3 novembre 2022 | International, Aérospatial

Bell Completes U.S. Marine Corps AH-1Z Program of Record

The current generation AH-1Z Viper and UH-1Y Venom are the most agile, mobile, and survivable combination of aircraft used by the Department of Defense

https://www.epicos.com/article/746067/bell-completes-us-marine-corps-ah-1z-program-record

Sur le même sujet

  • Faulty $5 Parts Cause 18-Month, $1 Billion Delay to Navy, Air Force Nuclear Upgrades

    26 septembre 2019 | International, Aérospatial, Naval, Terrestre

    Faulty $5 Parts Cause 18-Month, $1 Billion Delay to Navy, Air Force Nuclear Upgrades

    Defects found in a $5 electrical component will delay the Navy and Air Force nuclear warhead refurbishment program by 18 months and cost more than $1 billion to fix, a National Nuclear Security Administration official said during a congressional hearing Wednesday. The faulty components are small commercially available capacitors that were to be used in upgrades to the Navy's W88 nuclear warheads. These weapons are deployed on the Trident II D5 submarine-launched ballistic missile systems. Similar capacitors are needed to upgrade the Air Force's B61-12 gravity bomb, Charles Verdon, deputy administrator for defense programs at the National Nuclear Security Administration, told members of the House Armed Services subcommittee on strategic forces during the unclassified portion of Wednesday's hearing. When engineers evaluated available parts, they ran tests to determine if the off-the-shelf capacitors were compatible with the systems due for upgrades, Verdon said. Initial results suggested the components would work in the short-term. “Early tests on the capacitors now in question and subsequent tests including component, major assembly and full-up integrated system flight tests demonstrated that these components meet requirement today. Industry best practices were used to stress the components beyond their design planned usage as a way to establish confidence that they will continue to work over the necessary lifetime of the warhead,” Verdon said. “During stress testing, a few of these commercially available capacitors did not meet the reliability requirements.” The problem is, these parts used in the warhead upgrades must survive for decades, up to 30 years after production, Verdon said. However, the quality of each capacitor production lot varied, which led to the stress testing failure. Instead of using the capacitors and risking readiness in the future, Verdon said his agency decided to delay the upgrade work, initially scheduled to begin in December. Replacement capacitors are being produced but will cost about $75 per unit, compared with the $5 per unit cost of the off-the-shelf capacitors that failed stress testing. “The use of commercial-off-the-shelf electric components needs to be improved to reduce future COTS-related risk,” Verdon said. The Navy is working with U.S. Strategic Command to understand how the 18-month delay will affect near-term deployments, Vice Adm. Johnny Wolfe, the director of strategic systems programs for the Navy, told the panel. “Currently, today, based on what we're doing with STRATCOM, we will meet the requirements as we move forward,” Wolfe said. The Navy and STRATCOM are developing a mitigation plan which includes is reevaluating how to turn around the submarine-based nuclear missile stockpile and how to schedule warheads for upgrades in the future, Wolfe said. More details on the Navy's plan to be discussed in a classified hearing. “If you look at the age of these systems and the technology we're using, these are tough, tough issues to solve, and it's critical technology that we're learning as we modernize these,” Wolfe said. Rep. Jim Cooper (D-Tenn.), chair of the strategic forces subcommittee, said he held the hearing because he wanted more information on what NNSA was doing to avoid more delays. He called the recapitalization “both necessary and hugely expensive” in his written opening statement. “Maintaining Congress and the public's confidence in these programs, and their effective execution, is imperative,” he wrote. https://news.usni.org/2019/09/25/faulty-5-parts-cause-18-month-1-billion-delay-to-navy-air-force-nuclear-upgrades

  • US Air Force requests $156.3 billion in FY19, plans to retire B-1, B-2 fleets

    12 février 2018 | International, Aérospatial, C4ISR

    US Air Force requests $156.3 billion in FY19, plans to retire B-1, B-2 fleets

    By: Aaron Mehta ROME — The fiscal 2019 budget for the U.S. Air Force plans to grow the service from 55 to 58 combat squadrons over the next five years, while buying dozens of high-end aircraft and preparing to retire the B-1 and B-2 bomber fleets as the military retools for the high-end competition forseen by the Pentagon. The National Defense Strategy, released in January, focused on the potential for great power competition between the U.S. and Russia or China. And in any such battle, the U.S. Air Force would play a critical role; hence, the service's request for $156.3 billion for FY19, a 6.6 percent overall increase from the FY18 request. Click here for full coverage of President Trump's FY19 budget request! In FY19, the Air Force is requesting 48 F-35A fighter jets, 15 KC-46A tankers and one more MC-130J aircraft. Ther service is also investing $2.3 billion in research and development in the B-21 Raider bomber, up from the $2 billion request in the yet-to-be-enacted FY18 budget. The latter is notable, as the Air Force has formally announced it will be retiring the B-1 and B-2 bomber fleets once the B-21 — which will be dual-capable for both conventional and nuclear missions — starts to come online in the mid-2020s. The budget request also calls for investing in new engines for the B-52 fleet to keep that aircraft going through 2050 — making it an almost 100-year-old design. “If the force structure we have proposed is supported by the Congress, bases that have bombers now will have bombers in the future,” Air Force Secretary Heather Wilson said in a service release. “They will be B-52s and B-21s.” The budget request also seeks to move forward with a new light-attack aircraft, likely either the Embraer-Sierra Nevada Corp. A-29 Super Tucano or the Textron AT-6, to provide a low-end capability. Although that program seems at odds with the high-end challenge foreseen by the Defense Department, Susanna Blume of the Center for a New American Security believes it fits in nicely, as such an aircraft would remove the need to fly expensive, high-end aircraft for that mission. Overall, the budget request calls for buying 258 F-35A fighters through the next five years. And in terms of space, the service is requesting $2 billion to fund five launches of the Evolved Expendable Launch Vehicle. The service also seeks to increase funding for F-16 modernizations to speed upgrades with the active electronically scanned array antennas, radar warning systems and Link 16 systems. Naval warfare reporter David B. Larter contributed to this report from Washington. https://www.defensenews.com/smr/federal-budget/2018/02/12/air-force-requests-1563-billion-in-fy19-plans-to-retire-b-1-b-2-fleets/

  • NGC to Develop C5ISR and Control Systems for USCG Offshore Patrol Cutters - Seapower

    11 juin 2021 | International, Naval

    NGC to Develop C5ISR and Control Systems for USCG Offshore Patrol Cutters - Seapower

    CHARLOTTESVILLE, Va. — Northrop Grumman Corp. has been awarded a newly expanded role as systems integrator for C5ISR and control systems on the U.S. Coast Guard Offshore Patrol Cutter (OPC), by Eastern Shipbuilding Group (ESG), the prime contractor for the...

Toutes les nouvelles