18 juin 2019 | International, Aérospatial

Army Buys 9,000 Mini-Drones, Rethinks Ground Robots

By

WASHINGTON: This summer, Army soldiers will deploy to Afghanistan with air support literally in the palm of their hands: the 1.16-ounce Black Hornetmini-drone. New ground robots are entering service too, next year — not to fight but to haul supplies, at least at first — but field tests have convinced the Army to issue these often-cumbersome mechanical mules to specialists and only loan them to frontline troops as needed. By contrast, soldiers are so consistently and unequivocally enthused about the mini-drones that the Army is buying 9,000 systems — each with two drones — over three years to issue to its smallest and historically most vulnerable units, nine-man infantry squads.

The mini-drone and larger robots are all part of a wider revolution in the long-suffering infantry, a revolution sparked in large measure by former Defense Secretary Jim Mattis. The Marines, Mattis's old service, have issued upgraded 5.56 mm rifles and are adding a specialized drone operator to every rifle squad. The Army is going much farther, developing new 6.8 mm rifles, high-tech targeting goggles, virtual-reality training, and, of course, robots.

Now, none of these unmanned systems is truly autonomous, so they require a human to run them by remote control, which in turn requires a functioning battlefield network that hasn't been shut down by enemy jamming. The FLIR Black Hornet has a lot of automated functions and only flies short missions, so you don't need a soldier babysitting it all the time. Ground robots, however, require much more oversight, because they have to avoid rocks, bogs, tree stumps, and other obstacles that no unmanned air vehicle has to worry about and that artificial-vision software still struggles to spot. The Army is eager to improve the technology so that, instead of one soldier remote-controlling one robot, they can have one soldier overseeing a largely autonomous swarm. But even today's limited autonomy allows for big changes on the battlefield.

The palmtop Black Hornet — dubbed Soldier-Borne Sensor (SBS) by the Army — is already in the hands (literally) of a brigade of the elite 82nd Airborne that's about to deploy to Afghanistan. The second unit scheduled to get the mini-drone, starting this fall, is the 1st Security Force Assistance Brigade, which has already served in Afghanistan.

For the first time, a squad leader will have the ability to scout ahead by air before exposing human soldiers on the ground. The SBS has sensor options for both night and day, and it can fly about 20 minutes before needing to recharge.

But the squad-level mini-drone is just the entry model. Larger units will get larger, more capable, but also more expensive and more maintenance-hungry drones.

“Our vision is every echelon has unmanned aerial systems,” said Don Sando, civilian deputy to the commander of the Army's infantry and armor centerat Fort Benning, Ga. “The question is, how many?”

While squads get the Black Hornet SBS, platoons will get the slightly larger Short-Range Reconnaissance (SRR) drone, Sando and other Army officials told reporters in a conference call last week. A series of tests this month, September, and January will whittle six SRR competitors down to one that will enter service in April 2020. The winner must weigh three pounds or less, fly for 30 minutes, and be able to “perch and stare,” landing in a vantage point overlooking a target area so it can keep watch without burning through its flight time.

Companies will stick with the current RQ-11 Raven, which is still small enough that soldiers launch it by picking it up and throwing it.

Battalions currently use the Raven as well, but the Army plans to develop a new Long-Range Reconnaissance drone for them to use. The LRR isn't an official program yet, however.

Brigades currently have the RQ-7 Shadow, but that aging system needs a catapult to launch and a runway to land. It will be replaced by the Future Tactical Unmanned Aerial System (FTUAS), which takes off and lands vertically like a mini-helicopter, starting in 2021.

Divisions currently use the Grey Eagle, a variant of the venerable Predator, but the Army is experimenting with potential Advanced UAS drones to replace it too.

Ground Bots For Some

The Army is also fielding ground robots, but these machines are still much clumsier and harder to work with than aerial drones, so they're being issued only to specialist units. That includes what was formerly called the SquadMultipurpose Equipment Transport but is now renamed the Small Multipurpose Equipment Transport, because it's not going to belong to an individual squad.

