14 juillet 2024 | International, C4ISR, Sécurité

Australian Defence Force Private and Husband Charged with Espionage for Russia

Australian couple arrested in Brisbane for spying on behalf of Russia, marking first espionage charges under 2018 laws.

https://thehackernews.com/2024/07/australian-defence-force-private-and.html

Sur le même sujet

  • Researchers Uncover Espionage Tactics of China-Based APT Groups in Southeast Asia

    11 décembre 2024 | International, C4ISR, Sécurité

    Researchers Uncover Espionage Tactics of China-Based APT Groups in Southeast Asia

    China-based threat actors target Southeast Asia organizations with advanced tools like PlugX and reverse proxies.

  • Contract Awards by US Department of Defense - January 24, 2020

    27 janvier 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - January 24, 2020

    ARMY Longbow LLC, Orlando, Florida, was awarded a $235,794,870 hybrid (cost-no-fee, cost-plus-fixed-fee and firm-fixed-price) Foreign Military Sales (Republic of Korea (South Korea), Greece, India, India, Indonesia, Kuwait, Netherlands, Qatar, Saudi Arabia, Taiwan, United Arab Emirates and United Kingdom) contract for procurement of production support services for the Fire Control Radar System for the Apache attack helicopter. One bid was solicited via the internet with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 31, 2025. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-20-D-0009). Georgia Vocational Rehabilitation Agency, Tucker, Georgia, was awarded a $94,213,911 firm-fixed-price contract for full food services. Bids were solicited via the internet with five received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 31, 2025. Field Directorate Office, Fort Sam Houston, Texas, is the contracting activity (W9124J-20-D-0003). United Materials of Great Falls,* Great Falls, Montana, was awarded an $8,450,955 firm-fixed-price contract for construction of new parking apron and connecting taxiways. Bids were solicited via the internet with one received. Work will be performed in Great Falls, Montana, with an estimated completion date of Oct. 30, 2020. Fiscal 2019 military construction funds in the amount of $8,450,955 were obligated at the time of the award. U.S. Property and Fiscal Office, Helena, Montana, is the contracting activity (W9124V-20-C-0002). MCON LLC,* Wathena, Kansas, was awarded a $7,536,190 firm-fixed-price contract for raising the Missouri River levee system and installing relief wells. Bids were solicited via the internet with nine received. Work will be performed in Elwood, Kansas, with an estimated completion date of Jan. 23, 2022. Fiscal 2020 civil construction funds in the amount of $7,536,190 were obligated at the time of the award. U.S. Army Corps of Engineers, Kansas City, Missouri, is the contracting activity (W912DQ-20-C-1009). AIR FORCE Rolls Royce Corp., Indianapolis, Indiana, has been awarded a $69,087,000 indefinite-delivery/indefinite-quantity contract for the T56 Engine Component Improvement Program (CIP). The T56 Engine CIP establishes a prioritized list of projects each calendar year to include developing engineering changes to the engines, developing organizational, intermediate and depot level repairs as needed, and designing modifications to existing support equipment as well as initiating new support equipment designs as required by engine driven changes. The program also provides support to resolve service-revealed deficiencies and maintain or extend the life limits of aircraft engine. Work will be performed in Indianapolis, Indiana, and is expected to be complete by Dec. 31, 2029. Foreign Military Sales Fair Share funds in the amount of $385,938 are being obligated at the time of award. This award is the result of a sole source acquisition. The Air Force Life Cycle Management Center, Tinker Air Force Base, Oklahoma, is the contracting activity (FA8626-20-D-0003). Graf Research Corp., Blacksburg, Virginia, has been awarded a $49,500,000 single award, indefinite-delivery/indefinite-quantity contract with cost-plus-fixed-fee task