Back to news

April 25, 2023 | International, Aerospace

Romania awards $321 million contract for Turkish TB2 combat drones

The announcement follows Bucharest's stated intention last year to buy 18 drones to be operated by the country's land forces.

https://www.c4isrnet.com/global/europe/2023/04/25/romania-awards-321-million-contract-for-turkish-tb2-combat-drones/

On the same subject

  • Bradley Replacement: Did Army Ask For ‘Unobtainium’?

    January 24, 2020 | International, Land

    Bradley Replacement: Did Army Ask For ‘Unobtainium’?

    By SYDNEY J. FREEDBERG JR. WASHINGTON: For the third time in 11 years, the Army's attempt to replace the 1980s-vintage M2 Bradley ran afoul of the age-old tradeoff between armor and mobility, several knowledgeable sources tell Breaking Defense. The General Dynamics prototype for the Optionally Manned Fighting Vehicle – the only competitor left after other companies bowed out or were disqualified – was too heavy to meet the Army's requirement that a single Air Force C-17 cargo jet could carry two complete OMFVs to a war zone, we're told. But the vehicle had to be that heavy, GD's defenders say, to meet the Army's requirement for armor protection. Now, the Army hasn't officially said why it cancelled the current OMFV contract. Senior leaders – Chief of Staff, Gen. James McConville; the four-star chief of Army Futures Command, Gen. Mike Murray; and the civilian Army Acquisition Executive, Assistant Secretary Bruce Jette – have all publicly acknowledged that the requirements and timeline were “aggressive.” (Yes, all three men used the same word). Jette was the most specific, telling reporters that one vendor – which, from the context of his remark, could only be GD – did not meet all the requirements, but he wouldn't say which requirements weren't met. So, while we generally avoid writing a story based solely on anonymous sources, in this case we decided their track records (which we can't tell you about) were so good and the subject was so important that it was worth going ahead. “Industry told the Army the schedule was ‘unobtainium,' but they elected to proceed anyway,” one source told us: That's why the other potential competitors dropped out, seeing the requirements as too hard to meet. In particular, the source said, “industry needs more time to evaluate the trade [offs] associated with achieving the weight requirement.” With more time, industry might have been able to refine the design further to reduce weight, redesign major components to be lighter, or possibly – and this one is a stretch – even invent new stronger, lighter materials. But on the schedule the Army demanded, another source told us, reaching the minimum allowable protection without exceeding the maximum allowable weight was physically impossible. Why This Keeps Happening The Army's been down this road before and stalled out in similar ways. The Ground Combat Vehicle was too heavy, the Future Combat Systems vehicles were too light; “just right” still seems elusive. In 2009, Defense Secretary Bob Gates cancelled the Future Combat Systems program, whose BAE-designed Manned Ground Vehicles – including a Bradley replacement – had been designed to such strict weight limits that they lacked adequate armor. The Army had initially asked for the FCS vehicles to come in under 20 tons so one could fit aboard an Air Force C-130 turboprop transport. After that figure proved unfeasible, and the Air Force pointed out a C-130 couldn't actually carry 20 tons any tactically useful distance, the weight crept up to 26 tons, but the added armor wasn't enough to satisfy Gates' concerns about roadside bombs, then taking a devastating toll on US soldiers in Iraq. Four years later, amidst tightening budgets, the Army itself gave up on the Ground Combat Vehicle, another Bradley replacement, after strict requirements for armor protection drove both competing designs – from General Dynamics and BAE Systems – into the 56-70 ton range, depending on the level of modular add-on armor bolted onto the basic chassis. (A much-publicized Governmental Accountability Office study claimed GCV could reach 84 tons, but that was a projection for future growth, not an actual design). Not quite