The SMET, by either name, is still a small unmanned ground vehicle, about the size of a golf cart, designed to trundle along with the foot troops, hauling supplies and gear like an old-fashioned pack mule. It must carry 1,000 pounds of supplies and gear over 60 miles in 72 hours, trundling along with foot troops, and provide three kilowatts of power to recharge batteries for night vision goggles, radios, and other electronics.

Four competitors remain in contention: the Polaris MRZR, Howe & Howe Grizzly, HDT Wolf, and General Dynamics MUTT. “They're all viable candidates. They all met the standards of range, offloading power, silent watch capability, payload carrying,” Sando said. “Soldier feedback on all of them was very comparable with regard to what missions they're good for — and what conditions they're not appropriate for.”

The Army plans to field the winner starting next year to selected training centers, combat brigades, and support companies — but not infantry squads. “We found out in the operational tech demonstration [that] it can best be supported now at the battalion level,” Sando said, which is the lowest echelon of an infantry unit to include technical specialists such as a heavy weapons company. The Army's objective is to incorporate the new technologies without adding personnel to take care of them.

The issue with SMET is not just the maintenance the robots require — though that can be a large burden for a squad of nine — but also their limited mobility. “There are places where we ask our soldiers to go where nothing else can go... jungle terrain, steep embankments, water, and dense urban environments,” Sando said. “There are areas soldiers can walk and crawl and climb that we just couldn't put a vehicle of this size with them.”

The SMET remains very useful for long marches with heavy loads, the bane of infantry soldiers increasingly overburdened by body armor, ammunition, and electronics. Being able to recharge gear from the robot instead of carrying several days' worth of batteries for every item of equipment is itself a significant reduction in weight. Future SMET variants, Sando said, might carry long-range sensors, communications relays, or even weapons.

But when foot troops have to go places you can only go on foot, they need to be able to leave the robot vehicles behind and let someone else take care of them. By contrast, Sando said, “the Soldier-Borne Sensor is smaller than a pack of cigarettes, [so] I can use it when I need it, I can put it back.”

https://breakingdefense.com/2019/06/army-buys-9000-mini-drones-for-squads-rethinks-ground-robots-for-2020/

Sur le même sujet

  • Boeing’s KC-46 tanker now has a pathway for autonomous aerial refueling

    9 avril 2020 | International, Aérospatial

    Boeing’s KC-46 tanker now has a pathway for autonomous aerial refueling

    By: Valerie Insinna WASHINGTON — Last week's deal between Boeing and the U.S. Air Force on a fix for the KC-46 could pave the way for the tanker to refuel other aircraft without a person needed to manually control the process, a top service official said Thursday. On April 2, Boeing agreed to fix the KC-46's troubled Remote Vision System by creating an overhauled RVS 2.0 with new hardware and software. Air Force acquisition executive Will Roper told reporters those changes would include the addition of 4K high-definition cameras that will display imagery in color as well as modern processors and LiDAR (light detecting and ranging) sensors that will help improve depth perception. “A proper RVS like that is right on the doorstep to autonomy,” Roper said. “All you have to do is take that data that tells the world inside the jet the reality of geometries between the airplane and the boom outside the jet. Once you have that, you simply need to translate it into algorithms that allow the tanker to tank itself.” The KC-46's Remote Vision System has been a thorn in the side of the aircraft program since 2017, when issues with the system were first discovered. The RVS is basically a suite of cameras, sensors and software that is supposed to allow boom operators sitting inside the aircraft to safety steer the boom into the aircraft needing fuel. But in certain conditions, the system produces distorted imagery that increases the risk of the boom hitting another aircraft. The new LIDAR system will be key to fixing that problem, said Roper, who likened it to a backup camera on a car that also provides cues to a driver for parallel parking or assessing whether a vehicle is aligned flush to a curb. “We'll have something very similar to that for the boom operators, so telling them are they left, right and how close are they getting to the airplane,” he said. “[It's] something very intuitive and easy to work with, and I think that will help significantly with them understanding their distance [from the other aircraft] because LIDAR is extremely accurate.” Because Boeing is locked into a firm fixed-price contract for the development of the KC-46, it will have to pay for the upgrade to RVS 2.0 out of its own pocket, as the Air Force maintains that the current system does not meet requirements. But the service is so confident in the prospect of using the RVS 2.0 as a stepping stone to an autonomous tanker that it included an option in last week's agreement to fund the development of technologies that enable autonomous or semiautonomous refueling. “We have added an engineering change proposal into the deal with a not-to-exceed threshold of $55 million, so that when RVS 2.0 is done, we can then take the next step beyond 2.0 to develop those autonomy algorithms and install them if we think we can certify them for safe use,” Roper said. “We took that step because, one, we're excited about being on the doorsteps of autonomy and, [two], we wanted to send a clear signal in the deal that this is our tanker for the future,” he said. If the Air Force decides to move forward with those design changes, more will need to be done to hammer out the contractual details, said Jamie Burgess, Boeing's KC-46 program manager. “There was no commitment one way or another on who pays for what. But there's definitely a strong partnership between Boeing and the Air Force as far as developing this technology,” he said. Autonomous refueling capability has been of increasing interest to the Air Force over the past few years, as sensing and artificial intelligence technologies grow by leaps and bounds. Boeing previously signaled it could include such technology as part of a menu of potential upgrade options for the KC-46, as reported by FlightGlobal in 2018. https://www.defensenews.com/air/2020/04/08/boeings-kc-46-tanker-now-has-a-pathway-for-autonomous-aerial-refueling

