provides for certified and qualified operational contractor support services aircrew to support mission essential testing and evaluation of all manned air vehicles under the operational responsibility of the Naval Test Wing Atlantic/Pacific squadrons. Work will be performed at the Naval Air Station (NAS) Patuxent River, Maryland (94%); NAS Pt. Mugu, California (5%); and NAS China Lake, California (1%), and is expected to be completed in September 2024. No funds are being obligated at time of award; funds will be obligated on individual task orders as they are issued. This contract was competitively procured via an electronic request for proposals; two offers were received. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00421-19-D-0071).

CCI Construction Services LLC,* Honolulu, Hawaii (N62478-16-D-4012); Dawson Federal Inc.,* Honolulu, Hawaii (N62478-16-D-4014); and TKH-ASI LLC,* Kahului, Hawaii (N62478-16-D-4016), are being awarded a $75,000,000 firm-fixed-price modification to increase the maximum dollar value of an indefinite-delivery/indefinite-quantity, multiple award design-build/design-bid-build construction contract for construction projects located primarily within the Naval Facilities Engineering Command (NAVFAC) Hawaii area of operations (AO). The work to be performed provides for, but is not limited to labor, supervision, tools, materials and equipment necessary to perform new construction, repair, alteration and related demolition of existing infrastructure based on design-build, or design-bid-build (full plans and specifications) for infrastructure within the state of Hawaii. After award of this modification, the total cumulative contract value will be $320,000,000. No task orders are being issued at this time. Work will be performed at various Navy, Marine Corps, Air Force and miscellaneous federal and other facilities in the NAVFAC Hawaii AO. Work is expected to be completed by June 2021. No funds will be obligated at time of award; funds will be obligated on individual task orders as they are issued. Task orders will be primarily funded by operations and maintenance (Navy); and Navy working capital funds. NAVFAC Hawaii, Pearl Harbor, Hawaii, is the contracting activity. (Awarded July 9, 2019)

Paradigm Mechanical Corp.,* Lemon Grove, California, is being awarded an indefinite-delivery/indefinite-quantity contract with a maximum amount of $49,000,000 for plumbing, heating, and air conditioning construction alterations, renovations and repair projects at Naval Air Weapons Station, China Lake; Marine Corps Air Ground Combat Center, Twentynine Palms; Marine Corps Logistics Base, Barstow; and Mountain Warfare Training Center, Bridgeport. Projects will be primarily design-bid-build (fully designed) task orders with minimal design effort (e.g. shop drawings). Projects may include, but are not limited to, alterations, repairs, and construction of plumbing, heating, and air-conditioning system installation projects. Work will be performed in China Lake, California (25%); Twentynine Palms, California (25%); Barstow, California (25%); and Bridgeport, California (25%). The term of the contract is not to exceed 60 months with an expected completion date of July 2024. Fiscal 2019 operations and maintenance, (Navy) (O&M, N) contract funds in the amount of $5,000 are being obligated at time of this award and will expire at the end of the current fiscal year. Future task orders will be primarily funded by O&M, N. This contract was competitively procured via the Navy Electronic Commerce Online website with one proposal received. Naval Facilities Engineering Command Southwest, San Diego, California, is the contracting activity (N62473-19-D-2602).

R.C. Construction Co. Inc., Greenwood, Mississippi, is being awarded a $33,116,313 firm-fixed-price contract for construction of range improvements and modernization located at Marine Corps Recruit Depot, Parris Island, South Carolina. This project constructs a new rifle range in the same location as the existing Hue City Range. This range will meet applicable Marine Corps requirements for known distance (KD) ranges as set forth in MIL HDBK 1027.3B, range facilities and miscellaneous training facilities other than buildings, and Marine Corps Orders (MCO) 3570.1C, 3550.9, and 3574.2L. Range support buildings to be constructed include target storage, control house and toilet facilities. All facilities will be concrete or reinforced concrete masonry unit structures with stucco exterior and concrete slab on grade. A target-area berm, retaining walls, safety sidewalls, a safety tunnel and 600-yard range berm will be constructed, and sidewalls with acoustic insulation will also be included. Earth berm structures include a behind-the-target bullet impact berm with side and rear retaining walls as appropriate with flat lead mining equipment maintenance surfaces. Built-in equipment will include the target system benches, target numbers and relocated target lifters, flagpoles and firing line benches. Special costs include post construction award services and geospatial mapping and survey. Work will be performed in Parris Island, South Carolina, and is expected to be completed by August 2021. Fiscal 2019 military construction, (Navy) contract funds in the amount of $28,326,200 are being obligated at time of this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website with three proposals received. Naval Facilities Engineering Command Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-19-C-9017).

