21 janvier 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

Contract Awards by US Department of Defense - January 18, 2019

NAVY

Bell Helicopter Textron Inc., Fort Worth, Texas, is awarded $439,563,841 for modification P00008 to a previously awarded fixed-price-incentive contract (N00019-17-C-0030). This modification exercises an option for the production and delivery of 25 Lot 16 AH-1Z aircraft and 25 stores control units. Work will be performed in Fort Worth, Texas (60 percent); and Amarillo, Texas (40 percent), and is expected to be completed in January 2022. Fiscal 2018 aircraft procurement (Navy) funds in the amount of $439,563,841 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Global PCCI, Irvine, California, a joint venture, is awarded a maximum value $250,000,000 cost-plus-award-fee, fixed-fee, indefinite-delivery/indefinite-quantity contract for the Emergency Ship Salvage Material (ESSM) system. The primary purpose of this contract is to manage the facilities with emergency response equipment stockpiles pre-positioned to support and augment the Navy fleet capability in the areas of salvage, diving, pollution response, and underwater ship husbandry maintained by the Supervisor of Salvage, SEA 00C. This contract includes five ordering periods, which if executed, would make the maximum value of this contract $250,000,000. Work will be performed worldwide, and is expected to be completed by January 2024 when all five ordering periods have been executed. Fiscal 2019 operations and maintenance (Navy) funding in the amount of $5,000 will be obligated at the time of award and will expire at the end of the fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with one offer received. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity (N00024-19-D-4323).

Raytheon Integrated Defense Systems, Tewksbury, Massachusetts, is awarded a $38,140,569 cost-plus-fixed fee, cost only contract for Dual Band Radar (DBR) Design Agent Technical Engineering support efforts. The work to be performed is for engineering services for DBR system upgrades or redesigns, engineering change proposals, product support, test equipment procurement, installation integration support, combat system integration testing, program management support, studies and analysis. This contract includes options which, if exercised, would bring the cumulative value of this contract to $98,839,761. Work will be performed in Tewksbury, Massachusetts (70 percent); Andover, Massachusetts (20 percent); Moorestown, New Jersey (5 percent); and Arvonia, Virginia (5 percent). Fiscal 2019 shipbuilding and conversion (Navy) in the amount of $1,737,000; and fiscal 2019 research, development, test, and evaluation funding in the amount of $800,000 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was procured using other than full and open competition under the statutory authority of 10 U.S. Code 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity (N00024-19-C-5509).

DEFENSE LOGISTICS AGENCY

Bell Boeing Joint Project Office, California, Maryland, has been awarded an estimated $143,863,184 firm-fixed-price requirements contract for performance based logistics and engineering support for the V-22 platform. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is an 11-month base contract with four one-year option periods. Locations of performance are Texas and Pennsylvania, with a Nov. 30, 2019, performance completion date. Using military services are Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2019 through 2020 various Air Force, SOCOM and Navy appropriated funding. The contracting activity is the Defense Logistics Agency Aviation, Philadelphia, Pennsylvania (SPE4AX-19-D-9410).

ARMY

AECOM Energy & Construction, Greenwood Village, Colorado, was awarded a $63,007,995 modification (P00003) to contract W912EK-19-C-0002 for Illinois River Basin, LaGrange Lock and Dam, major rehabilitation, demolition; temporary facilities, surveying, dewatering, protecting lock chamber, blasting, removing and replacing horizontal concrete. Work will be performed in Versailles, Illinois, with an estimated completion date of July 27, 2021. Fiscal 2019 operations and maintenance Army funds in the amount of $24,700,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Rock Island, Illinois, is the contracting activity.

Odyssey International Inc.,* Mesa, Arizona, was awarded a $14,000,000 firm-fixed-price contract for construction of a company operations facility. Bids were solicited via the internet with eight received. Work will be performed in Fort Gordon, Georgia, with an estimated completion date of May 22, 2020. Fiscal 2015 and 2017 military construction funds in the amount of $14,000,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Savannah, Georgia, is the contracting activity (W912HN-19-C-3000).

