Back to news

July 24, 2024 | International, Land

Sweden angles to fill a void in NATO’s space plans

The Swedish government has adopted the country’s first-ever defense and security space strategy, which seeks to make Stockholm a space hub for allies.

https://www.defensenews.com/global/europe/2024/07/24/sweden-angles-to-fill-a-void-in-natos-space-plans/

On the same subject

  • NAVSEA: New Pentagon Strategy Putting Pressure on Private, Public Maintenance Yards to Deliver Ships on Time

    September 20, 2018 | International, Naval

    NAVSEA: New Pentagon Strategy Putting Pressure on Private, Public Maintenance Yards to Deliver Ships on Time

    By: Sam LaGrone VIRGINIA BEACH, Va. — The Pentagon's new focus on high-end warfare with sophisticated adversaries will put increased emphasis and pressure on Navy readiness, and the service's maintenance infrastructure needs to better in fixing ships on time, the head of Naval Sea Systems Command said on Tuesday. Taking cues from Secretary of Defense James Mattis' new National Defense Strategy, all the services are focused on dialing up readiness to meet a higher-level threat, Vice Adm. Tom Moore said during a keynote speech at the American Society of Naval Engineers (ASNE) Fleet Maintenance and Modernization Symposium. “The last year has had the biggest focus on readiness that I have seen in the 37 years I've been in the Navy, and that's on all levels. Navy leadership is talking about readiness every single day, from the [chief of naval operations] on down,” Moore said. “Right now we're not delivering on everything we need delivered, and going forth we really need to deliver, and the pace of change is only going to get faster.” According to Moore, the Navy's public yards are delivering ships on-time about 45 to 50 percent of the time, while private shipyards are getting ships out on time about 35 percent of the time. “It's important to keep in mind that I have 55 ships coming into maintenance availabilities in the private sector in 2019, and in 2018 only 35 percent ships I have in availabilities are expected to move on time,” he said. “Thirty-five percent is just not going to be good enough moving forward to meet the demands that fleet has today.” He indicated that the four public shipyards are improving. “We're starting to see some results. Last year we delivered all four carriers all on time. We stubbed our toe a little bit on Ike,” Moore said referring to the maintenance availability of carrier USS Dwight D. Eisenhower(CVN-69) that has almost doubled in length. Work on nuclear submarines has also lagged in public yards, he said. “All I have to do is look at Ike, Rhode Island and Ohio and Seawolf and some of the ships that are in the yard today to know that's still a challenge for us.” NAVSEA has a plan on the books to retool and refresh its four public yards over the next 20 years and has now turned its attention to the private yards: it needs to contract in a way that promotes more efficient work, and it needs more capacity through more drydocks. “There are people who argue with me that whether we have a capacity challenge or not, but all I do is look that only 35 percent of the ships are delivered on time, and the conclusion I draw is there are not enough people working on ships,” he said. “If we're going to be successful, we have to be able to provide a stable and predictable workload for industry, and we're going to have to be competitive.” NAVSEA is taking yet another look at how it contracts with private shipyards for maintenance, with a plan to modify the Multiple Award Contract/Multi-Order (MAC-MO) contract strategy that was meant to optimize cost for the Navy. “The consensus was, after two years of running with MAC-MO, I think we agree that strategy isn't delivering the results that we need,” Moore said. To improve the process, NAVSEA is working a pilot program that would bundle availabilities on each coast that would allow companies a more predictable set of work. “We'll get bids from industry and we'll be able to lay [our] chips on the table. We'll be able to look at the bids. We'll be able to look at who has capacity and who doesn't. We'll be able to look at, hey, it's important to keep an industrial base, and we'll be able to make decisions that are not solely based on price that will allow us to deliver our ships on time and give you a little more stable and predictive work,” Moore said. “My goal is eventually that we will eventually – on each coast – bundle availabilities six months at a time... so you can know at least what work you can have in the next six months and beyond.” The Navy is set to test the scheme with a three-ship pilot program for repairs of guided-missile destroyers USS Arleigh Burke (DDG-51) and USS Bulkeley (DDG 84) and amphibious warship USS Gunston Hall(LSD-44). With the increase in predictability for bundled MAC-MO contracts, the Navy hopes private industry will invest in infrastructure to handle the planned 355-ship Navy. “The acquisition strategy we have today doesn't incentivize industry to hire and make investments that I think they need to make,” Moore said. “I think that acquisition strategy is the root cause of what I would say was a lack of capacity in the private sector today.” In another bid to expand capacity, the NAVSEA is looking to certify drydocks to Navy standards. Moore said NAVSEA has been in touch with 12 shipyards who mostly don't do work on warships that are interested in having their drydocks certified for use for repair work. Moore said he's also looking to increase private industries ability to work on nuclear submarines. Currently, there are four submarines in repairs at public yards. Overall, Moore stressed the need to improve maintenance is growing as the Pentagon strives to be more dynamic and the service grows. “We're putting strain on the ships, we're putting strain on the men and women out there wearing the uniform that are out there at the tip of the spear, and it's up to us to figure out how to generate the readiness for the force that we have: 287,” he said. “As we go up to 355, if we can't generate the readiness with 287 in terms of delivering ships on time – as you know there's a lot of skepticism that we can do that as we head to 355.” https://news.usni.org/2018/09/19/navsea-new-pentagon-strategy-putting-pressure-private-public-maintenance-yards-deliver-ships-time

