9 mai 2024 | International, Terrestre

AVs Switchblade 600 selected for Tranche 1 of the U.S Department of Defenses replicator initiative

The first iteration of the Replicator initiative aims to accelerate all-domain, attritable autonomous systems to warfighters at speed and scale.

https://www.epicos.com/article/798850/avs-switchblade-600-selected-tranche-1-us-department-defenses-replicator-initiative

Sur le même sujet

  • The Army’s SAW and M4 replacement is headed to troops by 2022

    15 octobre 2020 | International, Terrestre, Sécurité

    The Army’s SAW and M4 replacement is headed to troops by 2022

    Todd South The gun that will replace both the M249 Squad Automatic Weapon and the M16/M4 rifle/carbine weapons — and add a new, widely distributed caliber to the U.S. military inventory for the first time in decades — is less than two years away. The Next Generation Squad Weapon finished its first prototype test event in September. The three previously selected offerings came from Sig Sauer, Textron Systems and General Dynamics Ordnance. Brig. Gen. David Hodne, Infantry School commandant and Soldier Lethality Cross Functional Team director, along with Brig. Gen. Anthony Potts, head of Program Executive Office Soldier, gave updates to Army Times ahead of the Association of the U.S. Army Annual Meeting and Exposition. Concurrently, the Army in April has also selected two companies, L3 Technologies and Vortex Optics, to compete for the fire control for the weapons system. Sig Sauer's design looks much like a conventional assault rifle while GD is using a bullpup design, which shortens the length by building the magazine feed into the weapon stock. Textron has built its weapon around the cartridge, which is unique to them, a cased telescope item that has the projectile inside of the casing to reduce weight. Back in April, each of the companies provided 15 rifles, 15 automatic rifles and 180,000 cartridges using the government-developed 6.8mm projectile. The 6.8mm projectile was chosen after decades of testing and evaluation showed that 5.56mm lethality at mid-ranges on the battlefield was inadequate and existing 7.62mm could be outperformed by the 6.8mm round and save weight for the soldier. The new caliber also gives the soldier both a rifle and automatic rifle firing the same round, both effective past the 600m mark of existing light calibers. Following the September testing, the companies will have six months until their next prototype test, scheduled to begin in February. During the annual Maneuver Warfighter Conference at Fort Benning in Georgia, Maj. Wyatt Ottmar, project officer over NGSW for the Soldier Lethality CFT, laid out some of the recent developments and next steps for the weapons system. Ottmar noted that Sig Sauer provided a combined steel lower and brass upper ammunition cartridge to reduce weight. A contract is expected to be awarded to one of the three companies this coming fiscal year with fielding to start in the fourth quarter of fiscal year 2022, or sometime between August and October 2022, to Infantry, Stryker and Armor Brigade Combat Teams. Ultimately, the weapon will be fielded to all close combat forces, including special operations forces, infantry, combat engineers and scouts. The fire control is expected to field six months ahead of the weapon, Potts said. That will allow the NGSW producer to better integrate the optic with the weapon. https://www.defensenews.com/news/your-army/2020/10/14/the-armys-saw-and-m4-replacement-is-headed-to-troops-by-2022/

  • Pentagon Extends JEDI Deadline Again—With a Catch

    26 septembre 2018 | International, C4ISR

    Pentagon Extends JEDI Deadline Again—With a Catch

    By Heather Kuldell, Managing Editor The department is requiring bidders to deliver their proposals in person. Companies bidding on the Defense Department's multibillion-dollar Joint Enterprise Defense Infrastructure cloud contract will need to hand-deliver their proposals. “In lieu of electronic submission, an offeror's entire proposal shall be captured on one or more DVDs and submitted in person only. No other forms of submission will be accepted,” the department said in an amendment to the JEDI request for proposal posted Monday. The department also pushed the deadline back a few days. Bidders must contact JEDI procurement officials by 5 p.m. Eastern time Oct. 10 to get logistical details for turning in their proposals in person on Oct. 12. It's the second time the department extended JEDI's original Sept. 17 deadline, following other amendments that answered industry questions and a pre-award bid protest from Oracle. Defense officials describe the JEDI acquisition as the foundation for hosting mission-critical data for warfighters around the world. But since it was announced a year ago, the procurement has drawn scrutiny from industry and lawmakers for requiring a single cloud service provider instead of multiple vendors. The contract could be worth up to $10 billion over 10 years if all the follow-on options are exercised. But before the project sees a cent, Congress wants more insight into JEDI and the rest of the department's cloud computing projects. In the final conference report for the Defense-related minibus, appropriators order the defense secretary to deliver a cloud-centric budget accounting plan and a detailed, enterprisewide cloud computing strategy that includes “defining opportunities for multiple cloud service providers.” The department would be prohibited from spending anything on JEDI or the Defense Enterprise Office Solutions—another multibillion-dollar cloud contract—until 90 days after those plans are delivered to defense committees. “The conferees believe cloud computing, if implemented properly, will have far-reaching benefits for improving the efficiency of day-to-day operations of the Department of Defense, as well as enabling new military capabilities critical to maintaining a tactical advantage over adversaries,” lawmakers wrote in the joint explanatory statement. The Senate passed the minibus—which also includes labor, health, education and a continuing resolution—last week. The House is scheduled to vote on the package this week. https://www.nextgov.com/it-modernization/2018/09/pentagon-extends-jedi-deadline-again-catch/151541/

  • Paris 2024 gearing up to face unprecedented cybersecurity threat
Toutes les nouvelles