  • Polish Defence Ministry confirms plan to buy M1 Abrams tanks

    15 juillet 2021 | International, Terrestre

    Polish Defence Ministry confirms plan to buy M1 Abrams tanks

    Deliveries of the new tanks are expected to begin in 2022.

  • Contract Awards by US Department of Defense - February 25, 2020

    27 février 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - February 25, 2020

    ARMY Palantir USG Inc., Palo Alto, California (W56KGY-20-D-0005); and BAE Systems Information and Electronic SYS INT INC, San Diego, California (W56KGY-20-D-0006), will compete for each order of the $823,263,105 firm-fixed-price contract to upgrade/replace components found in the Distributed Common Ground System-Army. Bids were solicited via the internet with six received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 24, 2027. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. Northrop Grumman Systems Corp., Herndon, Virginia, was awarded a $42,088,702 hybrid (cost-no-fee, cost-plus-fixed-fee, cost-plus-incentive-fee, firm-fixed-price, fixed-price-incentive) modification (P00054) to contract (W58RGZ-17-C-0014) for contractor logistics support services for government-owned fixed-wing fleet performing Special Electronic Mission Aircraft missions. Bids were solicited via the internet with three received. Work will be performed in Herndon, Virginia, with an estimated completion date of Aug. 31, 2020. Fiscal 2020 operations and maintenance, Army funds in the amount of $42,088,721 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. Leidos Inc., Reston, Virginia, was awarded a $19,653,151 modification (P00023) to contract W52P1J-18-C-0002 to provide Class V munitions supply support for all ammunition stocks accounted for by 1st Sustainment Command (Theater) to U.S. military/government components, Department of Defense agencies, and, as required, coalition forces in the Central Command Area of Responsibility. Work will be performed in Kuwait City, Kuwait, with an estimated completion date of Feb. 28, 2021. Fiscal 2020 operation and maintenance, Army funds in the amount of $19,653,151 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. Unisys Corp. Federal Systems, Reston, Virginia, was awarded a $14,029,965 cost-no-fee, firm-fixed-price contract for an 18-month bridge to continue support for the Army Enterprise Service Desk. Bids were solicited via the internet with one received. Work will be performed in Augusta, Georgia, with an estimated completion date of Sept. 25, 2021. Fiscal 2020 operations and maintenance, Army funds in the amount of $14,029,965 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-20-C-0010). A. WBE-CCI JV One LLC,* Itasca, Illinois, was awarded an $11,877,000 firm-fixed-price contract for construction of a pre-engineered metal hangar with conventional construction for adjacent support shop, administrative and non-destructive inspection testing spaces. Bids were solicited via the internet with four received. Work will be performed in Klamath Falls, Oregon, with an estimated completion date of March 9, 2021. Fiscal 2018 military construction, Army National Guard funds in the amount of $11,877,000 were obligated at the time of the award. U.S. Property and Fiscal Office, Salem, Oregon, is the contracting activity (W50S8Z-20-C-0001). PAS MRO Inc.,* Irvine, California, was awarded a $9,787,000 firm-fixed-price contract to overhaul UH-60 tip caps. Bids were solicited via the internet with eight received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 25, 2025. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-20-D-0026). NAVY Deloitte Consulting LLP, Arlington, Virginia; Boston Consulting Group Federal Corp., Bethesda, Maryland; Whitney, Bradley & Brown Inc., Reston, Virginia; Mid-Atlantic Technical and Executive Consulting LLC,* Arlington, Virginia; and CACI Inc., Federal, Chantilly, Virginia, are awarded a cumulative not-to-exceed $249,000,000 indefinite-delivery/indefinite-quantity (IDIQ) contracts for the Navy's System-Level Cost Analysis with Total Ownership Cost Analysis initiative. The competitive ordering period for both firm-fixed-price or cost-plus-fixed-fee type orders shall not exceed five years. Work will be performed at contractor and vendor facilities as determined on individual orders and is expected to be completed by February 2025. Fiscal 2020 operations and maintenance (Navy) funding in the amount of $15,000 will be obligated at time of award to fulfill the minimum guarantees of the IDIQs and will not expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with seven offers received. