2 juillet 2024 | International, Sécurité

Australian Man Charged for Fake Wi-Fi Scam on Domestic Flights

Australian man charged for creating fake Wi-Fi hotspots on flights to steal personal data. Learn how to protect yourself from 'evil twin' Wi-Fi attack

https://thehackernews.com/2024/07/australian-man-charged-for-fake-wi-fi.html

Sur le même sujet

  • Contract Awards by US Department of Defense - October 23, 2019

    25 octobre 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - October 23, 2019

    ARMY HBP JV, Rochester, New York, was awarded a $176,241,523 firm-fixed-price contract for construction of Community Living Center and other renovations. Bids were solicited via the internet with one received. Work will be performed in Canandaigua, New York, with an estimated completion date of Oct. 31, 2023. Fiscal 2017 and 2019 Veterans Administration medical facilities and major projects funds in the amount of $176,241,523 were obligated at the time of the award. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-20-C-0001). AIR FORCE Terma North America, Warner Robins, Georgia, has been awarded a maximum ceiling of $60,000,000 indefinite-delivery/indefinite-quantity contract for A-10 3D audio. This contract provides for up to 328 3D audio systems for the A-10. Work will be performed by a subcontractor in the U.S. and Denmark as indicated in the contract award and is expected to be completed by Feb. 28, 2024. This award is the result of a sole source acquisition. Fiscal 2018 and 2019 aircraft procurement funds in the amount of $8,282,381 are being obligated at the time of award. The Air Force Life Cycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8202-20-D-0005). General Atomics Aeronautical Systems Inc., Poway, California, has been awarded a not-to-exceed $21,723,507 cost-plus-fixed-fee and firm-fixed-price undefinitized contract modification (P00003) to previously awarded FA8620-18-C-2009 for the United Kingdom MQ-9B Protector program. This contract modification provides for the design, development, integration and component level testing of additional capabilities being added to the baseline program. Work will be performed at Poway, California, and is expect to be completed by Aug. 31, 2021. This modification involves 100% foreign military sales to the United Kingdom. Total cumulative face value of the contract is not-to-exceed $94,519,758. Foreign Military Sales funds in the amount of $10,644,519 are being obligated at the time of award. The Air Force Life Cycle Management Center, Medium Altitude Unmanned Aircraft Systems Division, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8620-18-C-2009). DEFENSE LOGISTICS AGENCY National Industries for the Blind, Alexandria, Virginia, has been awarded a $13,404,000 modification (P00012) exercising the third one-year option period of a one-year base contract (SPE1C1-17-D-B003) with four one-year option periods for the advanced combat helmet pad suspension system. This is a firm-fixed-price, indefinite-delivery/indefinite-quantity contract. Locations of performance are Virginia, Pennsylvania and North Carolina, with an Oct. 26, 2020, performance completion date. Using military service is Army. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. NAVY Northrop Grumman Systems Corp., Rolling Meadows, Illinois, is awarded an $8,946,044 cost-plus-fixed-fee delivery order (N00019-20-F-0360) against a previously issued basic ordering agreement N00019-15-G-0026. This modification procures non-recurring engineering support for the integration of the AN/AAQ-24 on multiple Department of Defense aircraft platforms for the Army. The engineering effort includes platform integration of modernized survivability equipment, maintainability, interface improvements and software to effective utilize the AN/AAR-61(V)1 more effectively. Work will be performed in Rolling Meadows, Illinois, and is expected to be completed in January 2021. Fiscal 2019 research development test and evaluation (Army) funds in the amount of $4,914,276 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/1997010/source/GovDelivery/

  • From crowd control to ‘wireless energy beaming,' the Army’s new vehicles must have more power but use less fuel

    9 novembre 2018 | International, Terrestre

    From crowd control to ‘wireless energy beaming,' the Army’s new vehicles must have more power but use less fuel

