1 février 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

Contract Awards by US Department of Defense - January 29, 2021

ARMY

KBRwyle Technical Solutions LLC, Columbia, Maryland, was awarded a $78,252,029 modification (000286) to contract W52P1J-12-G-0061 for maintenance, supply, transportation and other logistics functions for the Army Prepositioned Stock-3 Charleston Afloat program. Work will be performed in Goose Creek, South Carolina, with an estimated completion date of Sept. 14, 2022. Fiscal 2010 operation and maintenance (Army) funds in the amount of $12,000,000 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity.

High Desert Support Services, Baton Rouge, Louisiana, was awarded a $54,000,000 modification (P00034) to contract W9124B-18-C-0004 for operations support services at Fort Irwin U.S. Army Garrison. Work will be performed in Fort Irwin, California, with an estimated completion date of Jan. 31, 2022. Fiscal 2021 operation and maintenance (Army) funds in the amount of $4,172,214 were obligated at the time of the award. U.S. Army 418th Contracting Support Brigade, Fort Irwin, California, is the contracting activity.

GP Strategies Corp., Columbia, Maryland, was awarded a $40,671,032 cost-plus-fixed-fee contract for life cycle logistics support and chemical demilitarization training facility operations and maintenance to facilitate the mission of the Chemical Materiel Training Facility at Aberdeen Proving Ground, Maryland. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of April 15, 2026. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-21-D-0015).

ACC Construction Co. Inc., Augusta, Georgia, was awarded a $31,229,066 firm-fixed-price contract for construction of a consolidated mission complex at Warner Robins Air Force Base. Bids were solicited via the internet with three received. Work will be performed at Warner Robins Air Force Base, Georgia, with an estimated completion date of Feb. 23, 2023. Fiscal 2017 and 2020 military construction (defense-wide) funds in the amount of $31,229,066 were obligated at the time of the award. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-21-C-0009).

The Boeing Co., Mesa, Arizona, was awarded a $20,333,921 modification (P00070) to contract W58RGZ-16-C-0023 for long lead integrated logistics support, initial spares package and peculiar ground support equipment for the Royal Moroccan Air Force. Work will be performed in Mesa, Arizona, with an estimated completion date of Dec. 31, 2024. Fiscal 2010 Foreign Military Sales (Morocco); and 2019 and 2020 aircraft procurement (Army) funds in the amount of $20,333,921, were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

Lockheed Martin Corp., Orlando, Florida, was awarded a $15,925,901 modification (P00026) to contract W31P4Q-18-C-0130 to develop a second source for the qualification and facilitization of the Electromechanical Control Actuation System for the Hellfire missile. Work will be performed in Orlando, Florida, with an estimated completion date of Aug. 28, 2021. Fiscal 2019 procurement of ammunition (Army) funds in the amount of $3,625,819 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

Vectrus Systems Corp., Colorado Springs, Colorado, was awarded a $15,785,417 modification (P00059) to contract W91RUS-17-C-0010 for information technology services to support the mission of the 2nd Theater Signal Brigade. Work will be performed in Germany and Italy, with an estimated completion date of Jan. 31, 2022. Fiscal 2021 operation and maintenance (Army) funds in the amount of $11,768,377 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity.

Oshkosh Defense LLC, Oshkosh, Wisconsin, was awarded a $15,261,587 modification (P00079) to contract W56HZV-20-C-0050 to exercise available options for Marine Corps procurement of vehicles and kits for the Joint Light Tactical Vehicle family of vehicles. Work will be performed in Oshkosh, Wisconsin, with an estimated completion date of Oct. 31, 2022. Fiscal 2021 Foreign Military Sales (Macedonia, Slovenia and Montenegro) and 2021 USMC procurement funds in the amount of $15,261,587 were obligated at the time of the award. U.S. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity.

Pond Constructors Inc., Peachtree Corners, Georgia, was awarded a $9,468,778 firm-fixed-price contract to maintain and repair petroleum systems and facilities. Bids were solicited via the internet with two received. Work will be performed in Anchorage, Alaska; Fairbanks Alaska; Delta Junction, Alaska; Shemya, Alaska; King Salmon, Alaska; Pohakuloa, Hawaii; Honolulu, Hawaii; Pearl Harbor, Hawaii; Ewa Beach, Hawaii; and Kaneohe Bay, Hawaii, with an estimated completion date of Jan. 31, 2022. Fiscal 2021 revolving funds in the amount of $9,468,778 were obligated at the time of the award. U.S. Army Corps of Engineers, Huntsville, Alabama, is the contracting activity (W912DY-21-F-0025).

