Back to news

September 29, 2021 | International, Aerospace, C4ISR

Space Force to share internal digital models with industry

Since announcing their desire to build the world's first fully digital service, Space Force officials are fleshing out how that will impact everything from force design to requirements to engineering.

https://www.c4isrnet.com/digital-show-dailies/air-force-association/2021/09/23/space-force-to-share-internal-digital-models-with-industry/

On the same subject

  • Patchwork Hackers Target Bhutan with Advanced Brute Ratel C4 Tool

    July 24, 2024 | International, C4ISR, Security

    Patchwork Hackers Target Bhutan with Advanced Brute Ratel C4 Tool

    Patchwork hackers target Bhutan with Brute Ratel C4 and PGoShell. New tactics include impersonation and red teaming software in sophisticated cyber es

  • New and old aircraft programs could get axed as top US Air Force general seeks ‘ruthless prioritization’ of capabilities

    September 1, 2020 | International, Aerospace

    New and old aircraft programs could get axed as top US Air Force general seeks ‘ruthless prioritization’ of capabilities

    By: Valerie Insinna WASHINGTON — With stagnant budgets on the horizon, the U.S. Air Force is hurtling toward “the most difficult force structure decisions in generations” and must cancel programs and sacrifice some of its existing aircraft inventory to prepare for a potential fight against Russia or China, the service's top general said Monday. A future war with either country could entail combat losses on par with those of a major conflict like World War II, Air Force Chief of Staff Gen. Charles “CQ” Brown wrote in a paper titled “Accelerate Change or Lose,” which outlines his vision as the service's new top uniformed leader. Brown became chief of staff of the Air Force on Aug. 6. Although the Defense Department has focused on war with an advanced, near-peer nation since 2016, Brown raised concerns that the Air Force's sense of urgency is not strong enough and warned of potential mission failure unless the service accelerates the pace of change. A “ruthless prioritization” of the service's requirements is in order, he said. “We must reframe platform-centric debates to focus instead on capabilities to execute the mission relative to our adversaries,” he wrote. “Programs that once held promise, but are no longer affordable or will not deliver needed capabilities on competition-relevant timelines, must be divested or terminated. Cost, schedule, and performance metrics alone are no longer sufficient metrics of acquisition success.” The Air Force must be responsive to the actions of its adversaries, pivoting when necessary to stay ahead and creating technologies that can be cost-effectively operated and maintained, Brown added. “Capabilities must be conceived, developed, and fielded inside competitors' fielding timelines — knowing we will need to adapt and adjust over time. Innovative ideas from our Airmen need viable sustainment pathways. If we are to beat our competitors in conflict, we must also beat them in development and fielding of capability,” he said. It's unclear what existing capabilities could be on the chopping block, but more details on the Air Force's path forward are expected. During a Aug. 31 roundtable, Brown told reporters that the service is working on action orders associated with his strategic vision that will be unveiled at the Air Force Association's conference during the week of Sept. 14. Brown's call for rapid change could pave the way for another bloody budget rollout when the Air Force's plan for fiscal 2022 is revealed next year. During its FY21 budget deliberations, service leaders alluded to “controversial changes” such as fleetwide divestments, but ultimately the Air Force proposed retiring handfuls of older platforms rather than entire aircraft types. Congress has attempted to curtail some of those changes, putting strict limits on the amount of tankers and bombers permitted to be retired each year. Brown acknowledged that if he's to make radical changes to force structure, he will need to have tough conversations with other Air Force and Pentagon leaders, Congress, and industry to determine where risk can be taken. “When we work in various silos, we're all trying to make our particular program or platform as capable as we can be. But we can't afford all of those,” he said. The difficulty is getting “the right set of full programs” and not “a number of broken programs” that “balance the checkbook at the expense of our capability.” Brown's priorities for the Air Force extend beyond changes to existing force structure and modernization plans. Like his predecessor, Gen. Dave Goldfein, Brown stressed the importance of the military's Joint All-Domain Command and Control concept, as well as increased interoperability and data sharing with allies. Brown also hinted that a restructure of the Air Force could be forthcoming, and that the creation of the Space Force provides an opportunity to review the roles and missions of his service. “Sometimes the model we use in the deployed environment is different than the model we use at home,” he said. “You want to train like you're going to fight. From that aspect, we've got to take a look at ourselves.” https://www.defensenews.com/air/2020/08/31/new-and-old-aircraft-programs-could-get-the-ax-as-top-us-air-force-general-calls-for-a-ruthless-prioritization-of-its-capabilities/

  • Contract Awards by US Department of Defense - May 6, 2019

    May 7, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    Contract Awards by US Department of Defense - May 6, 2019