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity (N00024-20-D-2425, N00024-20-D-2431, N00024-20-D-2432, N00024-20-D-2433, and N00024-20-D-2434). BAE Systems Land & Armaments L.P., Sterling Heights, Michigan, is awarded a $113,548,696 modification to exercise options for the fixed-price-incentive (firm target) contract line item numbers 4001 and 4005 portions of a previously awarded contract (M67854-16-C-0006). This modification is for the purchase of 26 amphibious combat vehicles and other associated production costs. Work will be performed in York, Pennsylvania (60%), Aiken, South Carolina (15%), San Jose, California (15%), Sterling Heights, Michigan (5%), and Stafford, Virginia (5%), and is expected to be completed in April 2022. Fiscal 2020 procurement (Marine Corps) funds in the amount of $113,548,696 will be obligated at the time of award and will not expire at the end of the current fiscal year. The contract was based on full and open competition with the solicitation publicized on the Federal Business Opportunities website with five offers received. The option contract line item numbers were included within that contract and are being exercised in accordance with Federal Acquisition Regulation 52.217-7 option for increased quantity-separately priced line item. The Marine Corps Systems Command, Quantico, Virginia, is the contracting activity (M67854-16-C-0006). Vertex Aerospace LLC, Madison, Mississippi, is awarded a $23,925,125 modification (P00005) to a previously awarded firm-fixed-price, cost contract (N00421-19-D-0031). This modification exercises the option to provide contractor owned and operated aircraft to Navy fleet customers, foreign military sales customers, and contractors as well as Department of Defense and other government agencies in support of the Contracted Air Services (CAS) program. The CAS program provides airborne threat simulation capabilities to train shipboard and aircraft squadron weapon systems operators and aircrew on how to counter potential enemy electronic warfare and electronic attack operations in today's electronic combat environment. Work will be performed in Virginia Beach, Virginia (50%); Coronado, California (40%); and Kauai, Hawaii (10%), and is expected to be completed in February 2021. No funds are being obligated at time of award; funds will be obligated on individual orders as they are issued. The Naval Air Warfare Center, Aircraft Division, Patuxent River, Maryland, is the contracting activity. L3Harris Technologies Inc., Palm Bay, Florida, is being awarded a $14,693,123 modification to exercise priced options to a previously awarded firm-fixed-price contract issued by the Naval Information Warfare Systems Command. This modification increases the value of the basic contract by $14,693,123; the new total value is $61,180,747. This modification provides for the exercise of firm-fixed-price options for Commercial Broadband Satellite Program Unit Level Variant (ULV) hardware production units. ULV provides terminal-to-shore, space and terrestrial connectivity to significantly increase throughput for commercial satellite communication and provides redundancy for military satellite communications. Work will be performed in Palm Bay, Florida, and is expected to be completed by August 2020. Fiscal 2019 shipbuilding and conversion (Navy), and fiscal 2019 and fiscal 2020 other procurement (Navy) funds in the amount of $14,693,123 will be obligated at the time of award and will not expire at the end of the fiscal year. The Naval Information Warfare Systems Command, San Diego, California, is the contracting activity (N00039-14-C-0041). DCS Corp., Alexandria, Virginia, is awarded a $10,649,613 modification (P00027) to a previously awarded cost reimbursable, cost-plus-fixed-fee contract (N00421-17-C-0043). This modification provides for the planning and execution of test efforts for aircraft and weapons components through a Milestone C decision to include developmental and operational test and evaluation efforts associated with modifications to existing commercial-off-the-shelf and non-developmental items, which require engineering, design, integration, test and evaluation. This modification also provides contractor services support in administration, engineering and management functions in support of the Naval Test Wing Atlantic, Naval Air Systems Command and the Naval Air Warfare Center Aircraft Division. Work will be performed in Patuxent River, Maryland, and is expected to be completed in February 2021. Working capital (Navy) funds in the amount of $3,062,000 and fiscal 2020 operations and maintenance funds in the amount of $812,739 will be obligated at time of award, $812,739 of which will expire at the end of the current fiscal year. The Naval Air Warfare Center, Aircraft Division, Patuxent River, Maryland, is the contracting activity. Progeny Systems Corp.,* Manassas, Virginia, is awarded a $9,913,382 cost-plus-fixed-fee delivery order (N68335-20-F-0068) against basic ordering agreement (N68335-18-G-0039). This delivery order provides for continued maturation of the Expeditionary Mission Planning System. Work will be performed in Manassas, Virginia (65%) and Middletown, Virginia (35%), and is expected to be completed in February 2022. Fiscal 2019 research, development, test and evaluation (Navy) funds in the amount of $9,100,000 will be obligated at time of award, all of which will expire at the end of the current fiscal year. The Naval Air Warfare Center, Aircraft Division, Lakehurst, New Jersey, is the contracting activity. Vigor Marine LLC, Portland, Oregon, is awarded a $9,329,088 firm-fixed-price contract for the maintenance, repair and preservation of Caisson Six. Work will be performed in Seattle, Washington, and is expected to be completed by December 2020. Fiscal 2020 operations and maintenance (Navy) funding in the amount of $9,329,088 will be obligated at time of award and will expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1) (only one responsible source and no other supplies or services will satisfy agency requirements). The Puget Sound Naval Shipyard and Intermediate Maintenance Facility code 400, Bremerton, Washington, is the contracting activity (N4523A-20-C-1053). Raytheon Co., Missile Systems, Tucson, Arizona, was awarded a $7,992,944 cost plus fixed fee modification to previously awarded contract (N00024-17-C-5405) for design agent engineering and technical support services for the Phalanx Close-In Weapon System, SeaRAM, and Land-based Phalanx Weapon System. Work will be performed in Tucson, Arizona, and is expected to be completed by January 2022. Fiscal 2020 weapon procurement (Navy) funding in the amount of $7,992,944 will be obligated at time of award and will not expire at the end of the current fiscal year. In accordance with 10 U.S. Code 2304(c)(1), this contract was not competitively procured; only one responsible source and no other supplies or services will satisfy agency requirements. Phalanx Close-In Weapon System is a fast-reaction terminal defense against low and high-flying, high-speed maneuvering anti-ship missile threats that have penetrated all other defenses. The Naval Sea Systems Command, Washington Navy Yard, District of Columbia, is the contracting activity. Awarded Feb. 24, 2020. The Boeing Co., St. Louis, Missouri, is awarded a $7,373,400 firm-fixed-price delivery order (N00019-20-F-0573) against basic ordering agreement (N00019-16-G-0001). This delivery order procures 30 A1 G-Model kits and 66 A3 E-Model kits in support of F/A-18E/F and EA-18G modifications. Work will be performed in El Segundo, California (86%); St. Louis, Missouri (6%); San Antonio, Texas (6%); and Mesa, Arizona (2%), and is expected to be completed in October 2023. Fiscal 2019 ($3,701,400) and fiscal 2020 ($3,672,000) aircraft procurement (Navy) funds in the amount of $7,373,400 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. AIR FORCE Tapestry Solutions Inc., San Diego, California, has