Back to news

February 1, 2021 | International, Aerospace

Spirit selected to lead MOSQUITO uncrewed fighter development

Thursday, 28 January 2021

Autonomous ‘loyal wingman' aircraft create the opportunity to expand, diversify and rapidly upgrade combat Air Forces in a cost-effective way - so the UK has committed funding for a new prototype.

The UK's first fleet of uncrewed fighter aircraft is one step closer to reality following a £30-million contract to design and manufacture a prototype in a three-year deal supporting more than 100 jobs in Belfast.

The uncrewed combat aircraft will be designed to fly at high-speed alongside fighter jets, armed with missiles, surveillance and electronic warfare technology to provide a battle-winning advantage over hostile forces. Known as a ‘loyal wingman', these aircraft will be the UK's first uncrewed platforms able to target and shoot down enemy aircraft and survive against surface to air missiles.

In a boost for Northern Ireland's defence industry, Spirit AeroSystems, Belfast, has been selected to lead Team MOSQUITO in the next phase of the project. Using ground-breaking engineering techniques, the team will further develop the RAF's Lightweight Affordable Novel Combat Aircraft (LANCA) concept, with a full-scale vehicle flight-test programme expected by the end of 2023.

Northern Ireland Secretary, Brandon Lewis says: "This is fantastic news and underlines the distinct strengths in Northern Ireland's economy, through its advanced engineering and manufacturing capabilities. This ground-breaking project will involve significant investment which will not only support local employment, but also reinforce Northern Ireland's contribution to the security of our nation."

Team MOSQUITO, which also includes Northrop Grumman UK, will mature the designs and manufacture a technology demonstrator to generate evidence for a follow-on LANCA programme. If successful, Project Mosquito's findings could lead to this revolutionary capability being deployed alongside the Typhoon and F-35 Lightning jets by the end of the decade.

Defence Minister, Jeremy Quin said: "This is a great win for the Northern Ireland defence industry and will showcase some of the most pioneering engineering work currently being undertaken in the UK. The £30 million project will accelerate the development of the UK's future air power by delivering cutting-edge uncrewed aircraft, maintaining our position as a world leader in emerging technologies."

Working with innovative partners from across the UK, Project Mosquito is transforming traditional approaches to combat air to enable the rapid development of technology. By utilising the latest software development techniques and civilian aerospace engineering and manufacturing expertise, the project will deliver dramatic reductions in costs and development timelines, so their innovations can reach the front-line quicker than ever before.

This game changing research and development project will ensure the final aircraft design will be capable of being easily and affordably updated with the latest technology so we remain one step ahead of our adversaries. The aircraft's flexibility will provide the optimum protection, survivability and information as it flies alongside Typhoon, F-35 Lightning, and later, Tempest as part of our future combat air system.

Air Chief Marshal Mike Wigston, Chief of the Air Staff says: "We're taking a revolutionary approach, looking at a game-changing mix of swarming drones and uncrewed fighter aircraft like Mosquito, alongside piloted fighters like Tempest, that will transform the combat battlespace in a way not seen since the advent of the jet age."

Director Future Combat Air, Richard Berthon adds: "Project Mosquito is a vital element of our approach to Future Combat Air, rapidly bringing to life design, build and test skills for next generation combat air capabilities. Autonomous ‘loyal wingman' aircraft create the opportunity to expand, diversify and rapidly upgrade Combat Air Forces in a cost-effective way, now and in the future."

As announced by the Prime Minister in November 2020, the UK's Future Combat Air System (FCAS) programme is set to benefit from a portion of the extra £1.5 billion investment into military research and development, which will help ensure our Armed Forces are prepared to meet the threats of tomorrow.

LANCA originated in 2015 in Dstl to understand innovative Combat Air technologies and concepts that offer radical reductions in cost and development time and is a RAF Rapid Capabilities Office led project under the Future Combat Air System Technology Initiative (FCAS TI). The UK MOD's Defence Science and Technology Laboratory (Dstl) provides the project management and is the MOD's technical authority for LANCA and Project Mosquito on behalf of the RCO.

https://www.airframer.com/news_story.html?report=20244

On the same subject

  • Want Siri or Alexa ready for tactical ops? This Army command is working on it.

    July 27, 2018 | International, C4ISR

    Want Siri or Alexa ready for tactical ops? This Army command is working on it.

