Back to news

May 29, 2020 | International, Aerospace

Triumph Awarded Engine Component MRO Contract For International Chinook Fleet

Berwyn, Pa., May 26, 2020 /PRNewswire/ - Triumph Group, Inc. [NYSE: TGI] announced that Triumph Systems & Support was recently awarded a six-year contract extension for maintenance, repair and overhaul (MRO) services on an international CH-47 Chinook fleet.

Triumph's Systems, Electronics and Controls operating company will provide product repair and overhaul services for the fleet's EMC-32T hydromechanical fuel control, technical support and product investigations as part of the long-term agreement.

The company will deliver the MRO services out of its West Hartford, Connecticut repair station. The site also designs and manufactures the EMC-32T hydromechanical fuel control unit in addition to offering MRO services for the engine component.

"We are honored to be awarded another contract that demonstrates our repair and technical expertise on the Chinook engine fuel control," said Tony Ziotas, President of Triumph Systems & Support – Systems, Electronics and Controls. "Our fuel control products and services are designed to lower cost of ownership and increase time on wing for Chinook operators."

Triumph has provided MRO services for engine components for the 60 Chinook aircraft in the customer's international fleet since 2014. This long-standing support of the platform reinforces the company's commitment to supporting the warfighter's mission both at home and abroad with best-in-class service.

Triumph Systems & Support's Systems, Electronics and Controls (SEC) operating company designs, develops, manufactures and services fuel pumps, fuel metering units and electronic control systems.

They maintain a unique capability for systems integration as well as hydromechanical and electronics in-house development. SEC designs, develops and tests a variety of actuators and thermal systems for use in both military and commercial aerospace applications.

Triumph Group, Inc., headquartered in Berwyn, Pennsylvania, designs, engineers, manufactures, repairs and overhauls a broad portfolio of aerospace and defense systems, components and structures. The company serves the global aviation industry, including original equipment manufacturers and the full spectrum of military and commercial aircraft operators.

More information about Triumph can be found on the company's website at www.triumphgroup.com

CisionView original content: http://www.prnewswire.com/news-releases/triumph-awarded-engine-component-mro-contract-for-international-chinook-fleet-301065649.html

View source version on Triumph Group, Inc.: https://ir.triumphgroup.com/news-events/news-details/2020/Triumph-Awarded-Engine-Component-MRO-Contract-For-International-Chinook-Fleet/default.aspx

On the same subject

  • Lockheed deems first test shot of precision strike missile a success, amid Raytheon delay

    December 11, 2019 | International, Land

    Lockheed deems first test shot of precision strike missile a success, amid Raytheon delay

    By: Jen Judson WASHINGTON — The first test shot of Lockheed Martin's precision strike missile at White Sands Missile Range, New Mexico, was a success, the company said in a statement. “All test objectives were achieved,” the statement read. The PrSM was fired Dec. 10 from a U.S. Army High Mobility Artillery Rocket System launcher and flew roughly 240 kilometers to the target, the release stated. “Today's success validates all of the hard work our PrSM team has put into the design and development of this missile,” said Gaylia Campbell, the company's vice president of precision fires and combat maneuver systems. “This test flight is the most recent success in a long line of product component and sub-component testing successes conducted as part of our proven development discipline to assure total mission success for our U.S. Army customer.” The test objectives, according to Lockheed, included staying on course and maintaining the trajectory, range and accuracy. The first flight tests for PrSM — meant to replace the Army Tactical Missile System — were delayed until the end of this year due to technical issues, the director in charge of Long-Range Precision Fires modernization, Brig. Gen. John Rafferty, said in July. “There were a couple of technical issues that caused us to delay about 90 days for the flight test," he said. "There was a mishap at a facility that caused some of the delay, followed by Mother Nature ... extreme weather that made repair at that facility near impossible for a period of time.” When pressed for specifics, Rafferty said the mishap was not at a Raytheon or Lockheed facility, but rather a sub-vendor used by both teams. Raytheon and Lockheed Martin have been in a head-to-head competition to deliver a future PrSM missile to the Army. While Lockheed was originally intended to test its missile in flight after Raytheon, the latter defense company experienced technical issues, according to sources, and had to push its flight test from November to early next year. The Army has a goal to initially field a new PrSM in 2023; it is one of the major development efforts within the Army's long-range precision fires portfolio. LRPF is the Army's top modernization priority. The service has accelerated PrSM's fielding timeline by several years and will stick to the baseline requirements for the missile to get there. Each company will have subsequent flight tests after the initial shot to help garner further data for development and refinement, leading the Army to choose a winner. The Army also plans to adjust its maximum range requirement following critical test shots of the two PrSMs. The missile's current maximum range requirement is 499 kilometers, which is the range that was compliant under the now-collapsed Intermediate-Range Nuclear Forces Treaty between the United States and Russia. The United States withdrew from the treaty in August, and so the Army no longer has to adhere to the range limit for its missiles. Rafferty said the baseline missile could reach a range of 550 kilometers based on data from both companies competing to build the PrSM. But the Army won't consider adjusting its requirements until each company has observed how their respective missile behaves in real flight tests. https://www.defensenews.com/land/2019/12/10/lockheed-deems-first-test-shot-of-the-precision-strike-missile-a-success-raytheons-is-delayed

  • How to Use Python to Build Secure Blockchain Applications

    June 27, 2024 | International, Security

    How to Use Python to Build Secure Blockchain Applications

    Learn how to build secure blockchain applications in Python with AlgoKit, the comprehensive toolkit for Algorand developers.

  • US Navy asks Congress to shift millions of dollars to fix high-tech supercarrier

    July 19, 2018 | International, Naval

    US Navy asks Congress to shift millions of dollars to fix high-tech supercarrier

    By: David B. Larter WASHINGTON — The U.S. Navy needs to get the permission of lawmakers to move $62.7 million to fix a number of hiccups in its high-tech new carrier, the Gerald R. Ford, during its post-shakedown availability that kicked off July 15. The money, part of a larger DoD reprogramming request from June, will go toward fixing a number of issues that arose during its recently concluded post-delivery trials, according to a copy of the request obtained by Defense News. According to the document, the Navy needs to move: $12.7 million to fix “continuing technical deficiencies” with the Advanced Weapon Elevators. $30 million for “tooling and repair” of the main thrust bearings, issues that the Navy has blamed on the manufacturer. $20 million for additional repairs, a prolonged post-shakedown availabilty, and parts and labor. By: David Larter The Navy told Congress in May that it was going to exceed the Ford's $12.9 billion cost cap because of needed repairs and alterations. The $62.7 million was part of that total repair bill. The repairs and technology setbacks extended the Ford's PSA at Huntington Ingalls' Newport News Shipbuilding from eight months to 12 months, according to a statement from Naval Sea Systems Command, and significantly added to the cost. The ship will then proceed to full-ship shock trials ahead of its first deployment, a priority pushed by Senate Armed Services Committee Chairman Sen. John McCain, R-Ariz., according to the document. Since its delivery, the Ford has spent 81 days at sea during the eight times it was underway, a July 15 NAVSEA release said. “The ship has completed 747 shipboard aircraft launches and recoveries against a plan of approximately 400,” the release said. “CVN 78 successfully completed fixed-wing aircraft/helicopter integration and compatibility testing, air traffic control center certification, JP-5 fuel system certification, daytime underway replenishment capability demonstration, ship's defensive system demonstration, Dual Band Radar testing, and propulsion plant operations.” https://www.defensenews.com/naval/2018/07/18/us-navy-asks-congress-to-shift-millions-to-fix-its-new-high-tech-supercarrier/

All news