The Raytheon Co., Tucson, Arizona, is being awarded a $17,777,245 firm-fixed-price contract to procure 114 High Speed Anti-Radiation Missile command launch computers to include two pre-production units, one first article test unit and 111 production units in support of the Navy. Work will be performed in Tucson, Arizona, and is expected to be completed in October 2021. Working capital (Navy); and fiscal 2017, 2018 and 2019 aircraft procurement (Navy) funds in the amount of $17,777,245 will be obligated at time of award, $6,243,087 of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-19-C-0026).

Diversified Maintenance Systems Inc.,* Sandy, Utah, is being awarded a not-to-exceed the amount of $15,000,000 indefinite-delivery/indefinite-quantity contract for commercial and institutional building construction alterations, renovations and repair projects at Naval Weapons Station, Seal Beach. Projects will be primarily design-bid-build (fully designed) task orders with minimal design effort (e.g. shop drawings). Projects may include, but are not limited to, alterations, repairs and construction of administration buildings, maintenance/repair facilities, aircraft control towers, hangars, fire stations, office buildings, laboratories, dining facilities and related structures. Work will be performed in Seal Beach, California. The term of the contract is not to exceed 60 months with an expected completion date of July 2024. Fiscal 2019 operations and maintenance, (Navy) (O&M, N) contract funds in the amount of $5,000 are being obligated at time of this and will expire at the end of the current fiscal year. Future task orders will be primarily funded by O&M, N. This contract was competitively procured via the Navy Electronic Commerce Online website with 13 proposals received. Naval Facilities Engineering Command Southwest, San Diego, California, is the contracting activity (N62473-19-D-2621).

ARMY

Amherst Madison Inc., Charleston, West Virginia (W91237-19-D-0019); and Mi-De-Con Inc.,* Ironton, Ohio (W91237-19-D-0020), will compete for each order of the $49,000,000 firm-fixed-price contract for small construction projects. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of July 9, 2024. U.S. Army Corps of Engineers, Huntington, West Virginia, is the contracting activity.

Burns & McDonnell Engineering Co. Inc., Kansas City, Missouri, was awarded a $49,000,000 firm-fixed-price contract for architect and engineering services. Bids were solicited via the internet with six received. Work locations and funding will be determined with each order, with an estimated completion date of July 9, 2024. U.S. Army Corps of Engineers, Mobile, Alabama, is the contracting activity (W91278-19-D-0032).

Specialized Materials and Chemicals LLC, Brigham City, Utah, was awarded a $38,600,000 firm-fixed-price contract for the procurement of ammonium Perchlorate. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of July 9, 2022. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-19-D-3021).

Walga Ross Group 2 JV,* Topeka, Kansas, was awarded a $21,808,640 firm-fixed-price contract for the construction of the South Access Control Point for the Fort Bliss Replacement Hospital at Fort Bliss, Texas. Bids were solicited via the internet with two received. Work will be performed in El Paso, Texas, with an estimated completion date of Nov. 8, 2020. Fiscal 2018 military construction funds in the amount of $21,808,640 were obligated at the time of the award. U.S. Army Corps of Engineers, Fort Worth, Texas, is the contracting activity (W9126G-19-C-0032).

