18 décembre 2018 | International, Aérospatial

China is driving use of armed drones in Mideast, says British think tank

By:

BEIRUT — The use of armed drones in the Middle East, driven largely by sales from China, has grown significantly in the past few years with an increasing number of countries and other parties using them in regional conflicts to lethal effects, a new report said Monday.

The report by the Royal United Services Institute, or RUSI, found that more and more Mideast countries have acquired armed drones, either by importing them, such as Jordan, Iraq, Saudi Arabia and the United Arab Emirates, or by building them domestically like Israel, Iran and Turkey.

China has won sales in the Middle East and elsewhere by offering UAVs at lower prices and without the political conditions attached by the United States.

The Associated Press reported earlier this year that countries across the Middle East locked out of purchasing American-made drones are being wooed by Chinese arms dealers, helping expand Chinese influence across a region vital to American security interest.

It noted the use of Chinese armed drones across Mideast battlefields, including in the war on Yemen, employed by the Emirati Air Force. Iran has also violated Israeli airspace with armed UAVs from bases in Syria, provoking armed Israeli response on the suspected bases.

The RUSI report, titled “Armed Drones in the Middle East: Proliferation and Norms in the Region,” said that by capitalizing on the gap in the market over the past few years, Beijing has supplied armed drones to several countries that are not authorized to purchase them from the U.S., and at a dramatically cheaper price.

"China, a no-questions-asked exporter of drones, has played and is likely to continue playing a key role as a supplier of armed UAVs to the Middle East," it said.

The report explored where and how each of the states have used their armed drones and whether they have changed the way these countries approach air power. It found that Iran, the UAE and Turkey all changed the way they employ air power after they acquired armed drones.

For Turkey and the UAE, armed drones enabled them to conduct strikes in situations where they would not have risked using conventional aircraft, it said. Iran developed armed drones from the outset specifically to project power beyond the reach of its air force, which is hamstrung by obsolete aircraft and sanctions, the report added.

The report said it remains to be seen whether and how the loosening of restrictions on the export of armed drones by the Trump administration will alter dynamics in the region. The administration in April permitted U.S. manufacturers to directly market and sell drones, including armed versions, although the government must still approve and license the sales.

Aniseh Bassiri Tabrizi, who authored the report along with Justin Bronk, said proliferation of armed drones in the Middle East is unlikely to stop and could accelerate despite changes introduced by the U.S. administration.

“Over the past two years the sales have increased massively and they are likely to increase even more,” she said. “This kind of collaboration is just going to grow especially in cases where countries don't have the capacity to build them themselves.”

https://www.defensenews.com/unmanned/2018/12/17/china-is-driving-use-of-armed-drones-in-mideast-says-british-think-tank

Sur le même sujet

  • Safran souhaite se renforcer dans la défense

    2 novembre 2020 | International, Aérospatial

    Safran souhaite se renforcer dans la défense

    La crise du Covid-19 a montré la grande dépendance de Safran à l'aéronautique civile alors que l'activité hélicoptère et la défense sont en croissance. À cet égard, le groupe souhaite se renforcer dans le secteur militaire. « J'aimerais que le groupe se développe dans la défense. Si des actifs sont à vendre, je regarderai avec intérêt », a déclaré Philippe Petitcolin, son directeur général. Les activités militaires représentent 16% environ du chiffre d'affaires du groupe. Il est présent dans les drones avec le Patroller commandé par l'armée de Terre, les boules optroniques, les centrales inertielles, ainsi que les moteurs de l'avion de combat Rafale, de l'Airbus A400M et de plusieurs hélicoptères, notamment le nouveau H160 M qui doit équiper les forces armées dans les prochaines années. Safran bénéficiera aussi du futur contrat Rafale grec. Athènes négocie avec la France pour acheter 18 avions de combat. « Si de nouveaux contrats Rafale sont pris à l'exportation et en France, ils auront un impact positif en 2022 et 2023 », a précisé le directeur général. Le Figaro 30 octobre 2020