orders for research and development. This contract provides for applied and advanced research for the advancement of trusted and assured microelectronics technologies; trust assessment strategies in areas related to known and potential system vulnerabilities; development and implementation of mitigation strategies and methodologies to prevent vulnerabilities; development and implementation of mitigation strategies and methodologies to prevent vulnerabilities before mitigation is required. Work will be performed at Wright-Patterson Air Force Base, Ohio, and is expected to be complete by Feb. 15, 2028. This award is the result of a Small Business Innovative Research III request for proposal. Fiscal 2019 research and development funds in the total amount of $5,999,985 are being obligated at the time of award for the first task order (FA8650-20-F-1880). The Air Force Research Lab, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8650-20-D-1879). EWR Radar Systems Inc., St. Louis, Missouri, has been awarded a $20,705,290 contract for the Portable Doppler Radar (PDR) program. This contract provides for the purchase of 22 PDR systems, with an option to purchase up to an additional 14 systems. Work will be performed in St. Louis, Missouri, and is expected to be complete by Jan. 24, 2023. This contract is the result of a sole-source acquisition. Fiscal 2018 and 2019 other procurement funds in the amount of $12,662,566 are being obligated at the time of award. The Aerospace Management Systems Division, Digital Directorate, Hanscom Air Force Base, Massachusetts, is the contracting activity (FA8730-20-C-0033). L3 Harris Corp., Marietta, Georgia, has been awarded an $11,457,610 firm-fixed-price contract for repair services of electronic flight indicators and radar display units for the C‐130H Hercules. The work is expected to be complete by Jan. 24, 2025. This award is the result of a sole-source acquisition. No funds are being obligated at the time of award as this is a requirements type contract. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity (FA8538-20-D-0003). Lockheed Martin Corp., Sunnyvale, California, has been awarded a $9,856,800 cost reimbursement contract modification (P00157) to previously awarded contract FA8810-08-C-0002 for a cross domain solution (CDS). The contract modification is for an updated CDS interface and associated hardware and software changes, as well as test, installation and checkout of the modified interface. Work will be performed at Boulder, Colorado; Aurora, Colorado; Azusa, California; and Sunnyvale, California. Work is expected to be completed by Jan. 21, 2021. Fiscal 2019 research and development funds are being obligated at the time of award. Total cumulative face value of the contract is $3,451,650,654. The Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity. NAVY Advanced Technology Construction,* Tacoma, Washington (N44255-17-D-4004); Shape Construction Inc.,* Poulsbo, Washington (N44255-17-D-4006); Vet Industrial Inc.,* Bremerton Washington (N44255-17-D-4007); and Weldin Construction LLC,* Parker, Alaska (N44255-17-D-4008) are each being awarded a firm-fixed-price modification to increase the overall multiple award contract maximum, not-to-exceed amount for the indefinite-delivery/indefinite-quantity contract by $50,000,000 from $99,000,000 to $149,000,000, for design-build or design-bid-build construction projects located primarily within the Naval Facilities Engineering Command (NAVFAC) Northwest (NW) area of operation (AO). All work on this contract will be performed primarily within the NAVFAC NW AO that includes Washington state (92%); Alaska (2%); Idaho (1%); Montana (1%); Oregon (2%); and Wyoming (1%). Work for this contract may also be performed in the remainder of the U.S. (1%). The work to be performed provides for new construction, renovation, alteration, demolition and repair work by design-build or design-bid-build of facilities located primarily within the NAVFAC NW AO. Types of projects include, but are not limited to, administrative and industrial