Seatrax Inc.,* Houston, Texas, was awarded a $15,098,156 firm-fixed-price contract for a new floating crane to perform the duty cycle bank grading work in support of the revetment mission on the Mississippi River. Bids were solicited via the internet with one received. Work will be performed in Houston, Texas, with an estimated completion date of Sept. 30, 2021. Fiscal 2019 operations and maintenance, civil funds in the amount of $15,098,156 were obligated at the time of the award. U.S Army Corps of Engineers, Memphis, Tennessee, is the contracting activity (W912EQ-19-C-0007).

Walga Ross Group 2 JV,* Topeka, Kansas, was awarded a $12,219,560 firm-fixed-price contract for the construction of the North Access Control Point for the Fort Bliss Replacement Hospital at Fort Bliss, Texas. Bids were solicited via the internet with two received. Work will be performed in El Paso, Texas, with an estimated completion date of Nov. 8, 2020. Fiscal 2018 military construction funds in the amount of $21,808,640 were obligated at the time of the award. U.S. Army Corps of Engineers, Fort Worth, Texas, is the contracting activity (W9126G-19-C-0031).

AIR FORCE

Nomlaki Technologies, Sacramento, California, has been awarded a $10,402,000 firm-fixed-price contract for repairing four bridges. This contract provides demolition and disposal of all debris of four reinforced concrete bridges at Beale Air Force Base, in accordance with all local city ordinances, state and federal regulations and design and construction of a bridge system (up to four bridges) to cross the four waterways and replace the original bridges. Work will be performed at Beale AFB, California, and is expected to be completed by Oct. 24, 2020. Fiscal 2019 operations and maintenance funds in the amount of $10,402,000 are being obligated at the time of award. This award is the result of a competitive acquisition with five offers received. The 9th Contracting Squadron, Beale AFB, Marysville, California, is the contracting activity (FA4686-19-C-A004).

DEFENSE LOGISTICS AGENCY

Goodrich Corp., Rome, New York, has been awarded a maximum $9,148,161 firm‐fixed‐price, indefinite-delivery/indefinite‐quantity contract for ball bearing units. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(2) from Federal Acquisition Regulation 6.302‐1. This is a five-year contract with no option periods. Location of performance is New York, with a July 30, 2024, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2024 Army working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Redstone Arsenal, Alabama (SPRRA1‐19‐D‐0077).

*Small business

https://dod.defense.gov/News/Contracts/Contract-View/Article/1901092/source/GovDelivery/

Sur le même sujet

  • Royal Navy vows closer working ties with industry amid shipbuilding changes

    15 septembre 2021 | International, Naval

    Royal Navy vows closer working ties with industry amid shipbuilding changes

    The British Royal Navy wants to make it easier for industry to help the service develop '€œbattle-winning, relevant, and affordable'€ capabilities by developing more transparent requirements and technology priorities.

  • As mission-capable rates languish, Pentagon should embrace digital engineering

    4 février 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    As mission-capable rates languish, Pentagon should embrace digital engineering