nine months ago, after getting initial feedback from industry on the Optionally Manned Fighting Vehicle, the Army made the tough call to reduce its protection requirements somewhat to make it possible to fit two OMFVs on a C-17. If our sources are correct, however, it didn't reduce the armor requirement enough for General Dynamics to achieve the weight goal. One source says that two of the General Dynamics vehicles would fit on a C-17 if you removed its modular armor. The add-on armor kit could then be shipped to the war zone on a separate flight and installed, or simply left off if intelligence was sure the enemy lacked heavy weapons. But the requirements didn't allow for that compromise, and the Army wasn't willing to waive them, the source said, because officers feared a vehicle in the less-armored configuration could get troops killed. Other Options Now, there are ways to protect a vehicle besides heavy passive armor. Some IEDs in Iraq were big enough to cripple a 70-ton M1 Abrams. Russian tanks get by with much lighter passive armor covered by a layer of so-called reactive armor, which explodes outwards when hit, blasting incoming warheads before they can penetrate. Both Russia and Israel have fielded, and the US Army is urgently acquiring, Active Protection Systems that shoot down incoming projectiles. The problem with both reactive armor and active protection is that they're only proven effective against explosive warheads, like those found on anti-tank missiles. They're much less useful against solid shells, and while no missile ever fielded can use those, a tank's main gun can fling solid shot with such force that it penetrates armor through sheer concentrated kinetic energy. (Protecting against roadside bombs and land mines is yet another design issue, because they explode from underneath, but it's no longer the all-consuming question it once ways. Advances in suspension, blast-deflecting hull shapes, and shock absorption for the crew have made even the four-wheeled Joint Light Tactical Vehicle remarkably IED-resistant and pretty comfortable). If the Army were willing to take the risk of relying more on active protection systems, or give industry more time to improve active protection technology, it could reduce its requirements for heavy passive armor. Or the Army could remove the soldiers from its combat vehicles entirely and operate them with a mix of automation and remote control, which would make crew protection a moot point. In fact, the service is investing in lightly-armored and relatively expendable Robotic Combat Vehicles – but it still sees those unmanned machines as adjuncts to humans, not replacements. As long as the Army puts soldiers on the battlefield, it will want the vehicles that carry them to be well-protected. Alternatively, the Army could drop its air transport requirements and accept a much heavier vehicle. Israel has already done this with its Namer troop carrier, a modified Merkava heavy tank, but then the Israel army doesn't plan to fight anywhere far away. The US, by contrast, routinely intervenes overseas and has dismantled many of its Cold War bases around the world. Air transport is a limited commodity anyway, and war plans assume most heavy equipment will either arrive by sea or be pre-positioned in warehouses on allied territory. But the Army really wants to have the option to send at least some armored vehicles by air in a crisis. If the Army won't give ground on either protection or transportability, then it faces a different dilemma: They need to either give industry more time to invent something revolutionary, or accept a merely evolutionary improvement. “We're going to reset the requirements, we're going to reset the acquisition strategy and timeline,” Gen. McConville said about OMFV on Tuesday. But, when he discussed Army modernization overall, he repeatedly emphasized that “we need transformational change, not incremental improvements. “Transformational change is how we get overmatch and how we get dominance in the future,” the Chief of Staff said. “We aren't looking for longer cords for our phones or faster horses for our cavalry.” https://breakingdefense.com/2020/01/bradley-replacement-did-army-ask-for-unobtainium

