Back to news

November 11, 2024 | International, Land

US Army awards Repkon $435m contract for TNT production facility 

Repkon USA - Defense has won a contract action with a ceiling of $435m for domestic trinitrotoluene (TNT) production from the US Army’s Joint Program Executive Office Armaments & Ammunition (JPEO A&A) and US Army Contracting Command - Rock Island.  

https://www.army-technology.com/news/us-army-repkon-tnt-production-facility/

On the same subject

  • Support growing for review of Ligado interference information

    May 14, 2020 | International, C4ISR

    Support growing for review of Ligado interference information

    Aaron Mehta As the Department of Defense and its allies attempt to stop Ligado from moving forward with plans the Pentagon says will harm the Global Positioning System, consensus is growing around the idea of an independent review of the testing the Department had completed for interference. The dispute stems from the Federal Communications Commission's decision to approve Ligado's request to use L-Band spectrum, first reported by C4ISRNET April 10. Now the question is whether Pentagon tests showing that Ligado's plan would interfere with GPS signals vital to military, commercial and civilian technologies are still relevant, given mitigation plans from the company. A May 6 Senate Armed Services Committee hearing on the issue underlined a fundamental disconnect between the two sides over technical testing of Ligado's capabilities, a he-said-he-said situation where both sides claim the data shows the other is comprehensively wrong. That disconnect is an issue for Sen. Jim Inhofe, R-Okla., the chairman of the SASC and a vocal supporter of the Pentagon's position. “What I took away from our hearing last week was that the results of DoD's testing just don't match up with the testing the FCC relied on to make their decision; in fact, I'm concerned they were looking at different things,” Inhofe told C4ISRNET this week. “It seems to me the FCC didn't really give DOD's analysis — which was done in conjunction with eight other federal departments — fair consideration,” Inhofe continued. “While I trust the Pentagon's conclusions, I think we'll all sleep better at night if we have more independent testing done to verify just how Ligado's plan will affect our GPS signals.” While not saying who should do the verification, Inhofe's comments match up with calls from a trio of non-defense trade groups that in the last few days have specifically called for the National Academy of Sciences — a non-profit, non-governmental research institute that can play a role as a neutral arbiter — to take a fresh look at the data gathered by both the Pentagon and Ligado and weigh in. On May 8, Securing America's Future Energy and the Intelligent Transportation Society of America tweeted that NAS should specifically lead a new round of testing, while Dana Goward, president of the non-profit Resilient Navigation and Timing Foundation, also supported the idea in a May 11 op-ed for C4ISRNET. “Congress must select a technically competent and impartial entity such as the National Academy of Sciences to fill this role. This entity must review the work that has been done and conduct any further analysis needed to inform policy makers,” Goward wrote. “The technologies involved are mature. Testing methodologies are well established. This will not be an onerous task.” Pausing the FCC's decision while launching a review of the testing data would likely require approval from the Commerce committees. House Energy and Commerce Committee ranking member Rep. Greg Walden, R-Ore., suggested further work would be redundant. “We must ensure that this decision maintains our national and economic security, which is why this technology was tested, modified, and tested again, several times before the FCC reached its decision,” Walden said in a statement to C4ISRNET. The Pentagon, thus far, has been reluctant to agree to further technical testing, with Dana Deasy, the department's Chief Information Officers, shooting down the idea in a May 6 call with reporters. However, Defense leaders are now open to an independent review of existing test data, according to Lt. Col. Robert Carver, a department spokesman. He said in a statement the Pentagon would “support an impartial third party, one with demonstrated expertise in GPS testing, conducting a thorough examination of all data collected during the preceding decade of testing. “We emphasize any such examination must be conducted by a party with unquestioned capability, capacity and experience in this arena. We believe a painstaking examination of existing test data will confirm the results of all previous tests, including the limited tests funded by Ligado, that Ligado's proposal will result in interference to GPS even at the one-decibel level,” Carver said. “Any testing, or evaluation of prior testing, must address protection of the GPS service, the frequency band assigned to it, and all receivers intending to use that service." A Ligado spokesperson declined to comment. In the meantime, the department continues to push through the formal process to request the FCC change its mind. That would be a tough path forward for any vote that passed unanimously with five votes, as it would require three members of the commission to change their mind. It may be even more difficult given the comments from Deasy, Inhofe and others indicating the FCC purposefully kept DoD out of the loop as it was making its decision. In a statement after the hearing, an FCC spokesman blasted “all of the untrue statements” made by officials, called claims of unanimous opposition in the government “blatantly false,” and saying assertions that DoD was blindsided are “preposterous.” “The bottom line here is that the FCC made a unanimous, bipartisan decision based on sound engineering principles,” the spokesman said. “We stand by that decision 100% and will not be dissuaded by baseless fearmongering." Joe Gould in Washington contributed to this report https://www.c4isrnet.com/battlefield-tech/2020/05/13/support-growing-for-review-of-ligado-interference-information/