    By: Todd South ABERDEEN PROVING GROUND, Md. — As the Army improves its mission command posts, one of the key areas where it has made changes is how soldiers can operate computers for everything from sharing information to tracking friendly and not-so-friendly forces. Staff at the Army's Research Development Engineering Command have upgraded items from tablet-style computers, display systems and ways to use voice commands rather than keyboards for controlling devices. During a recent display at Aberdeen Proving Ground, Maryland, soldiers who work as trainer/observers at the National Training Center at Fort Irwin, California, gave demonstrations of the new capabilities for the Tactical Computing Environment. Sgts. 1st Class Sheena Ferrell and Ramon Contreras Jr. showed how soldiers using the new devices can share “one common operating picture” with each other. Users can track individual vehicles on the wide-ranging training area, mark obstacles, terrain features, enemy positions and other items with preprogrammed symbols and use a chat feature to send messages or attachments to other soldiers. Alongside those efforts is another piece of software that gives soldiers a Siri or Alexa-type voice command capability, but contained to the device, rather than relying on the computing cloud or an Internet connection. The program, Single Multimodal Android Service for Human Computer Interaction, or SMASH, has been a part of the larger effort to improve Expeditionary Mission Command across the Army. Users can simply speak commands such as “Show Blue Force layers,” or “big picture,” to have icons or elements appear or disappear on the digital map. Another quick-use feature is to mark specific incidents for later use in after action reports. The demonstrator gave the example of selecting a shorthand for marking a spot for a roadside bomb, speaking the words “French fries,” and the device immediately marked and alerted the map, which would also be relayed to those sharing the same features. Some lower tech but important additions are portable, roll-up displays, and software called Display Viewer Application that replaces a massive hardware device used to share computer screen displays across a closed, Local Area Network within the command post. https://www.armytimes.com/news/your-army/2018/07/26/want-siri-or-alexa-ready-for-tactical-ops-this-army-command-is-working-on-it

  • The Air Force’s KC-46 tanker has another serious technical deficiency, and Boeing is stuck paying for it

    April 1, 2020 | International, Aerospace

    The Air Force’s KC-46 tanker has another serious technical deficiency, and Boeing is stuck paying for it

    By: Valerie Insinna WASHINGTON — The Air Force on Monday logged another critical technical flaw for the KC-46 tanker, this time revolving around excessive fuel leaks. Under its contract with the service, KC-46 manufacturer Boeing is responsible for paying for a fix to the problem, Air Force spokeswoman Capt. Cara Bousie said in a statement. “The Air Force and Boeing are working together to determine the root cause and implement corrective actions,” she said. “The KC-46 program office continues to monitor the entire KC-46 fleet and is enhancing acceptance testing of the fuel system to identify potential leaks at the factory where they can be repaired prior to delivery.” The problem was first discovered in July 2019, but the Air Force did not say why the issue had been escalated to Category 1 status — the designation given to problems with a significant impact on operations or safety. The service also did not immediately comment on questions about what sort of receiver aircraft were most involved with the deficiency or the severity of the problem. A Boeing spokesman said that the Air Force had discovered 16 aircraft in need of repair, and that seven have already been fixed. “The KC-46 fuel system is equipped with redundant protection for fuel containment. In some cases with this issue, aircraft maintenance crews are finding fuel between the primary and secondary fuel protection barriers within the system,” the company said in a statement. Boeing is working with “utmost urgency” to address the problem and implement a fix to the remaining aircraft, the statement said. A Boeing spokesman added it would take about 10 days to retrofit each aircraft at the rapid response depot facility in San Antonio, Texas. The fix was also being incorporated into production line in Everett, Wash., which is currently undergoing a temporary suspension due to COVID-19. The latest Category 1 deficiency brings the total up to four: The tanker's remote vision system or RVS — the camera system that allows KC-46 boom operators to steer the boom into a receiver aircraft without having to look out a window and use visual cues — provides imagery in certain lighting conditions that appears warped or misleading. Boeing has agreed to pay for potentially extensive hardware and software fixes, but the Air Force believes it will system won't be fully functional until 2023-2024. The Air Force has recorded instances of the boom scraping against the airframe of receiver aircraft. Boeing and the Air Force believe this problem is a symptom of the RVS's acuity problems and will be eliminated once the camera system is fixed. Boeing must redesign the boom to accommodate the A-10, which currently does not generate the thrust necessary to push into the boom for refueling. This problem is a requirements change by the Air Force, which approved Boeing's design in 2016. Last year, Boeing received a $55.5 million contract to begin work on the new boom actuator. Boeing's fixed-priced firm contract for the development of the KC-46 has a $4.9 billion ceiling that leaves the company responsible for any expenses billed in excess of that amount. So far, the company has paid more than $3.5 billion of its own money to fund corrections to ongoing technical issues. https://www.defensenews.com/air/2020/03/31/the-air-forces-kc-46-tanker-has-another-serious-technical-deficiency-and-boeing-is-stuck-paying-for-it/

  • Space Force’s Resilient GPS program draws skepticism from lawmakers

    June 12, 2024 | International, Aerospace

    Space Force’s Resilient GPS program draws skepticism from lawmakers

    Lawmakers say the Space Force's plan to use proliferation to boost GPS resiliency may be flawed.

All news