AIR FORCE

Teradyne Inc., North Reading, Massachusetts, has been awarded a $78,232,776 firm-fixed-price requirements contract for the purchase of Versatile Diagnostic Automatic Test Station (VDATS) kits. The VDATS is an organically designed test station with open architecture and virtual modular equipment extensions for instrumentation technology. The VDATS consists of standardized, commercially available test equipment, components and software. There are two configurations of VDATS, the Digital Analog (DA)-1 and DA-2. Currently, these configurations support the A-10, B-1, B-2, B-52, C-5, C-17, C-130, E-3, E-8C, F-15, F16, F-22, H-53, H-60, KC-135 MC-4, MQ-9, Navy ships and UH-1 weapon systems. This contract will consist of five ordering periods with a period of performance of Feb. 1 2021, through Dec. 31, 2025, and work will be performed in North Reading, Massachusetts. No funds are being obligated at the time of award. Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity (FA8571-21-D-0001).

Lockheed Martin, Owego, New York, has been awarded a $64,266,809 supply contract for F-16 Foreign Military Sales (FMS) mission planning. This contract provides for the development, integration, test and delivery of the Joint Mission Planning System Unique Planning Component/Mission Planning Environment software updates. Work will be performed in Owego, New York, and is expected to be completed by January 2029. This contract involves FMS to Slovakia, Bulgaria, Taiwan, Morocco, Greece, United Arab Emirates, Bahrain, Chile, Colombia, Croatia, Egypt, India, Indonesia, Jordan, Korea, Oman, Pakistan, Philippines, Poland, Romania, Singapore, Slovenia and Thailand. This award is the result of a directed-source acquisition. FMS funds in the amount of $17,172,548 are being obligated at the time of award. Air Force Life Cycle Management Center, Hanscom Air Force Base, Massachusetts, is the contracting activity (FA8730-21-C-0001).

Taitech Inc., Dayton, Ohio, has been awarded a not-to-exceed $31,587,310 indefinite-delivery/indefinite-quantity contract (FA8650-21-D-2400) for technology for sustained supersonic combustion (TSSC). The mission of TSSC is to provide research and development for investigation of basic concepts, components, sub-systems, and diagnostics, for high-speed air breathing propulsion systems, airframe structures and internal/external aerodynamics including integration into air vehicles, weapons and launch systems. Work will be performed at Wright-Patterson Air Force Base, Ohio, and is expected to be completed by February 2028. This award is the result of a competitive acquisition and four offers were received. Fiscal 2020 research, development, test and evaluation funds in the amount of $75,000 will fund the initial task order at time of award. Air Force Research Laboratory, Wright-Patterson AFB, Ohio, is the contracting activity. (FA8650-21-F-2402)

Technica Corp., Sterling, Virginia, has been awarded a $22,040,950 cost-plus-fixed-fee task order (FA8307-19-F-0098) for weapon system engineering and maintenance services to include incremental software version development and installation, security patch installations, preventative maintenance, trouble shooting and responsive Tier 1, 2 and 3 support for the Cyberspace Vulnerability Assessment/Hunter weapon system. Work will be performed in Sterling, Virginia, and is expected to be completed Aug. 14, 2025. This award is the result of a competitive acquisition and seven offers were received. Fiscal 2021 research, development, test and evaluation funds; fiscal 2021 operation and maintenance funds; and fiscal 2021 Air National Guard procurement funds, in the full amount are being obligated at the time award. Air Force Life Cycle Management Center, Joint Base San Antonio-Lackland, Texas, is the contracting activity (FA8732-14-D-0015).

Booz Allen Hamilton Inc., McLean, Virginia, has been awarded a $21,744,548 cost-plus-fixed-fee modification (P00032) to contract FA8750-17-F-0105 for enterprise exploitation and information assurance. This contract modification provides for additional hours to facilitate development of electro-optical emerging data sources as part of the Assured Cyber Enterprise for the Intelligence Community Program. Work will be performed in McLean, Virginia, and is expected to be completed Sept. 28, 2021. Fiscal 2020 research, development, test and evaluation funds in the amount of $74,381 are being obligated at the time of award. Total cumulative face value of the contract is $71,427,681. Air Force Research Laboratory, Rome, New York, is the contracting activity.