    Ben Kassel and Bruce Kaplan While many Pentagon initiatives face a change of course under new Defense Secretary Lloyd Austin, its digital engineering strategy deserves a push forward. The strategy, issued in 2018 by then-Under Secretary of Defense for Research and Engineering Michael Griffin, aimed to help military services harness modern sustainment methods like additive manufacturing, digital twin and augmented reality. For the Department of Defense, enterprisewide implementation of these techniques would lower costs, increase weapon systems' mission-capable rates and afford flexibility in fleet modernization. But digital engineering requires digital, 3D data — and the DoD doesn't have enough. Modern sustainment practices hinge on the availability of what's known as the model-based definition, 3D models and digitized descriptive information for a system or component. Using computer-aided design programs, engineers can manipulate the data to enable practices like condition-based maintenance, eliminating weapon systems' unnecessary downtime. Digital data can facilitate seamless transit from original equipment manufacturers, or OEM, to procurers and sustainers in the field and at maintenance depots worldwide. However, the technical data for most weapons systems remains elusive to the services and their program management offices, or PMO, or the datasets are available only in 2D documentation, such as blueprints. Meanwhile, readiness suffers. Of 46 weapons systems reviewed by the Government Accountability Office, only three achieved annual mission-capable targets at least five times between 2011 and 2019. More than half (24) failed to meet their goal even once, according to GAO's November 2020 report. The KC-13OJ Super Hercules air refueler and the MV-22B Osprey tiltrotor were among the programs to miss their target all nine years. GAO cited inaccessible technical data as a contributing factor for both programs. Of the Super Hercules, the report says: “The Navy and Marine Corps were unable to obtain the technical data of the aircraft ... the lack of the technical data compromises [their] ability to analyze and resolve sustainment issues.” Similar concerns were raised about the P-8A Poseidon anti-submarine aircraft, saying “technical data needed for maintenance has not been readily available to the Navy.” Dozens of systems, including the F-35 fighter jet, face similar obstacles. Notably, the GAO report referred not to 3D, model-based data but rather legacy incarnations: blueprints and documents that may have been converted “digitally” into PDFs. This is a far cry from the machine-readable formats required to use digital engineering technologies across the enterprise. The GAO cited the production of 170 “structural repair manuals” as a means of narrowing the Osprey's technical data gaps. The labor-intensive replication of physical documents — the PMO projected five years to deliver all of them — is a piecemeal solution, at best. Troublingly, modern sustainment methods seem beyond the reasonable expectation of not just PMOs but even forward-looking organizations like the GAO. To foster its DoD-wide implementation, the digital engineering strategy needs reinforcement, which could take the following forms: Champion the availability of model-based technical data in policy. Modern sustainment requires a shift from decadesold practices. Paper data that supports secondhand manuals and haphazard 2D-to-3D conversion should no longer be the norm. Services cannot lead this transition on their own, however. Federal guidance on the acquisition, creation, use and management of authentic, model-based technical data would jump-start the movement toward digital sustainment. Educate PMOs to acquire technical data rights strategically. Policy must be partnered by the right mindset. One reason PMOs don't have technical data is that sometimes they never asked for it. An afterthought at the time of procurement, technical data is often overlooked until maintenance is needed. Then it's too late — or too expensive — to acquire the needed rights. Leadership can encourage PMOs to identify potential sustainment solutions — and the technical data rights needed to execute them — at the time of acquisition. Assert the government's rights to model-based technical data. A sea change in sustainment depends on building unprecedented trust between OEMs and PMOs. OEMs understandably need to protect intellectual property, but their grip on model-based technical data must loosen for digital sustainment to flourish at scale. This can be accomplished without OEMs surrendering their competitive advantage. In many cases, OEMs need not transfer custody of the data itself for sustainment activities. Limited-rights agreements and trusted third-party arrangements can be tailored to enable data availability only when needed or to execute specific solutions. Giving OEMs confidence in these approaches will entail extensive dialogue and commitment by DoD leaders. Given the GAO's assessment, seeking a breakthrough is worth the attempt. Operationalizing the DoD strategy requires work in other areas as well, particularly in removing intra- and inter-organizational stovepipes, and securing the data's transmission and storage. But the first step toward a model-based sustainment enterprise is ensuring the availability of modern technical data. This need will only grow more crucial. Today's sustainment practices too closely resemble those of 30 years ago, not what they should be 30 years from now. We're already playing catch up. It's time to view sustainment with 3D glasses. Ben Kassel is a senior consultant at LMI. He previously worked with the U.S. government on defining and exchanging technical data used for naval architecture, marine and mechanical engineering, and manufacturing. Bruce Kaplan is a fellow at LMI. He previously served as technical director of logistics for research and development at the Defense Logistics Agency. https://www.c4isrnet.com/opinion/2021/02/03/as-mission-capable-rates-languish-pentagon-should-embrace-digital-engineering/

  • RTX’s Pratt & Whitney awarded $65.8 million F100 engine maintenance contract for Saudi Arabia’s F-15s

    2 mai 2024 | International, Terrestre

    RTX’s Pratt & Whitney awarded $65.8 million F100 engine maintenance contract for Saudi Arabia’s F-15s

    The maintenance contract, valued at $65.8 million, supplies spare parts and engine services in support of the Royal Saudi Air Force’s (RSAF) F-15 Eagles.

Toutes les nouvelles