  • BAE Systems signs US Army deal for M777 gun structures

    January 4, 2024 | International, Land

    BAE Systems signs US Army deal for M777 gun structures

  • Contract Awards by US Department of Defense - June 20, 2019

    June 21, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    Contract Awards by US Department of Defense - June 20, 2019

    MISSILE DEFENSE AGENCY Coleman Aerospace, a wholly owned subsidiary of Aerojet Rocketdyne, Orlando, Florida, is being awarded a $140,184,433 firm-fixed-price modification (P00114) to a previously awarded contract (HQ0147-14-C-0001). The value of this contract is being increased from $366,376,257 by $140,184,433 to $506,560,690 by exercising this option. Under this modification, the contractor will provide six additional Medium Range Ballistic Missile targets and associated nonrecurring engineering. The work will be performed in Orlando, Florida. The performance period is from June 2019 through December 2027. Fiscal 2019 research, development, test and evaluation funds in the amount of $22,469,742 are being obligated on this award. One offeror was solicited and one offer was received. The Missile Defense Agency, Huntsville, Alabama, is the contracting activity. NAVY BAE Systems Land and Armaments L.P., Sterling Heights, Michigan, is awarded a not-to-exceed $67,000,000 modification for firm-fixed-price, cost-plus-fixed-fee contract line item numbers 8000, 8001, 8002, and 8100 to a previously awarded contract (M67854-16-C-0006), for the development of engineering drawings, manufacture, and test support for three Amphibious Combat Vehicle (ACV) command and control Mission Role Variants (MRVs), and the development of engineering drawings for the ACV medium caliber cannon MRV. The ACV program is managed within the portfolio of Program Executive Officer Land Systems, Quantico, Virginia. Work will be performed in York, Pennsylvania (85 %); and Aiken, South Carolina (15 %), and is expected to be completed by Sept. 30, 2022. Fiscal 2018 research, development, test and evaluation (RDT&E) funds in the amount of $2,500,000; and fiscal 2019 RDT&E funds in the amount of $20,075,743 will be obligated at the time of award, and funding in the amount of $2,500,000 will expire at the end of the current fiscal year. This contract modification was not competitively procured, in accordance with Federal Acquisition Regulation 6.302-1 and 10 U.S. Code § 2304(c)(1). The Marine Corps Systems Command, Quantico, Virginia, is the contracting activity. Leidos Innovations Corp., Gaithersburg, Maryland, is awarded a $29,962,608 cost-plus-incentive-fee, cost-plus-fixed-fee, cost-only modification to previously-awarded contract N00024-16-C-5202 to exercise the options for integrated logistic support, fleet support and life cycle sustainment of the Navy's AN/SQQ-89A(V)15 surface ship Undersea Warfare (USW) Systems. The AN/SQQ-89A(V)15 is the USW combat system, with the capabilities to search, detect, classify, localize and track undersea contacts and to engage and evade submarines, mine-like small objects and torpedo threats. Work will be performed in Norfolk, Virginia (61 %); San Diego, California (18 %); Pascagoula, Mississippi (6 %); Bath, Maine (4 %); Manassas, Virginia (4 %); Yososuka, Japan (2 %); Pearl Harbor, Hawaii (2 %); Everett, Washington (1 %); Mayport, Florida (1 %); and Rota, Spain (1 %), and is expected to be completed by June 2020. Foreign Military Sales; fiscal 2016, 2017, 2018 and 2019 shipbuilding and conversion (Navy); fiscal 2017, 2018 and 2019 other procurement (Navy); and fiscal 2019 operation and maintenance (Navy) funding in the amount of $15,418,688 will be obligated at time of award, and $2,846,455 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. General Electric