Walga Ross Group, Topeka, Kansas, has been awarded an $8,575,943 firm-fixed-price contract, to repair/replace heat, ventilation and air conditioning to Building 2210 located on Tinker Air Force Base, Oklahoma. The work is expected to be completed June 13, 2022. This award is the result of Tribal/American Native Corp. set aside. Non-expiring Depot Maintenance Activity Group funds in the full amount are being obligated at the time of award. Air Force Sustainment Center, Tinker AFB, Oklahoma, is the contracting activity (FA8137-21-C-0009).

NAVY

Rolls-Royce Corp., Indianapolis, Indiana, is awarded a $72,874,164 firm-fixed-price modification (P00024) to previously awarded contract N00019-17-C-0081. This modification exercises an option to procure 33 production AE1107C V-22 Osprey engines; 14 for the Marine Corps and 19 for the Navy for production of MV-22 and CMV-22 tiltrotor aircraft. Work will be performed in Indianapolis, Indiana, and is expected to be completed in December 2022. Fiscal 2021 aircraft procurement (Navy) funds in the amount of $39,749,544; fiscal 2020 aircraft procurement (Navy) funds in the amount of $11,041,540; and fiscal 2019 aircraft procurement (Navy) funds in the amount of $22,083,080 will be obligated at the time of award, $22,083,080 of which will expire at the end of the current fiscal year. The Naval Systems Command, Patuxent River, Maryland, is the contracting activity.

La Playa Inc. of Virginia,* Chesapeake, Virginia (N64498-21-D-0002); Life Cycle Engineering Inc.,* North Charleston, South Carolina (N64498-21-D-0003); Q.E.D. Systems Inc.,* Virginia Beach, Virginia (N64498-21-D-0004); Epsilon Systems Solutions Inc.,* Portsmouth, Virginia (N64498-21-D-0005); and Continental Tide Defense Systems Inc.,* Wyomissing, Pennsylvania (N64498-21-D-0006), are awarded a combined $67,512,167 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract for the procurement of support services for the Navy's air conditioning and refrigeration systems on all types of military vessels and small crafts. Each awardee will be awarded $2,200 (minimum contract guarantee per awardee) at contract award. Work will be assigned according to individual delivery orders and is expected to be completed by February 2027. It is estimated that work will be performed on the West Coast (41%); outside the continental U.S. (31%); and the East Coast (28%), at the following locations: Norfolk, Virginia; Mayport, Florida; Bremerton, Washington; Pearl Harbor, Hawaii; Yokosuka, Japan; Bahrain; United Arab Emirates; San Diego, California; Groton, Connecticut; Portsmouth, New Hampshire; Seattle, Washington; and Guam. Fiscal 2021 operation and maintenance funding in the amount of $11,000 will be obligated at time of award and will expire at the end of the current fiscal year. All other funding will be made available at the delivery order level as contracting actions occur. This multiple award contract was competitively procured via the Federal Business Opportunities website with five offers received. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity.

Bering Global Solutions LLC,* Anchorage, Alaska, is awarded a maximum-value $44,636,195 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for base operations support services to be performed at Naval Support Activity Northwest Annex, Chesapeake, Virginia. Work will be performed in Chesapeake, Virginia, and is expected to be completed by September 2029. Fiscal 2021 operation and maintenance (Navy) funds in the amount of $4,387,967 for recurring work will be obligated under the initial task order at time of award and will expire at the end of the current fiscal year. Work on the initial task order is expected to be completed by March 2022. This contract was competitively procured via the Federal Business Opportunities website with five proposals received. The Naval Facilities Engineering Systems Command, Atlantic, Norfolk, Virginia, is the contracting activity (N62470-21-D-0006).

The Whiting-Turner Contracting Co., Baltimore, Maryland, is awarded a $32,070,700 firm-fixed-price task order (N400-85-F-4540) under previously awarded multiple-award construction contract N40085-19-D-9070 for the construction of design-build project P224 Operations Support Facility and P999 Training Facility at Joint Expeditionary Base, Little Creek, Virginia. P224 will design and construct an operations support facility. The project includes all pertinent site preparations and site improvements, mechanical and electrical utilities, telecommunications, emergency generator, landscaping, drainage, parking and exterior lighting. Built-in equipment includes equipment cages, passenger/freight elevator, lockers and emergency generator. P999 will design and construct an operations training facility, to include administrative spaces with both private and open offices, open workstations, conference rooms, cage rooms to secure personal belongings, shower rooms and supporting spaces including server rooms, mechanical rooms, restrooms, break rooms, janitor closets and circulation spaces. Work will be performed at Joint Expeditionary Base, Little Creek, Virginia Beach, Virginia, and is expected to be completed by December 2023. Fiscal 2021 military construction funds in the amount of $32,070,700 will be obligated at time of award and will not expire at the end of the current fiscal year. Five proposals were received for this task order. The Naval Facilities Engineering Systems Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity.

