10 juin 2022 | International, Terrestre

Construction de Défense Canada organise l'édition 2022 de l'Assemblée publique annuelle

Le 7 juillet 2022, Construction de Défense Canada (CDC) tiendra son Assemblée publique annuelle 2022 sous la forme d'une webémission préenregistrée. L'Assemblée publique annuelle donnera aux intervenants l'occasion d'en apprendre davantage sur le...

https://www.lelezard.com/communique-20422909.html

Sur le même sujet

  • Refining the Defense Department’s cyberwarrior ‘carrier’

    10 septembre 2018 | International, C4ISR

    Refining the Defense Department’s cyberwarrior ‘carrier’

    By: Mark Pomerleau The Department of Defense cyber community knows it has a critical need for a centralized platform for cyberwarriors, so the joint community is collaborating to ensure the final system has everything everyone needs. The Unified Platform, as it's known, will serve as the aircraft carrier, airplane or tank, so to speak, from which cyberwarriors plan and launch attacks. “We're working with Cyber Command to make sure we've got the requirement right for Unified Platform,” Lt. Gen. Stephen Fogarty, commander of Army Cyber Command, said during a keynote presentation at TechNet Augusta in August. He said there was a meeting in August to define what the Unified Platform is and what it is not as to develop it appropriately. “Where I think we've got to ensure is we don't make this so large that it just becomes unsustainable ... this very bloated program,” he told Fifth Domain in an interview during the same conference. There was some initial confusion with the Unified Platform, as it was conflated with the Military Cyber Operations Platform, Fogarty said. MCOP has been described in the past as the sum total of portfolios and capabilities Cyber Command's Capabilities Development Group manages with MCOP being CDG's top project. Others have described MCOP as an environment that will include the Unified Platform along with other services like analytics. In the most recent budget request, DoD asked for $52.4 million in fiscal 2019 under “Joint Common Services,” to include continued development of MCOP. Fogarty noted that while MCOP was the umbrella and the Unified Platform was one component underneath, sometimes the totality of MCOP was miscast as the Unified Platform, despite the Unified Platform being a more discrete piece of that. Fogarty added that there is a good understanding of what the essential elements of the Unified Platform are outside of what the services have been directed to do, noting there have been some good sessions with U.S. Cyber Command recently, who is the principal requirement owner. While the Air Force is serving as the executive agent for the program, Cyber Command's acquisition executive, speaking Sept. 6 at the Billington Cybersecurity Summit in Washington, said the full transition of the program to the Air Force won't occur until fiscal 2019. The official, Stephen Schanberger, said that while Cyber Command as the requirements owner for the program has a lot of influence to drive the first few deliverables and how they are implemented, each service cyber component will have their say in the program. Full article: https://www.fifthdomain.com/dod/cybercom/2018/09/07/refining-the-defense-departments-cyberwarrior-carrier/

  • Merging worlds: Army releases unified network plan to ensure global connectivity

    12 octobre 2021 | International, C4ISR

    Merging worlds: Army releases unified network plan to ensure global connectivity

    The global nature of conflicts '€” physical and digital alike '€” against nation states will require forces to have ready and resilient access to data from anywhere.

  • Maiden flight of first EMD Red Hawk jet slated for September 2021

    19 août 2020 | International, Aérospatial

    Maiden flight of first EMD Red Hawk jet slated for September 2021

    by Gareth Jennings The US Air Force (USAF) has slated September 2021 for the maiden flight of the first of five engineering and manufacturing development (EMD) Boeing-Saab T-7A Red Hawk advanced jet trainer aircraft, Janes has learned. With production of the EMD aircraft set to shortly begin at Boeing's St Louis facility in Missouri and Saab's Linköping facility in Sweden, a USAF official told Janes on 18 August that the hitherto undisclosed date for the first EMD flight has now been set. “Saab has released all EMD aircraft ‘build-to-packages' to support build and manufacturing preparation. The EMD [aft] fuselages (five in total) are currently planned for build at Saab's factory in Sweden with delivery [to St Louis] no later than April 2021. Production is expected to begin with jig load [this] August at Boeing in St Louis. Boeing currently plans for assembly to be complete in June 2021, with the first EMD flight expected in September 2021,” the USAF said. Prior to this disclosure, both Boeing and Saab had declined to comment on the timetable for the first EMD flight, noting only that “this is very sensitive information for the USAF”. With two production-representative jets (PRJs) currently flying, the present EMD phase of the contract covers the five further aircraft and seven simulators. https://www.janes.com/defence-news/news-detail/maiden-flight-of-first-emd-red-hawk-jet-slated-for-september-2021

Toutes les nouvelles