  • Bridging the FLIT gap - Skies Mag

    February 14, 2024 | International, Aerospace

    Bridging the FLIT gap - Skies Mag

    With the current contracted fighter lead-in training program coming to an end in March 2024, and its replacement not expected to be ready until after 2030, the Air Force is turning to allies to help prepare its future fighter pilots.

  • Contract Awards by US Department of Defense - June 25, 2019

    June 26, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    Contract Awards by US Department of Defense - June 25, 2019

    ARMY Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $91,291,064 hybrid (cost-plus-fixed-fee and firm-fixed-price) contract to provide engineering and other support services for all versions of the H-60 Blackhawk. One bid was solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of June 27, 2024. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-19-D-0079). DynCorp International LLC, Fort Worth, Texas, was awarded a $12,337,211 modification (P00034) to contract W58RGZ-17-C-0011 for modification of five C-12R aircraft to a C-12V. Work will be performed in Fort Worth, Texas, with an estimated completion date of May 31, 2023. Fiscal 2019 aircraft procurement, Army funds in the amount of $12,337,211 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. MCR Federal LLC,* McLean, Virginia, was awarded an $8,135,050 modification (0001 20) to contract W31P4Q-16-A-0016 for technical engineering support services. Work will be performed in Redstone Arsenal, Alabama, with an estimated completion date of June 29, 2020. Fiscal 2019 foreign military sales admin and other procurement, Army funds in the amount of $8,135,050 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. NAVY Leidos Inc., Reston, Virginia, is awarded a $62,975,474 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract for engineering and technical services to meet fleet requirements for Synthetic Signature Generation based training systems. This contract will provide scientific, engineering, and technical services required for the design, development, fabrication, integration, test, fleet implementation and maintenance. Work will be performed in Bethesda, Maryland, and is expected to be complete by December 2022. Fiscal 2019 other procurement (Navy), fiscal 2017 shipbuilding and conversion (Navy), and fiscal 2019 research, development, test and evaluation (Navy) funding in the amount of $10,762,779 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with one offer received. The Naval Surface Warfare Center, Carderock Division, West Bethesda, Maryland, is the contracting activity (N00167-19-D-0004). L3 Systems Co., Camden, New Jersey, is awarded an estimated $41,518,454 indefinite-delivery/indefinite-quantity, firm-fixed-price, cost-plus fixed-fee contract. The Battle Force Tactical Network program requires the procurement and integration of commercial, off-the-shelf (COTS) high frequency internet protocol and subnet relay hardware, COTS software and government off-the-shelf software into a specified configuration for the Program Executive Office Command, Control, Communications, Computers and Intelligence. This contract has a five-year ordering period up to the contract award amount. There are no options. Work will be performed in Camden, New Jersey, and work is expected to be completed by June 2024. No funding is being placed on contract and obligated at the time of award. Contract actions will be issued and funds obligated as individual delivery orders. This contract was competitively procured as a full and open competition with proposals solicited via the Federal Business Opportunities website, with three offers received. The Naval Information Warfare Systems Command, San Diego, California, is the contracting activity (N00039-19-D-0035). Wyle Laboratories Inc. (aka, KBRwyle), Huntsville, Alabama, is awarded a $41,081,160 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract to provide engineering, technical, operational, test and logistics services in support of the Naval Air Warfare Center Aircraft Division's (NAWCAD's) Surface/Aviation Interoperability Laboratory. In addition, this contract provides for facilities testing and laboratory equipment, installed avionics and ship-combat systems maintenance. Work will be performed at NAWCAD, Patuxent River, Maryland, and is expected to be completed in July 2024. No funds will be obligated at time of award; funds will be obligated on individual orders as they are issued. This contract was competitively procured via an electronic request for proposals; four offers were received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-19-D-0070). Gilbane Federal, Concord, California, is awarded a $31,683,336 firm-fixed-price contract for unaccompanied enlisted housing at the Naval Base Guam. Buildings 5, 6, 18 and 20, will undergo conversion and alteration of each structure to house double-occupancy, permanent-party housing units and building common areas including multipurpose spaces, shared kitchens, vending areas, shared laundries and other miscellaneous support spaces. This project will also include the full renovation of the second floor existing double-occupancy permanent-party housing units in Building 18. The contract also contains one unexercised option, which if exercised, would increase cumulative contract value to $32,966,436. Work will be performed in Joint Region Marianas, Guam, and is expected to be completed by October 2022. Fiscal 2019 military construction (Navy) contract funds in the amount of $31,683,336 are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website, with four proposals received. The Naval Facilities Engineering Command, Pacific, Joint Base Pearl Harbor-Hickam, Hawaii, is the contracting activity (N62742-19-C-1310). BAE Systems Land & Armaments L.P., Louisville, Kentucky, is awarded $14,134,492 for a firm-fixed-price, cost-plus-fixed-fee modification to previously awarded contract N00174-19-C-0004 for one overhauled/upgraded MK45 Mod 4 gun mount, and their associated components. The 5-inch MK 45 light weight gun mount system provides an effective weapon for anti-surface, naval surface fire support, and anti-air warfare missions, and is installed aboard DDG- 51 and CG-47 class ships. This contract is to provide all necessary material and services required to overhaul and upgrade MK 45 gun mounts to support AEGIS Modernization and Arleigh Burke new construction requirements. Work will be performed in Louisville, Kentucky, and is expected to be complete by October 2023. Fiscal 2019 shipbuilding and conversion (Navy) funding in the amount of $14,134,492 will be obligated at time of award and not expire at the end of the current fiscal year. The Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division, Indian Head, Maryland, is the contracting activity. AIR FORCE Innovative Technologies International Inc., Lynchburg, Virginia, has been awarded a $7,000,000 indefinite-delivery/indefinite-quantity contract for Katana Hardware Fabrication effort. The contract provides for concept design analysis and advanced fabrication capabilities to rapidly manufacture products meeting specific characteristics through a partnering arrangement by fulfilling research, development, test and evaluation requirements for Eglin Air Force Base, Florida, with organization-specific tasks. Work will be performed at Lynchburg, Virginia, and is expected to be completed by June 25, 2024. This contract is the result of a sole source award. Fiscal 2018 research and development funds in the amount of $24,897.00 are being obligated at the time of award. The Air Force Research Laboratory, Eglin Air Force Base, Florida, is the contracting activity, Eglin AFB, Florida (FA8651-19). *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1887115/source/GovDelivery/

All news