The Charles Stark Draper Laboratory, Cambridge, Massachusetts, is awarded a $23,185,000 option under modification P00012 to previously awarded cost-plus-fixed-fee contract N0003020-C-0004 to provide guidance, navigation, and control (GN&C) subject matter expertise and resources to explore and evaluate current maturing concepts and technologies to enable follow on, full-scale development of strategic guidance, navigation, and control solutions for the Second Life Extension (D5LE2) of the Trident II (D5) Strategic Weapon System. This contract also provides research and development into new and alternate GN&C technologies and concepts to support alternate and developing strategic systems programs missions. Work will be performed in Cambridge, Massachusetts (100%), with an expected completion date of Sept. 30, 2021. The contract will be incrementally funded with fiscal 2021 research, development, test and evaluation (Navy) funds in the amount of $5,423,823 and will not expire at the end of the current fiscal year. This contract was a sole-source acquisition pursuant to 10 U.S. Code 2304(c)(1). Strategic Systems Programs, Washington, D.C., is the contracting activity.

The Boeing Co., St. Louis, Missouri, is being awarded $19,680,950 for a firm-fixed-priced delivery order N00383-21-F-AY04 under previously awarded basic ordering agreement N00383-18-G-AY01 for the repair of various avionics equipment used on the F/A-18 aircraft and AV-8B aircraft. Work will be performed in Lemoore, California (99%); and Philadelphia, Pennsylvania (1%). Work will be begin February 2021, and will be completed by December 2023. Fiscal 2021 working capital funds (Navy) in the full amount of $19,680,950 will be obligated at the time of award and funds will not expire at the end of the current fiscal year. One source was solicited for this non-competitive requirement pursuant to the authority set forth in 10 U.S. Code 2304 (c)(1) and one offer was received. Naval Supply Systems Command, Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity.

East Coast Repair and Fabrication LLC, Portsmouth, Virginia, is awarded a $12,131,903 firm-fixed-price contract for a 50-calendar day shipyard availability. The work to be performed provides services for the mid-term availability of the fleet replenishment oiler USNS Kanawha (T-AO 196). The contract also contains five unexercised options, which if exercised, would increase cumulative contract value to $13,566,323. Work will be performed in Newport News, Virginia, and is expected to be completed by April 19, 2021. Fiscal 2021 working capital contract funds (Navy) in the amount of $12,131,903 are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the beta.SAM.gov website with four proposals received. The Military Sealift Command, Norfolk, Virginia, is the contracting activity (N32205-21-C-4008).

Lockheed Martin Space, Titusville, Florida, is awarded a $10,952,454 cost-plus-fixed-fee modification (P00006) to exercise options under previously awarded contract N00030-20-C-0100 for Trident II (D5) deployed systems support. Work will be performed in Denver, Colorado (40.1%); Bangor, Washington (17.9%); Kings Bay, Georgia (8.8%); Magna, Utah (8.2%); Oak Ridge, Tennessee (7.3%); Washington, D.C. (6.3%); Sunnyvale, California (5.6%); Cape Canaveral, Florida (3.5%); and other various locations (less than 1% each, 2.3% total). Work is expected to be completed Sept. 30, 2025. Fiscal 2021 weapons procurement (Navy) funds in the amount of $7,907,204; and fiscal 2021 operation and maintenance (Navy) funds in the amount of $1,500,000 are being obligated on this award, $1,500,000 of which will expire at the end of the current fiscal year. This contract is being awarded to the contractor on a sole-source basis under 10 U.S. Code 2304(c)(1) and was previously synopsized on the Federal Business Opportunities website. Strategic Systems Programs, Washington, D.C., is the contracting activity.