Oshkosh Defense LLC, Oshkosh, Wisconsin, was awarded an $8,048,749 modification (P00150) to contract W56HZV-15-C-0095 for test and field service support for the Joint Light Tactical Vehicle. Work will be performed in Oshkosh, Wisconsin, with an estimated completion date of Sept. 30, 2019. Fiscal 2019 other procurement, Army funds in the amount of $8,048,749 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity.

*Small Business

https://dod.defense.gov/News/Contracts/Contract-View/Article/1736461/source/GovDelivery/

Sur le même sujet

  • U.S Army awards L3Harris ENVG-B production order

    17 avril 2024 | International, Terrestre

    U.S Army awards L3Harris ENVG-B production order

    This is the first order for the ENVG-B’s Program of Record full-scale production IDIQ, which will total nearly $1 billion over 10 years.

  • US and UK navies prepare to sign agreement to merge future tech work

    22 octobre 2020 | International, Naval

    US and UK navies prepare to sign agreement to merge future tech work

    David B. Larter and Andrew Chuter WASHINGTON – The U.S. Navy and British Royal Navy are preparing to more closely align their futures in a whole host of warfare areas, the U.S. chief of naval operations announced Tuesday. The U.S. Navy's chief of naval operations and First Sea Lord Adm. Tony Radakin intend to “sign a future integrated warfighting statement of intent that sets a cooperative vision for interchangeablty,” CNO Adm. Mike Gilday announced at the virtual Atlantic Future Forum, being held on board the RN's new aircraft carrier Queen Elizabeth. “We will synchronize pioneering capabilities, strengthen operating concepts and focus our collective efforts to deliver combined sea power together. By organizing our cooperation on carrier strike, underwater superiority, navy and marine integration and doubling down on future war fighting like unmanned and artificial intelligence, we will remain on the leading edge of great power competition.” It is unclear what the specifics of the statement of intent will be, but the U.S. and Royal navies have been focusing heavily in recent years on aligning its capabilities to be useful to each other in combined maritime operations. The message from both navies is that this will continue into the future. Throughout the Royal Navy's effort to get the Queen Elizabeth ready for deployment, the U.S. Navy and Marine Corps have been working closely with the service, training British pilots on the F-35B and getting the ship certified to operate them. The Marine Corps' Fighter Attack Squadron 211 embarked on Queen Elizabeth earlier this month during the ship's group exercise ahead of a deployment next year. The Marines will also mix in with Royal Air Force F-35Bs during the QE's 2021 deployment. In remarks at the forum, Radkin echoed Gilday's remarks, saying the two forces needed to continue to work to align efforts. “Throughout our careers we have had a drive for interoperability with allies,” Radkin said. "But increasingly it feels to us that bar has to be raised. ... The obvious example is the U.S. Marine jets on board the QE carrier. That is an obvious example of interchangeability. “So, we are trying to drive a new standard. Partly to drive all of us to strengthen our interoperability but to go even higher and recognize that interchangeability is going to be an even stronger feature in the future.” Radkin said the services would focus on four areas to grow this “interchangeability”: undersea warfare; carrier operations; aligning the efforts of the U.S. Marine Corps and Navy to become a cohesive fighting unit; and on advanced warfighting programs such as artificial intelligence and cyber. The United Kingdom is in the middle of an integrated defense review, initiated after Boris Johnson was elected prime minster. It was interrupted during the onset of the COVID-19 outbreak but appears to be running again. The review could have sweeping impacts on the British defense budget, but it is unclear where the budget ax will fall. When the review was announced, however, the government promised a “radical reassessment” of Britain's place in the world. https://www.defensenews.com/naval/2020/10/20/the-us-and-uk-navies-prepare-to-sign-agreement-to-merge-their-tech-futures/

  • Year in review: Top stories from 2023

    24 décembre 2023 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Year in review: Top stories from 2023

    Russia sends a symbolic message to Turkey, Britain orders new rifles, Hungary clashes with a U.S. senator over weaponry and more!

Toutes les nouvelles