  • US Air Force awards $9B contract to Boeing-Saab for next training jet

    28 septembre 2018 | International, Aérospatial

    US Air Force awards $9B contract to Boeing-Saab for next training jet

    By: Valerie Insinna WASHINGTON — A Boeing-Saab partnership has won a $9.2 billion contract to produce the U.S. Air Force's next-generation training jet. Boeing's award for the T-X trainer program marks the third major victory by the company in about a month, following an $805 million contract to build the Navy's first four MQ-25 unmanned tankers, and a contract worth up to $2.38 billion to manufacture the Air Force's Huey replacement helicopter. The T-X downselect was first reported by Reuters. As the winners of the competition, Boeing and Swedish aerospace firm Saab are set to capture sales of at least 351 training jets to the U.S. Air Force, with possibly more in the international market. The program promises to keep Boeing's tactical aircraft business strong after the F-15 and F/A-18 Super Hornet lines disappear in the next decade. "Today's announcement is the culmination of years of unwavering focus by the Boeing and Saab team,” said Leanne Caret, president and CEO of Boeing's defense business. “It is a direct result of our joint investment in developing a system centered on the unique requirements of the U.S. Air Force. We expect T-X to be a franchise program for much of this century.” The indefinite-delivery/indefinite-quantity contract will allow the Air Force to buy up to 475 aircraft and 120 simulators, the Air Force said in a Sept. 27 statement, although the current plan is to buy 351 T-X aircraft, 46 simulators and associated ground equipment. The Air Force stated that the T-X program originally was to cost about $19.7 billion, and that Boeing's bid shaved $10 billion off that amount. “This new aircraft will provide the advanced training capabilities we need to increase the lethality and effectiveness of future Air Force pilots,” Air Force Secretary Heather Wilson said in the news release. “Through competition we will save at least $10 billion on the T-X program.” Although the contract could be worth up to $9.2 billion, that sum is by no means a sure thing for Boeing. During a briefing with reporters on Thursday afternoon, Will Roper, the service's acquisition executive, and Lt. Gen. Arnold Bunch, its top uniformed acquisition official, said the $9.2 billion amount would be obligated to Boeing if the service executes all of options that would allow it to buy more aircraft at a quicker pace, purchasing all 475 planes. Additionally, Boeing assumes the preponderance of the risk with the T-X program, which starts as a fixed-price incentive fee contract, but at the fifth lot will transition to a firm-fixed price structure, Roper and Bunch said. Boeing and Saab's clean-sheet trainer, designed specifically for the Air Force, beat out Leonardo DRS and a Lockheed Martin-Korea Aerospace Industries partnership. Throughout the competition, the Boeing-Saab jet was seen as the front-runner by analysts like Roman Schweizer of Cowen Washington Research Group, who pointed to Boeing's aggressive bidding strategy and ability to absorb financial losses on programs like the KC-46 tanker aircraft. The T-X program is the Air Force's last major aircraft procurement opportunity up for grabs for some time, as the service's contracts for its next-generation fighter, tanker and bomber have already been awarded, as have the last remaining new-start helicopter contracts. As such, the decision could potentially trigger a protest with the Government Accountability Office. But Roper and Bunch pointed to the repeated interaction with industry through the competition, which could shield it from a protest, and lessons learned from previous programs on how to structure a competition. Roper also defended the service's selection of Boeing's design, which was the only proposed aircraft that was not a modified version of an existing plane. “We have a very deliberate process to evaluate risk, cost, and technical factors in the program and so its rigorous because we do have to evaluate things that have variances in them. The team looked at that, rolled up cost benefit, technical factors sand risk, to give best value to the government and overall our assessment was Boeing had a proposal that was best value,” Roper said. Under the initial $813 million award, Boeing will be responsible for delivering five T-X aircraft and seven simulators, with the first simulators arriving at Joint Base San Antonio-Randolph, Texas, in 2023. According to the T-X request for proposals issued in December 2016, the Air Force will then execute contract options for two batches of low-rate production and eight rounds of full-rate production. The contract also includes ground training systems, mission planning and processing systems, support equipment, and spares. Initial operating capability is planned by the end of fiscal 2024 when the first squadron and its associated simulators are all available for training. Full operational capability is projected for 2034. Beyond the 351-aircraft program of record, analysts have speculated there could be significant international interest in T-X from countries that plan to fly the F-35 fighter jet or from the U.S. Air Force as it considers buying new aggressor aircraft for air-to-air combat training, making the opportunity potentially even more lucrative. Although each of the three competing teams offered very different trainers to the Air Force, they were united by their cooperation with international aircraft manufacturers. Boeing partnered with Saab, which is building the aircraft's aft fuselage and other systems. The team produced two single-engine, twin-tailed prototypes, which were unveiled at Boeing's St. Louis, Missouri, facility to much fanfare in 2016. Saab promised that, should the partnership emerge victorious, it would build a new plant in the United States for its T-X work, although a location has not been announced. Leonardo DRS and Lockheed Martin offered modified versions of existent designs, hoping that a mature aircraft would be more palatable as the U.S. Air Force continues to foresee budgetary challenges in its future. DRS' T-100 is based on the Leonardo M-346 trainer, which is being sold to two F-35 users — Italy and Israel — as well as Singapore. Leonardo initially looked to partner with a big-name U.S. defense prime, first joining with General Dynamics and then, when that teaming agreement fell apart, Raytheon. Ultimately, Leonardo and Raytheon couldn't agree on pricing for the T-100, leading that partnership to also break up in January 2017. After Leonardo DRS was tapped to prime the program, the company announced its intention to do structural subassembly, final assembly and check out of the aircraft stateside at Moton Field in Tuskegee, Alabama, where it would build a new $200 million facility. Lockheed Martin meanwhile joined with Korea Aerospace Industries — a longtime collaborator who manufactured South Korea's version of the F-16 — for a modified version of KAI's T-50. Lockheed said that its T-50A would be built in Greenville, South Carolina, where it also plans to fabricate the F-16 in the future. https://www.defensenews.com/breaking-news/2018/09/27/reuters-air-force-awards-9b-contract-to-boeing-for-next-training-jet/