Martin-Baker Aircraft Co. Ltd., Uxbridge, United Kingdom, is awarded an $8,764,364 firm-fixed-price contract for the manufacture of 581 explosive cartridges kits and 1,116 each of different explosive cartridges used in the Martin-Baker US16E ejection seat in F-35 aircraft for the Joint Strike Fighter program. The contract does not contain a provision for an option quantity. All work will be performed in Uxbridge, United Kingdom, and work is expected to be completed by October 2022. The total value of $8,764,364 will be obligated at the time of award. Funding sources include fiscal 2021 operation and maintenance (O&M) (International Partner Funding) funds (31%); fiscal 2021 O&M (Air Force) funds (22%); fiscal 2021 procurement (Air Force) funds (18%); fiscal 2021 procurement (Marine Corps) funds (8%); fiscal 2021 procurement (Navy) funds (5%); fiscal 2021 O&M (Marine Corps) funds (5%); fiscal 2021 O&M (Navy) funds (3%); Foreign Military Sales (FMS) Japan funds (3%); FMS Israel funds (3%); FMS Belgium funds (1%); and FMS Korea funds (1%). Funds will not expire at the end of the current fiscal year. One source was solicited for this non-competitive requirement under authority 10 U.S. Code 2304 (c) (1), with one offer received. Naval Supply Systems Command, Weapon Systems Support, Mechanicsburg, Pennsylvania, is the contracting activity (N00104-21-C-K014).

DEFENSE LOGISTICS AGENCY

DRS Network & Imaging Services, Melbourne, Florida, has been awarded a maximum $55,678,715 firm-fixed-price, requirements base subsumable contract to repair and return Bradley weapon system parts. This is a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1 (a)(2). This is a nine-year contract with repricing occurring every three years. Location of performance is Florida, with a Jan. 28, 2030, performance completion date. Using military service is Army. Type of appropriation is fiscal year 2021 Army working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Redstone Arsenal, Alabama (SPRRA2-21-D-0014).

U.S. SPECIAL OPERATIONS COMMAND

Rockwell Collins Inc., Cedar Rapids, Iowa, received a ceiling increase modification in the amount of $12,797,070 to an indefinite-delivery/indefinite-quantity contract (H92241-17-D-0004) to provide life-cycle contractor support and hardware for the Common Avionics Architecture System, Cockpit Management System, Airborne Mission Network, Secure Real Time Video and Aircraft Management Systems. This modification raises the contract ceiling to $43,529,330. The majority of the work is being performed in Cedar Rapids, Iowa, and ordering periods will end in July 2022. This modification was a non-competitive award in accordance with Federal Acquisition Regulation 6.302-1. U.S. Special Operations Command, Tampa, Florida, is the contracting activity.

*Small business

https://www.defense.gov/Newsroom/Contracts/Contract/Article/2487798/source/GovDelivery/

Sur le même sujet

  • Eyeing China, Biden defense budget boosts research and cuts procurement

    31 mai 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Eyeing China, Biden defense budget boosts research and cuts procurement

    U.S. President Joe Biden’s first budget request for the Department of Defense slashes procurement by $8 billion, whacking scores of legacy weapons and systems as a way to deliver a $5.5 billion boost for the development and testing of cutting-edge technologies that could deter China.

  • America’s largest business lobby endorses Trump’s arms export plan

    23 juillet 2018 | International, Terrestre

    America’s largest business lobby endorses Trump’s arms export plan

    By: Joe Gould WASHINGTON — America's largest business lobby is hailing the Trump administration's plansto boost American weapons exports. “The U.S. Chamber of Commerce Defense and Aerospace Export Council (DAEC) welcomes the State Department's announcement regarding the approved implementation plan for the Conventional Arms Transfer (CAT) Policy," council President Keith Webster said in a statement Friday. The U.S. State Department this week announced its planned process to implement the Conventional Arms Transfer policy, which adds economic security as a factor when the government considers whether to approve arms exports. It intends for the executive branch to advocate strongly on behalf of companies exporting defense items. Webster, who was President Barack Obama's last director of international cooperation at the Pentagon, called the policy “a major first step toward improving government decision processes and policies.” Aerospace and defense firms rely on innovation and U.S. government support to compete on a global scale, he noted. The export council last month offered some 30 recommendations on how to hardwire economic security and defense-industrial base considerations into the government's international arms sale decisions. “We appreciate the administration's outreach throughout this process and are pleased to see DAEC priorities in the plan, including policy changes that will improve bid timeliness while reducing costs to industries, place emphasis on economic considerations in the federal transfer decision process, and expand trade promotion," Webster said. The policy has attracted pushback from arms control advocates who say it risks fueling conflicts around the world and aiding regimes that do not respect human rights. “If the administration is serious about claims that these changes make for responsible policy, it should add much greater transparency into the arms transfer and monitoring process,” Forum on the Arms Trade's founder and coordinator, Jeff Abramson, wrote last month. The U.S. leads the world in arms transfers, with $47 billion expected so far this year, whereas the State Department approved $42 billion in government-to-government sales for all of 2017. “Defense exports are good for our national security, they're good for our foreign policy. And they're good for our economic security. And as the administration and our leadership has said, economic security is national security,” Lt. Gen. Charles Hooper, head of the Defense Security Cooperation Agency, said during the Farnborough International Airshow on July 18. Aaron Mehta in London contributed to this report. https://www.defensenews.com/industry/2018/07/20/business-org-hails-trump-arms-export-plan/