facilities, housing renovation, child care centers, lodges, recreation/fitness centers, retail complexes, warehouses, housing offices, community centers, commercial and institutional buildings, manufacturing and industrial buildings and other similar facilities. This procurement was set aside for historically underutilized business zone construction firms. The term of the contract is not to exceed 60 months, with an expected completion date of December 2021. Task orders will be primarily funded by military construction (Navy); operations and maintenance (Navy); and Navy working capital funds. This contract was competitively procured via the Federal Business Opportunities website with 12 proposals received. These four contractors may compete for task orders under the terms and conditions of the awarded contract. NAVFAC NW, Silverdale, Washington, is the contracting activity. Rolls-Royce Corp., Indianapolis, Indiana, is awarded a $20,487,223 modification (P00003) to a previously awarded firm-fixed-price requirements contract (N00019-19-D-0024). This modification exercises the option to provide T56-A-427 engine depot repair to include repair of the power section, torque meter, gearbox and accessories in accordance with Navy depot manuals and approved repair practices. Work will be performed in San Antonio, Texas (70%); Winnipeg, Canada (25%); and Indianapolis, Indiana (5%), and is expected to be completed in January 2021. No funds are being obligated at time of award; funds will be obligated on individual orders as they are issued. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Lockheed Martin Mission Systems and Training, Manassas, Virginia, is awarded a $16,851,140 cost-plus-incentive-fee and cost-only modification to a previously awarded contract N00024-18-C-5218 to produce Technical Insertion-20 Shore Site Systems and provide incremental funding in support of the continued development, integration and production of the Navy's AN/SQQ89-A(V)15 Surface Ships Undersea Warfare System. This option exercise is for the procurement of shore site systems to further develop TI-20 AN/SQQ-89A(V)15 systems. AN/SQQ-89A(V)15 is the Surface Ship Undersea Warfare combat system with the capabilities to search, detect, classify, localize and track undersea contacts, and to engage and evade submarines, mine-like small objects and torpedo threats. The contract is for development, integration and production of future Advanced Capability Build and Technical Insertion baselines of the AN/SQQ-89A(V)15 USW Systems. This contract combines purchases for the Navy (85%); and the government of the Commonwealth of Australia (15%) under the Foreign Military Sales (FMS) program. Work will be performed in Lemont Furnace, Pennsylvania (73%); Clearwater, Florida (24%); Syracuse, New York (2%); Marion, Massachusetts (1%); and is expected to be completed by June 2021. Fiscal 2016 shipbuilding and conversion (Navy) (35%); 2019 research, development, testing and evaluation (15%); 2020 other procurement (Navy) (15%); 2018 shipbuilding and conversion (Navy) (13%); FMS Australia (15%); and 2019 other procurement (Navy) (7%) funding in the amount $16,851,140 will be obligated at the time of award, and $2,617,132 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Vigor Marine LLC, Portland, Oregon, is awarded a $15,284,851 firm-fixed-price contract for a 75 calendar-day shipyard availability for the regular overhaul and dry-docking of USNS Charles Drew (T-AKE 10). Work will be performed in Portland, Oregon, and is expected to be completed by May 9, 2020. The maximum dollar value, including base period and six options is $15,284,851. Fiscal 2020 working capital funds in the amount of $14,629,243 are being obligated at the time of the award. Contract funds in the amount of $14,629,243 are obligated in fiscal 2020 and do not expire at the end of year. This contract was competitively procured with one company soliciting via the Federal Business Opportunities website and one offer received. The Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity (N32205-20-C-6172). Battelle Memorial Institute, Columbus, Ohio, is awarded a $14,484,290 modification to a previously awarded firm-fixed-price other transaction agreement (N66001-18-9-4703) in support of prototype project “Artificial Intelligence Enhanced Autonomy for Long-endurance System Operations” to design and implement autonomy software to support long-term, continuous autonomous operation goals of the Office of Naval Research's Future Naval Capabilities system prototype. This three-year modification includes no options. The period of performance is Jan. 24, 2020 - Jan. 23, 2023. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $626,000 will be obligated at the time of award. Funds will not expire at the end of the fiscal year. Work will be performed in Edinburgh, Scotland (32%); Cambridge, Massachusetts (26%); Fairfax, Virginia (18%); Woburn, Massachusetts (16%); and Concord, Massachusetts (8%). This other transaction agreement was competed under the authority of Section 815 of the National Defense Authorization Act for fiscal 016, Public Law 114-92, and permanently codified in 10 U.S. Code 2371b. The Naval Information Warfare Center, Pacific, San Diego, California, is the contracting activity (N66001-18-9-4703). DEFENSE LOGISTICS AGENCY DNO Inc.,* Columbus, Ohio, has been awarded a maximum $48,000,000 firm-fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for fresh fruits and vegetables. This was a competitive acquisition with four responses received. This is a 36-month contract with no option periods. Locations of performance are Michigan and Ohio, with a Jan. 21, 2023, performance completion date. Using customers are Department of Agriculture schools. Type of appropriation is fiscal 2020 through 2023 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-20-D-S741). Seiler Instrument & Manufacturing Co., Inc.,* St. Louis, Missouri, has been awarded a maximum $12,482,499 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for mount telescopes. This was a competitive acquisition with three responses received. This is a five-year contract with no option periods. Location of performance is Missouri, with a Jan. 25, 2025, performance completion date. Using military service is Army. Type of appropriation is fiscal 2020 through 2025 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-20-D-0059). DEFENSE ADVANCED RESEARCH PROJECTS AGENCY Northrop Grumman Systems Corp., Redondo Beach, California, has been awarded a $13,006,683 cost-plus-fixed-fee contract for the base period of the Glide Breaker program. This contract provides for the research, development and demonstration of a technology that is critical for enabling an advanced interceptor capable of engaging maneuvering hypersonic threats in the upper atmosphere. Work will be performed in Redondo Beach, California (73%); Mesa, Arizona (21%); Sacramento, California (4%); and Huntsville, Alabama (2%), with an estimated completion date of January 2021. Fiscal 2019 research and development funds in the amount of $13,006,683 are being obligated at the time of award. This contract is a competitive acquisition in accordance with the original broad agency announcement, HR0011-19-S-0008. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity (HR001120C0025). Battelle Memorial Institute, Columbus, Ohio, has been awarded a $7,483,871 modification (P00003) for the option effort on previously awarded contract HR0011-19-C-0019. The contract is for research and development of an advanced networked sensor to detect and identify biological weapons of mass destruction threats in support of the SIGMA+ program. The modification brings the total cumulative face value of the contract to $9,985,170. Work will be performed in Columbus, Ohio (60%); and Cambridge, Massachusetts (40%), with an expected completion date of June 2021. Fiscal 2020 research, development, test and evaluation funds in the amount of $1,430,000 are being obligated at time of award. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity. *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2065636/source/GovDelivery/