  • US Navy prepares major surge of littoral combat ship deployments

    3 août 2020 | International, Naval

    US Navy prepares major surge of littoral combat ship deployments

    By: David B. Larter WASHINGTON — The U.S. Navy is taking major steps in an attempt to shake off years of false starts and setbacks with the Littoral Combat Ship program, an effort Chief of Naval Operations Adm. Michael Gilday said he'd oversee on his watch. In an exclusive interview with Defense News on July 16, Gilday listed LCS as a major priority, saying he will turn up the heat on efforts to get the ship to become a major contributor to fleet operations. “There are things in the near term that I have to deliver, that I'm putting heat on now, and one of them is LCS,” Gilday said. “One part is sustainability and reliability. We know enough about that platform and the problems that we have that plague us with regard to reliability and sustainability, and I need them resolved.” “That requires a campaign plan to get after it and have it reviewed by me frequently enough so that I can be sighted on it. Those platforms have been around since 2008 — we need to get on with it. We've done five deployments since I've been on the job, we're going to ramp that up two-and-a-half times over the next couple of years, but we have got to get after it,” he added. “LCS for me is something, on my watch, I've got to get right.” Gilday's renewed focus on LCS comes after years of fits and starts as the Navy struggled with almost every aspect of the complicated program: from manning and maintaining the hulls, to keeping the gear running or even fielding the sensor suites needed to perform the missions for which they were built. The ship has become a perennial whipping boy for a Congress frustrated by the service's struggle to field new technologies, such as those built into the LCS or the Ford-class aircraft carrier, conceived in the early 2000s. Two of the technologies the Navy has yet to field are the mine-hunting mission module, intended to replace the service's aging minesweepers, and the anti-submarine warfare mission module. Both are years overdue, though they have made significant progress. Getting those fielded is among Gilday's top priorities. “I have to deliver ... both the mine and ASW modules,” Gilday said. “These ships are probably going to [start going] away in the mid-2030s if the [future frigate] FFG(X) build goes as planned. But I need to wring as much as I can out of those ships as quickly as I can.” The LCS program comprises two hulls: a monohull version built in Marinette, Wisconsin, by Lockheed Martin and Fincantieri; and a trimaran version built by Austal USA in Mobile, Alabama. Congress funded 35 of the ships and has commissioned 20 of them, but deploying the ship has been a challenge because of reliability problems with the complicated propulsion systems designed to meet the Navy's 40-knot speed requirement. In 2016, the Navy fundamentally reorganized the program, jettisoning the signature modularity of the program where a single LCS would have a small, permanent crew and switch out anti-surface, anti-submarine or mine-warfare mission packages on the pier depending on the mission. Each mission package would then come with a group of specialists to operate the equipment. After a series of accidents, the Navy sought to simplify the concept; semi-permanently assign mission packages to each hull; and change a complicated three-crews-for-two-LCS-hulls model to a blue-and-gold crewing model used in ballistic missile submarines as a way of boosting operational tempo. The reorg was in response to concerns that the rotational crewing model reduced crew ownership of the vessel, potentially contributing to some of the accidents that plagued the program. One of the major accidents wrecked the then-forward-deployed Fort Worth's combining gear (roughly the same as the clutch on a car) when the crew started up the system without lube oil running. Prior to the Fort Worth accident, the combining gear onboard the Milwaukee encountered problems on the ship's transit from the shipyard to its home base in Florida and had to be towed into Norfolk, Virginia. Mission packages Gilday's goal of fielding the mission modules is well along already, according to two sources familiar with the progress, who spoke to Defense News on condition of anonymity. The mine-warfare mission module is on track for a final test and evaluation by the end of this year, a source with knowledge of the program told Defense News, and the individual components have already passed testing and are in initial low-rate production. End-to-end testing of the mine-warfare mission module is set to begin in fiscal 2021 and is on track to have its initial operating capability declared in 2022, another source said. The status of the ASW mission module, which has been a regular target of Congress-imposed budget cuts, is a little less clear. The next major milestones for the ASW mission package will likely slip to next year due to budget cuts, a source