Co., Lynn, Massachusetts, is awarded $24,891,442 for modification P00020 to a previously awarded firm-fixed-price contract (N00019-17-C-0047) to procure 72 F/A-18 F-414-GE-400 install engines devices for the Navy (24); and the government of Kuwait (48). In addition, this modification provides for two spare and six test F414-GE-400 install engines devices for the government of Kuwait. Work will be performed in Evandale, Ohio, and is expected to be completed in December 2020. Fiscal 2018 aircraft procurement (Navy); and Foreign Military Sales (FMS) funds in the amount of $24,891,442 will be obligated at time of award, none of which will expire at the end of the fiscal year. This modification combines purchases for the Navy ($7,316,280; 31 %); and the government of Kuwait ($17,575,162; 69 %) under the FMS program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Austal USA, Mobile, Alabama, is awarded a $13,197,241 cost-plus-fixed-fee, firm-fixed-price, and cost-only modification to previously awarded contract N00024-17-C-2301 for littoral combat ship class design services and integrated data and product model environment (IDPME) support. Austal USA will provide efforts to support littoral combat ship class ships, including but not limited to technical analyses, non-recurring engineering, configuration management, software maintenance and development, production assessments, and diminishing manufacturing sources and seaframe reliability analysis. Austal USA will also maintain an IDPME that will enable the Navy to access enterprise data management, visualization, program management applications, and network management and control. Work will be performed in Mobile, Alabama (60 %); and Pittsfield, Massachusetts (40 %), and is expected to be complete by June 2025. Fiscal 2016 shipbuilding and conversion (Navy); 2018 other procurement (Navy); and 2019 research, development, test, and evaluation (Navy) funding in the amount of $13,197,241 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Gravois Aluminum Boats LLC, doing business as Metal Shark Boats,* Jeanerette, Louisiana, is awarded a $12,818,790 firm-fixed-price modification to previously awarded indefinite-delivery/indefinite-quantity contract N00024-17-D-2201 to exercise options for the construction of Near Coastal Patrol Vessels in support of U.S. Southern Command partner nations and Foreign Military Sales program. Work will be performed in Jeanerette, Louisiana, and is expected to be complete by August 2021. No funding will be obligated at this time. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Fairmount Automation Inc.,* West Conshohocken, Pennsylvania, is awarded a maximum value $12,439,633 firm-fixed-price, indefinite-delivery/indefinite-quantity, supplies/services contract for the commercial procurement of Fairmount Automation's G4 Design Pad family of controller models and accessories, Windows based configuration software package licenses and engineering services to work with the government design teams to assist in programming and troubleshooting network interfaces. The services under this contract cover system design, software programming, program logistic support, and equipment analysis and repair. Work will be performed in West Conshohocken, Pennsylvania (90 %); and Philadelphia, Pennsylvania (10 %), and is expected to be complete by June 2024. Fiscal 2019 operations and maintenance (Navy) funding in the amount of $261,175 will be obligated at time of award and will expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity (N64498-19-D-4023). SR Technologies Inc., Sunrise, Florida, is awarded a $12,360,400 indefinite-delivery/indefinite-quantity, cost-plus-fixed-fee, firm-fixed-price contract for engineering services, materials, and support for