been awarded a $28,390,620 for F-15 mission planning software development and maintenance. This contract provides for the F-15 software development of the v6.1 Mission Planning Environment and supports the F-15 Organizational Flight Program Suite 9.1 through sustainment of the previously-fielded v5.0 Mission Planning Environment for the Air Force and foreign country specific releases for the foreign military sales (FMS) client nations as well as the in-test v6.0 Mission Planning Environment. The foreign military sales effort allows continued support to incorporate requirements to provide country specific versions of Air Force Mission Planning Environment updates in accordance with each country specific FMS Letters of Acceptance between the U.S. government and the foreign government. The Mission Planning Environment updates will be fielded outside the continental U.S. to the foreign military sales costumers with current Letters of Acceptance in place with the U.S. government. Work will be performed in Maryland Heights, Missouri, and is expected to be complete by July 31, 2023. This contract involves foreign military sales to Canada, Saudi Arabia, Singapore, Korea and Qatar. Plans to include Japan and other countries are to be anticipated. This award is the result of a sole-source acquisition. Fiscal 2020, 2021, 2022 and 2023 and include operations and maintenance and research and development funds in the amount of $387,876 are being obligated at the time of award. Hanscom Air Force Base, Massachusetts, is the contracting activity (FA8730-20-C-0001). L3Harris Technologies Inc., Colorado Springs, Colorado, has been awarded a $22,990,454 cost reimbursement and cost-plus-incentive-fee contract for Transition-On and Ground Based Electro-Optical Deep Space Surveillance Upgrade Technical Maturation and Risk Reduction on the Maintenance of Space Situational Awareness Integrated Capabilities (MOSSAIC) acquisition. MOSSAIC will provide sustainment services for current and future ground-based Space Situational Awareness (SSA) sensors, SSA Command and Control systems, and Space Battle Management Command and Control capabilities in the Space and Missile System Center Space Domain Awareness Division Special Programs - Ground portfolio. Additionally, MOSSAIC provides for sustainment of and modernization of associated test and integration infrastructure capabilities supporting the Space Domain Awareness Division Special Programs - Ground portfolio. The MOSSAIC contract scope will also include modifications and upgrades for all MOSSAIC systems, it sustains or will sustain, to maintain operational performance and evolve system capabilities to meet new mission needs, as necessary. The location of performance is Colorado Springs, Colorado, and Dahlgren, Virginia. This awarded work is expected to be completed by Nov. 30, 2020. This award is a result of a competitive acquisition solicited on BetaSam and two offers were received. Fiscal 2020 operations and maintenance funds in the amount of $1,804,531 and fiscal 2020 research and development funds in the amount of $6,000,000 are being obligated at the time of award. The Space and Missile System Center Directorate of Contracting, Peterson Air Force Base, Colorado Springs, Colorado, is the contracting activity (FA8823-20-C-0004). Call Henry Inc., Titusville Florida, has been awarded a $10,096,797 predominantly fixed-price incentive modification (P00075) to previously awarded contract FA4610-18-C-0005, to exercise option year three. This modification provides management and support, maintenance and repair, operations, other services and minor alteration related to launch operations support. This modification brings the total cumulative face value of the contract to $60,535,156. Work will be performed at Vandenberg Air Force Base, California, and is expected to be completed by June 30, 2021. Fiscal 2020 operations and maintenance funds in the amount of $3,200,000 will be obligated at the time of award. The 30th Contracting Squadron, Vandenberg Air Force Base, California, is the contracting activity. *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2094196/source/GovDelivery/

Toutes les nouvelles