  • AVX, L3 Submit Team Proposal For Future Army ‘Knife Fighter’ Helicopter

    January 2, 2019 | International, Aerospace

    AVX, L3 Submit Team Proposal For Future Army ‘Knife Fighter’ Helicopter

    AVX Aircraft Company and L3 [LLL] have submitted a joint proposal for the Army's Future Attack Reconnaissance Aircraft (FARA) competitive prototype program that seeks a next-generation armed scout helicopter to replace the already retired OH-58D Kiowa Warrior.The... http://www.defensedaily.com/avx-l3-submit-team-proposal-future-army-knife-fighter-helicopter

  • KC-46, P-8 production to stop as Boeing temporarily shuts down facilities

    March 24, 2020 | International, Aerospace

    KC-46, P-8 production to stop as Boeing temporarily shuts down facilities

    By: Valerie Insinna WASHINGTON — Production of the Air Force's KC-46 refueling tanker and the Navy's P-8 maritime surveillance plane will stop as Boeing shuts down all facilities in the Seattle area amid the coronavirus pandemic. “Boeing plans to begin reducing production activity today and projects the suspension of such operations to begin on Wednesday, March 25, at sites across the Puget Sound area,” the company said in a statement on Monday. A Boeing spokesman confirmed that the impacted area includes the facilities in Everett and Renton, where the KC-46 and P-8 are made, respectively. “We plan to temporarily suspend all production operations, including those relating to P-8 and KC-46A, in the Puget Sound region,” the spokesman said. “We're actively engaged with our defense customers to minimize any impacts on their missions. Certain non-production work for all commercial derivative aircraft programs, including for the KC-46 remote vision system enhancements, will continue being done by employees working remotely.” The company is urging employees to telework if they can, but work on classified projects cannot be done on laptops, which could impact more sensitive elements of defense programs. The production stoppage itself is perhaps an even more urgent challenge. Boeing's Puget Sound facilities are best known for commercial airliner production, but the commercial-derivative aircraft it makes for the military —like the KC-46 and P-8 — are built on the same lines. Any pause in commercial production could put Boeing behind in delivering aircraft to the Air Force and Navy. However, Boeing's defense business will likely be able to make a quick recovery as long as the pause in production is not protracted, said Richard Aboulafia, an aerospace analyst with the Teal Group. “P-8, KC-46 and other Boeing defense production in the Puget Sound area is mostly low-volume, like around 1-2 per month,” he said. “So they should be able to recover over the course of the year, assuming the factory deep clean is successful and the pandemic threat turns a corner.” Boeing CEO Dave Calhoun characterized the temporary plant closures as a “necessary step” to protect employees in the wake of a state of emergency in Washington state. "We continue to work closely with public health officials, and we're in contact with our customers, suppliers and other stakeholders who are affected by this temporary suspension,” he said. “We regret the difficulty this will cause them, as well as our employees, but it's vital to maintain health and safety for all those who support our products and services, and to assist in the national effort to combat the spread of COVID-19.” The company will also continue to monitor U.S. government guidance on COVID-19 and conduct a deep cleaning of impacted sites during the two-week pause, Boeing said. https://www.defensenews.com/coronavirus/2020/03/23/kc-46-p-8-production-to-stop-as-boeing-temporarily-shuts-down-production-in-puget-sound-area/

All news