integration and operation of information operations payloads into multiple unmanned aerial vehicles used by the U.S. Special Operations Command and Navy. This two-year contract includes one three-year option which, if exercised, would bring the potential value of this contract to an estimated $23,433,021. All work will be performed in Sunrise, Florida. The period of performance of the base period is from June 20, 2019, through June 19, 2021. If the option is exercised, the period of performance would extend through June 19, 2024. No funds will be obligated at the time of award. Funds will be obligated as task orders are issued using operations and maintenance (Navy); other procurement (Navy); and research, development, test and evaluation (Navy). This sole-source procurement is issued using other than full and open competition in accordance with 10 U.S. Code 2304(c)(1), as implemented by Federal Acquisition Regulation 6.302-1. The Naval Information Warfare Center Pacific, San Diego, California, is the contracting activity (N66001-19-D-3404). Bell Boeing Joint Project Office, Amarillo, Texas, is awarded not-to-exceed $7,458,000 for modification P00005 to a delivery order N0001918F0016 previously issued against basic ordering agreement N00019-17-G-0002. This modification provides for non-recurring engineering to facilitate additional structural improvements, tooling assessment, and test aircraft retrofit tooling in support of theV-22 Nacelle Improvement effort. Work will be performed in Fort Worth, Texas (84 %); Ridley Park, Pennsylvania (5 %); Patuxent River, Maryland (4 %); Fort Walton Beach, Florida (4 %); and Amarillo, Texas (3 %), and is expected to be completed in August 2020. Fiscal 2019 aircraft procurement (Navy) funds in the amount of $1,923,688 will be obligated at time of award, none of which will expire at the end of the fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. DEFENSE INFORMATION SYSTEMS AGENCY DRS Global Enterprise Solutions Inc., Dulles, Virginia, was awarded a firm-fixed-price task order to support the Army's Wideband Enterprise Satellite Systems Commercial Satellite Communications (COMSATCOM) Network. The face value of this action is $23,756,299 funded by fiscal 2019 operations and maintenance funds. The total cumulative face value of the task order is $127,496,857. Proposals were solicited via the General Services Administration's Complex Commercial SATCOM Solutions (CS3) multiple award, indefinite-delivery/indefinite-quantity contracts, and two proposals were received from the 20 proposals solicited. Performance will be at the contractor's facility in Dulles, Virginia. The period of performance is June 24, 2019, to June 23, 2020, with four one-year options. The Defense Information Technology Contracting Organization, Scott Air Force Base, Illinois, is the contracting activity. (GS00Q17NRD4006 / HC101319F0092). DEFENSE LOGISTICS AGENCY Oshkosh Defense LLC, Oshkosh, Wisconsin, has been awarded a maximum $10,200,705 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for vehicular axle assemblies. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five-year contract with no option periods. Location of performance is Wisconsin, with a June 20, 2024, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2024 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-19-D-0129). ARMY Longbow LLC, Orlando, Florida, was awarded a $9,267,724 modification (P00087) to contract W31P4Q16-C-0035 for Laser and Longbow Hellfire engineering services. Work will be performed in Orlando, Florida, with an estimated completion date of June 19, 2020. Fiscal 2017 and 2018 missile procurement, Air Force funds in the amount of $9,267,724 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. *Small business

All news