    By: Todd South As Army leadership looks to transform ground operations and logistics experts shave supply requirements such as fuel, work being done to generate more electric power with less fuel is at the heart of the land fight in the next wave of warfare. The two paths converge at work being done to “electrify” the future vehicle fleet at the Army's center for vehicle research – the Tank Automotive Research Development and Engineering Center. A November forum at TARDEC focused on advances in vehicle electrical power as service leaders, industry experts and researchers pursue ways to give more soldiers more power to run complex systems of the future. The first such forum took place in June and laid out an overview of what will need to happen to reach Army goals. Over the next year, participants will refine their plans to build a complex fleet of vehicles capable of a host of tasks not yet fielded. Vehicles have come a long way from moving forward and backward and carrying troops and ammo. “The electrical demands on the Army's vehicles today are growing far beyond anything we've seen before,” said George Hamilton, TARDEC's lead for Vehicle Electronics Architecture. “Our focus is on developing and providing a modular, flexible and adaptable vehicle architecture that can expand to meet future demands of all kinds.” And the goals are ambitious. The Army wants most of the electrification infrastructure in place or ready for testing by mid-2024 and a working, all-electric power train for the fleet by 2027. The systems and capabilities that the electrification project is pursuing are aimed at enabling seamless Multi-Domain Operations in which forces can access limited windows in the fight at various domains, from the traditional air-land-sea to cyber-electronic warfare-space domains. But, power demands on legacy vehicles only grow as more systems are added, experts said. Over time, that's meant entirely new wiring, amplifiers and other electronics architecture for the same vehicles that have been in service for decades. For example, in 2001, the standard vehicle only required a 150 amp alternator to power its onboard systems. Today, that same vehicle needs 10 times the amperage to run all of the weapon systems, computers, radios, monitors and cameras on current vehicles. At a recent talk at the Association of the U.S. Army, Lt. Gen. Aundre Piggee, the Army G-4, said that future combat operations will not be able to rely on forward operating bases. Logisticians will need to find expeditionary ways to move supplies, especially fuel, to combat units. Current brigade combat teams are able to operate for about three days before a full resupply. But Piggee said that the goal is to stretch that to seven days. To meet that end, a variety of options are being explored, but the main supply saver is reducing demand, specifically fuel. BCTs will need to use at least one-third less fuel to keep their standalone abilities at the one-week mark, he said. That extends beyond petroleum and to battery life, power consumption on smart grids, and anywhere else that technology procedures and advancements can make the formation lethal as long with less fuel or power consumption. So, at the same time that larger formations must be more self-sustaining and use less fuel, the systems that enable their fighting might will need more power. Tomorrow's vehicles will need to do much more than what's being demanded now. On the Army wish list are energy weapon systems to counter rockets, missiles and drones, wireless energy beaming to help with running unmanned ground vehicles and aerial drones with remote power, non-lethal energy weapons for crowd disbursement, silent modes for vehicle movement, high-power electronic jamming, electronic armor to deflect electromagnetic spectrum and projectile attacks, and long-range electromagnetic guns for multiple uses. And the backbone of those capabilities is an open architecture powering system on the next wave of ground vehicles that nearly any system built today or decades from now can plug into, and it will provide the power needed to run. Part of that, the Next-Generation Combat Vehicle Electrical Power Architecture, has been in development at TARDEC since 2012. Once implemented, the system is expected to provide fuel efficiency that will reduce fuel consumption by more than 10 percent and provide 20 percent more efficient power generation and energy transfer. That will put less strain on the vehicle systems while using less fuel and providing more power. And, it can take powerful hybrid vehicles, those using both petroleum-based fuels and battery or fuel cell power. This effort is coupled with a recent partnership between TARDEC and the U.S. Department of Energy into hydrogen fuel cell technology. “We think hydrogen as a fuel source, and the fuel cells that generate electricity from the hydrogen, will enable enormous capability for our warfighters,” Paul Rogers, director of TARDEC, said in a release. The applications go beyond fuel efficiency and reducing fuel logistics burdens. “Vehicles using hydrogen run on electric motor propulsion, giving very low noise and thermal signatures while in operation,” Rogers said. “Additionally, we can generate valuable electrical power using hydrogen fuel cells that currently requires noisy and heavy generators.” Both of those efforts could help not only operational forces in the tactical fight but the surrounding support that brings them their supplies. https://www.armytimes.com/news/your-army/2018/11/08/from-crowd-control-to-wireless-energy-beaming-the-armys-new-vehicles-must-have-more-power-but-use-less-fuel

  • Northrop Grumman to Enhance UH-60V Aircraft Capabilities

    23 novembre 2022 | International, Aérospatial

    Northrop Grumman to Enhance UH-60V Aircraft Capabilities

    The UH-60V is a comprehensive digital cockpit redesign that replaces the UH-60L’s legacy analog instrumentation with a fully open and integrated avionics suite

Toutes les nouvelles