    AIR FORCE Vital Link Inc., Sealy, Texas, has been awarded a $228,843,057 indefinite-delivery requirements contract for the sustainment of Air Force noise suppressors. This contract provides for the repair, refurbishment and relocation of noise suppressors. Work will be performed at Air Force locations worldwide, and is expected to be complete by Nov. 5, 2029. This award is the result of a competitive acquisition and one offer was received. No funds are being obligated at the time of award. Air Force Life Cycle Management Center, Robins Air Force Base, Georgia, is the contracting activity (FA8534-19-D-0003). The Boeing Co., St. Louis, Missouri, has been awarded a not-to-exceed $35,800,000 delivery order for Radar Modernization Program (RMP) Common Configuration General Purpose Processors (GPP3) and Waveform Generators (WFG). This contract provides for 57 GPP3s and 11 WFGs to ensure a common configuration of the APG-82(v)1 radar, as well as 14 spares. Work will be performed in St. Louis, Missouri, and is expected to be complete by Oct. 31, 2023. This award is the result of a sole-source acquisition. Fiscal 2019 procurement funds in the amount of $17,686,000 are being obligated at the time of award. Air Force Life Cycle Management Center, Fighter/Bomber Directorate, F-15 Division, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8634-19-F-0009). Metis Solutions LLC, Arlington, Virginia, has been awarded a $10,301,762 fixed-price level-of-effort contract for financial services. This contract provides for counter-threat finance services to U.S. Central Command, U.S. Africa Command, and the U.S. European Command areas of responsibility. Work will be performed in several locations worldwide, and is expected to be complete by Oct. 20, 2019. This award is the result of a non‐competitive bridge acquisition and one offer was received. Fiscal 2019 operations and maintenance funds in the full amount are being obligated at the time of award. Headquarters Air Combat Command, Acquisition Management and Integration Center, Joint Base Langley‐Eustis, Virginia, is the contracting activity (FA4890‐19‐C-A007). (Awarded March 20, 2019) CORRECTION: The contract announced on May 2, 2019, for Engility Corp., Andover, Massachusetts (FA8650-19-C-6024), for research and development, included an incorrect award amount. The correct award amount is $57,296,527. DEFENSE LOGISTICS AGENCY Shore Terminals LLC, doing business as NuStar, San Antonio, Texas, has been awarded a $227,733,110 firm-fixed-price contract to receive, store and ship various types of jet fuel. This was a competitive acquisition with one offer received. This is a four-year base contract with one five-year option period. Locations of performance are Texas and California, with a May 6, 2023, performance competition date. Using customers are Navy and Air Force. Type of appropriation is fiscal 2019 through 2023 defense working capital funds. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia (SPE603-19-C-5006). Point Blank Enterprises, Pompano Beach, Florida, has been awarded a maximum $92,881,740 firm-fixed-price, indefinite-quantity contract for enhanced small arms protective inserts. This contract was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with no option periods. Location of performance is Florida, with a March 31, 2021, performance completion date. Using military services are Army, Air Force, Navy and Marine Corps. Type of appropriation is fiscal 2019 through 2020 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-19-D-1154). CORRECTION: The contract announced on May 2, 2019, for Raytheon Co., McKinney, Texas, was announced with an incorrect delivery order number and incorrect basic ordering agreement number. The correct delivery order number is SPRPA1-19-F-CB01 and correct basic ordering agreement number is SPRPA1-19-G-CB01. ARMY Eagle Eye - Enviroworks JV,* Anchorage, Alaska (W9128F-19-D-0034); Ahtna-CDM JV,* Irvine, California (W9128F-19-D-0035); IE- Weston Federal Services JVB LLC,* Pasco, Washington (W9128F-19-D-0036); and Relyant Global LLC,* Maryville, Tennessee (W9128F-19-D-0037), will compete for each order of the $95,000,000 firm-fixed-price contract for rapid disaster infrastructure response. Bids were solicited via the internet with 19 received. Work locations and funding will be determined with each order, with an estimated completion date of May 5, 2024. U.S. Army Corps of Engineers, Omaha, Nebraska, is the contracting activity. Cray Inc., Seattle, Washington, was awarded a $22,549,000 firm-fixed-price contract for Department of Defense High Performance Computing Modernization Program's Technology Insertion. Four bids were solicited with four bids received. Work will be performed in Aberdeen Proving Ground, Maryland, with an estimated completion date of Nov. 5, 2025. Fiscal 2018 other procurement, Army funds in the amount of $22,549,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Huntsville, Alabama, is the contracting activity (W912DY-19-F-0296). Cray Inc., Seattle, Washington, was awarded a $14,549,000 firm-fixed-price contract for Department of Defense High Performance Computing Modernization Program's Technology Insertion. Four bids were solicited with two bids received. Work will be performed in Vicksburg, Mississippi, with an estimated completion date of Nov. 5, 2025. Fiscal 2018 other procurement, Army funds in the amount of $14,549,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Huntsville, Alabama, is the contracting activity (W912DY-19-F-0298). AAI Corp., doing business as Textron Systems, Hunt Valley, Maryland, was awarded an $8,928,378 cost-plus-fixed-fee Foreign Military Sales (Australia) contract for logistics support. Bids were solicited via the internet with two received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 7, 2020. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-19-F-0407). U.S. SPECIAL OPERATIONS COMMAND n~Ask Inc., Fairfax, Virginia, was awarded a $7,816,490 cost-plus-fixed-fee contract (H92401-19-C-0014) for demonstration of a prototype, modular intelligence, surveillance and reconnaissance small-satellite in support of U.S. Special Operations Command (USSOCOM). Fiscal 2019 research and development funds in the amount of $2,000,000 were obligated at time of award. The work will be performed primarily at the n~Ask Colorado facility. The period of performance is scheduled to run through September 2020. USSOCOM headquarters, Tampa, Florida, is the contracting activity. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1838303/source/GovDelivery/

All news