  • COVID-19 Affects U.S. Army Aviation Upgrades

    14 avril 2020 | International, Aérospatial

    COVID-19 Affects U.S. Army Aviation Upgrades

    Lee Hudson The U.S. Army is aggressively upgrading its legacy AH-64 Apache, CH-47 Chinook and HH-60 Black Hawk fleets, but is encountering some delays in these efforts related to the spread of the novel coronavirus. These platforms will continue to be in the service's inventory for many years to come and the Army must continue making them relevant as the Pentagon pivots to Joint All-Domain Command and Control, Patrick Mason, program executive officer for aviation, told Aerospace DAILY. The majority of Mason's team is teleworking and monitoring COVID-19's effect on production, engineering work and supply chain flow. The Army acknowledges issues related to COVID-19 may not materialize until the summer or fall because the supply chain currently has sufficient inventory, he said. “Obviously, this is an incredibly unique and unprecedented time that we're dealing with right now,” Mason said. The Army intends to introduce the Gen III Day Side Assembly, formerly known as the Modernized Day Sensor-Assembly (MDS-A), into the Boeing AH-64E Apache Version 6 (V6) kit this fall. During operational testing users were impressed with the technology's clear picture for target acquisition and the ease of locating a designation site made possible through electro-optical/infrared fusion. “The good thing about the way we've architected this program is that the production line will be switched to V6, and then we'll also have the ability to upgrade any of the V4s into the V6 configuration,” Mason said. The service has not determined the number of aircraft that will be equipped with the new V6 kit off the production line or retrofitted. The V6 kit includes upgrades for a Gen III Day Side Assembly, fire control radar frequency interferometer, and an expanded manned-unmanned teaming capability. “It's just another example of the kinds of technology that we can insert into these legacy platforms,” Mason said. The service expects industry to integrate a multispectral targeting capability into Future Vertical Lift platforms, he added. The Army is also planning to outfit the Apache and General Atomics MQ-1C Gray Eagle with air-launched effects in the mid-2020s. Mason's unmanned aircraft system program office is conducting a technology assessment while Army Futures Command is leading demonstrations, he said. The service funded the effort by issuing an other transaction agreement through the Aviation and Missile Technology Consortium. It will run through year's end. Mason anticipates by 2021 the service will have a better idea of which technologies will compose the initial increment for air-launched effects. The next upgrades on tap for the Boeing CH-47 Chinook are additional software loads for the digital flight control system and the common avionics architecture system. These are slated for June, but because of COVID-19 the timetable may shift, Mason said. “We're trying to monitor and understand exactly what we're going to be able to do as we get into June,” he said. The Army does not want to speculate on when these upgrades will wrap up because this is based on unit availability and the requirement not to interfere with operations and training. The service is still plugging ahead with Block II flight testing in Mesa, Arizona, to support the special operations community. “We have some disruption obviously due to COVID and the pandemic,” Mason said. The limited user test is scheduled to begin in March 2021 at Fort Bliss in Texas, but it may be delayed if not enough progress is made in flight testing. The flight testing in Mesa is not paused, but the team is not generating a sufficient number of sorties because of travel restrictions imposed on government workers in response to COVID-19. The crews comprise both government and industry personnel. The Army is reaping substantial cost savings by upgrading UH-60Ls to the V model for about $12 million per unit instead of buying a new UH-60V for roughly $21 million in fiscal 2020 dollars. Mason's team partnered with the Corpus Christi Army Depot to convert the aircraft and is completing the initial tranche intended to field the first unit next year, he said. The Army intends to upgrade 760 L models to the V configuration. “It's a very unique and cost-effective way to increase the capability of the L models,” he said. Mason's team is unable to conduct user assessments, which is delaying full-rate production. The Army anticipates the effort will enter full-rate production in the fourth quarter of fiscal 2020. This is two quarters behind the previous schedule because the team is experiencing travel restriction delays related to COVID-19. https://aviationweek.com/defense-space/aircraft-propulsion/covid-19-affects-us-army-aviation-upgrades

Toutes les nouvelles