  • Japan Could Pick And Choose Components From Tempest

    2 décembre 2019 | International, Aérospatial

    Japan Could Pick And Choose Components From Tempest

    Bradley Perrett Japan says it wants international collaboration in developing its Future Fighter for the 2030s, but it wants to lead the project despite limited experience in fighter development. And it aims at a fighter much larger than any operated by a western European country ; the U.S. is not offering a possible joint project. That seems to leave only the choice of indigenous development, perhaps with help from a foreign technical partner. Nevertheless, participation in the UK's Tempest program may also be feasible. The Tempest project—which includes the Royal Air Force, BAE Systems, Rolls-Royce and MBDA—has a cooperation concept that leaves scope for Japan and other partners to use their own systems, weapons, propulsion and even airframes, says Air Commodore Daniel Storr, head of combat aircraft acquisition at the UK Defense Ministry. The model described by Storr gives Japan the flexibility to choose the size of its own fighter. Though evidently not an objective, this mix-and-match approach also creates an opportunity for Japan to continue to claim development leadership—but also to save money by sharing systems. The policy goal of running its own fighter program, stated in 2018, has looked like a big obstacle to Japan's participation in the Tempest or the Future Combat Air System (FCAS) project initiated by France and Germany. But if the Future Fighter shared only some features with Tempest, Japan could reasonably say it was leading its own program. BAE Systems promoted the Tempest program at the DSEI Japan exhibition held in Tokyo fromNov. 18-20. Prospective FCAS prime contractors, such as Airbus, did not show their concept. Storr outlined the flexible model of cooperative development at an exhibition conference, but Japanese speakers at that event did not comment on the prospect of Japan joining Tempest. In a Nov. 1 interview with The Financial Times, newly appointed Defense Minister Taro Kono seemed to play down the possibility of participation in a European program, saying Japan should explore all possibilities but needed to maintain interoperability with U.S. forces. Storr addressed that point, emphasizing that working with the U.S. was a high priority for the UK too. Japan's alternative to international cooperation is developing a fighter by itself with the technical help of a foreign company. Lockheed Martin is supporting the Korea Aerospace Industries KF-X and BAE is helping the Turkish Aerospace Industries TF-X in such an arrangement. By working with Lockheed Martin, Boeing or Northrop Grumman, Tokyo would partially compensate the U.S. for its expenditures in defending Japan. But the U.S. would gain little from technical support fees, and Japan is already committed to buying 147 Lockheed Martin F-35 Lightnings as the aircraft to precede the Future Fighters. The defense ministry has asked for the development of the Future Fighter to be launched in the fiscal year beginning April 2020. It is not clear whether that means mobilizing resources to commence full-scale development or taking some lesser step to firm up the commitment to create the aircraft. For the past year, the government's policy has been to launch no later than March 2024. However, Japanese companies, especially fighter builder Mitsubishi Heavy Industries (MHI), are pushing for a launch as soon as possible. They want to transfer knowledge to young engineers from the older generation that developed Japan's last fighter, the MHI F-2, which the Future Fighter will replace. The UK does not want to commit to launching full-scale development of the Tempest before 2025, but its date for entry into service in 2035 meets Japan's objective, which is sometime in the 2030s. Meanwhile, the FCAS program is aiming at 2040. Sweden and Italy are cooperating with the UK during the current early stage of Tempest research, while Spain has joined France and Germany for FCAS work. Like Storr, BAE has stressed the advantages of partners taking only as much of the Tempest as they want. “There is a range of different partnership models that can be considered,” says Andy Latham, who is working on the program. “Japan has some great technology that any partner can benefit from. Their avionics industry is pretty effective.” The cooperation concept replaces the standard model, one in which partners spend years negotiating and compromising to define a design that all of them must accept. Instead, according to Storr, they can save time and money by agreeing to disagree—to the extent that each is willing to pay the extra cost of independent development and manufacturing of design elements. The Japanese defense ministry's studies point to a need for a very big fighter with an empty weight well above 20 metric tons (40,000 lb.), larger than the Lockheed Martin F-22 Raptor. Superior endurance and internal weapon capacity are the key factors behind this choice. No western European country has operated a fighter more than about two-thirds as big, but Storr said a large configuration for the Tempest cannot be ruled out. The mockup exhibited at the 2018 Farnborough International Airshow was bigger than the F-22. Still, the UK and other European partners might want a much smaller fighter; concept designs that have not been shown are not as big as the mockup. But the concept for cooperation would allow for Japan to devise its own airframe while, for example, using the same engine and some weapons, software and avionics as other partners. The architecture of the software is intended to be open, accepting different programs easily. Tempest researchers will consider which systems and capabilities will go into the fighter and which will be incorporated into the ammunition or an accompanying drone, which could be fully reusable or optionally expendable, Storr says. The FCAS program is taking a similar approach. The Tempest will need great capacity for generating electricity, he says, and the weapon bay should be regarded as a payload bay, perhaps for holding additional fuel that would extend endurance on surveillance missions. The Japanese finance ministry is insisting upon private investment in the Future Fighter program, in part to ensure contractors are fully incentivized to prevent failure. Contractors will be able to make money in civil programs from technology developed for the fighter, says the ministry, which is highly influential but does not have a final say. “Judging from past program examples, it is clear that the Future Fighter program would bring a risk of a budget overrun and schedule slippage, but would also benefit the private sector,” the finance ministry said in an October presentation to the Council on Fiscal Policy, an advisory body. “The government and private sector should invest funds and resources to build a failure-proof framework.” Noting that MHI used technology from the F-2 program in its development and manufacturing of the outer wing boxes of the Boeing 787, the ministry says contractors can expect to gain similar opportunities for civil applications of technology from the Future Fighter program—so they should invest in it. https://aviationweek.com/defense/japan-could-pick-and-choose-components-tempest

Toutes les nouvelles