with knowledge of the program said. The mission module has been integrated into the LCS Fort Worth and testing began last fall. It's unclear if the testing will be delayed or interrupted if the Navy is able to carry through its plan to decommission the first four littoral combat ships. For the Independence variant — the trimaran hull — testing for the ASW mission module is slated to be installed on the LCS Kansas City, but there is no fixed date yet, according to a Navy official. Missions Aside from the issues with a buggy propulsion train and the delayed mission modules, Gilday said he was happy with where LCS is with regard to manning, and said the blue-gold crewing was giving him a lot of availability to play with. “I do think we have it about right with manning,” Gilday said. “We were honest with ourselves that the original design wasn't going to do it. I really like the blue-and-gold construct because I get way more [operational availability] than I would with just the single crew. “So I can get these ships out there in numbers doing the low-end stuff in, let's say, 4th Fleet where I wouldn't need a DDG.” The Navy deployed the LCS Detroit to South America — the 4th Fleet area of operations — last year on a counternarcotics mission, and it returned earlier this month. Those are the kinds of missions for which the LCS is perfectly suited, Gilday said. “I can deploy these things with a [law enforcement detachment] and a signals intelligence capability, and I can do that on LCS with carry-on gear,” Gilday said. “It's the right kind of platform for that. Also in 5th Fleet, those maritime security missions that we were heavily sighted on in the late 1990s and early 2000s: They still exist, I'd just prefer to do them with an LCS instead of a DDG if I can.” But without getting more reliability out of the propulsion system, even the low-end missions the Navy wants of the LCS will be a challenge. The heart of the issue seems to lie with long ocean transits, such as the one from San Diego, California, to Singapore, where the ships are supposed to be forward based. Cutting back on that transit, and the wear it puts on the ship, should be core to the Navy's strategy to getting more from LCS, said Bryan Clark, a retired submarine officer and senior fellow at the Hudson Institute. “The propulsion architecture's unreliability means you are going to have to come up with a different way to deploy the ship that doesn't require every deployment to be transoceanic,” Clark said. “By the time the ship gets to Singapore, it needs a lot of work done to it and your deployment time is cut down by the fact that you have to repair the ship once it arrives. Then it has to return to the U.S. So both those trips are so fraught that the Navy ends up devoting a lot of time and resources to it.” One alternative would be to forward-station the ships for a longer period of time than the 16-24 months the Navy envisioned, and place them in Sasebo, Japan, rather than Singapore, Clark said. Sasebo has always been in the cards for LCS as a home for the mine-warfare LCS hulls. When it comes to the delays on the mission modules, Clark said, the Navy should consider fielding those capabilities in the mine-warfare mission module that are already workable, or consider an alternate structure based on the model used by the Explosive Ordnance Disposal technicians. “The other thing they need to do is come up with a way for the mine-warfare capabilities to the degree they are available. And come up with the concept of operations for that, meaning the warfare folks in San Diego would need to come up with concepts for the equipment they do have rather than what they want to have,” he said. As for the ASW mission module, that might be something the Navy will want to revisit, he added. “They need to decide if the ASW mission package is going to be part of LCS,” Clark explained. “The ASW module is the module with the most proven capability in it and is the one that would offer the best improvement in LCS contribution to the fleet. “But it's also the most expensive. And if LCS is not deploying, then why spend the money on it? And with the frigate coming along, it's going to be doing the same missions with the same kind of systems, so why invest in the LCS version?” What is clear is that leadership from the upper echelons of the Navy should help move things along, Clark said. “It's good to hear Gilday is taking it on,” he noted. “But I think part of that is going to be accepting that we're never going to get where we wanted to be on LCS, and accepting second best is probably the best way to get the most from LCS. “You'll have to say: ‘We accept the fact that we're not going to have a full mine-warfare mission module. We accept that we'll have to deploy them forward and eliminate these long transits and ASW is probably out the window.' So it is about making hard choices like that and taking the heat.” https://www.defensenews.com/naval/2020/07/31/the-us-navy-is-preparing-a-major-surge-of-lcs-deployments/

Toutes les nouvelles