Back to news

September 17, 2024 | Local, Naval

Ottawa asks defence contractors to make pitches for new submarine fleet | CBC News

The federal government is asking defence contractors in allied nations about the sorts of submarines and maintenance capabilities they could offer Canada.

https://www.cbc.ca/news/politics/submarine-canadian-forces-defence-blair-1.7324947

On the same subject

  • 444 Combat Support Squadron: Combat support from above

    August 2, 2019 | Local, Aerospace

    444 Combat Support Squadron: Combat support from above

    By Ben Forrest & Mike Reyno On a given day in the remote, sparsely-populated terrain over Happy Valley-Goose Bay and rural Labrador, it is often cloudy or snowing, or both. The winters are brutal and long; the summers are warm and wet, and militaries from all over the world have used this rugged patch of land for austere weather training. If something goes wrong in one of these training exercises–an injury or any other kind of disaster–the pilots and medical technicians from 444 Combat Support Squadron are there in a hurry. This small but effective crew of 35 military personnel and five civilians provides rapid response during training exercises at 5 Wing Goose Bay using three CH-146 Griffon helicopters. On occasion, aircrews also perform utility transport and secondary search and rescue (SAR). “We try to have a real team-oriented atmosphere,” said Maj Ryan Snider, commanding officer of 444 Squadron. “You're not two ships passing in the night, as many other squadrons and Wings are. You get a chance to interact with people on a regular basis, and get to know them far better than you would at a normal [posting.]” The squadron, one of three Combat Support squadrons in the Air Force, draws a mix of new recruits and pilots and technicians with previous Griffon experience. Postings usually last three years, and they can be an effective way for new pilots to get their feet wet. “I love it,” said Capt Marc Saucier. “The area can be really challenging, just because everything's so remote. I don't think you find terrain like this anywhere else in Canada, where everything's so far apart. “But it's been really good. There's not enough people in Labrador to necessitate us being called out that often in the first place, but what we do, it's pretty different each time.” Pilots in 444 Squadron average about 300 flying hours a year, and the posting can also be a refreshing change for seasoned pilots who transfer from other bases. “This is nice with the family, because I'm home all the time, other than the odd night,” said Capt Neil Gabourie, a Griffon pilot who has also spent time with 427 Special Operations Aviation Squadron at Canadian Forces Base Petawawa, Ont. 444 Squadron traces its history to 1947, where it was originally activated in Rivers, Man. It later transferred to St-Hubert, Que., where it operated the Sabre fighter jets, and then moved to Baden-Soellingen, Germany as part of Canada's commitment to the North Atlantic Treaty Organization (NATO). The squadron disbanded in 1963, but was stood up about two months later and equipped with the CF-104 Starfighter, which it operated until 1967 before being disbanded again. Five years later the squadron was re-activated and renamed 444 Tactical Helicopter Squadron flying the CH-136 Kiowa. Stood down on Apr. 1, 1992, the squadron was reactivated in Goose Bay in 1993, now equipped with the CH-135 Twin Huey in a rescue and support role. The CH-135 was replaced by the CH-146 in 1996. Today, the squadron operates out of two large hangars that make up a fraction of 5 Wing's massive infrastructure footprint, supporting NORAD's North Warning System radar sites on utility missions and supporting SAR efforts in the area when CH-149 Cormorant helicopters from 9 Wing Gander are not available. “JRCC (Joint Rescue Coordination Centre) Halifax will call upon us from time to time,” said Snider. “They understand we're not a Cormorant ... there are limitations. But they still give us a call and say, ‘What can you provide?' And then we'll do our best.” A major development at 444 Squadron over the last year has been the ongoing replacement of SAR Technicians with Medical Technicians on Griffon flight crews. The transition began in 2018 and once complete, Griffon crews will have two pilots, a flight engineer and a med tech on board. Similar transitions are taking place at 417 Combat Support Squadron at 4 Wing Cold Lake, Alta., and 439 Combat Support Squadron at 3 Wing Bagotville, Que. “The med techs will come to us having already undergone their medical technician training,” said Snider. “We'll top up that training to give them familiarization ... to operate at the back of the cabin of the aircraft. We'll train them on spotter duties, and then we'll also train them on how to function on the hoist.” Whereas SAR techs can jump out of helicopters to perform rescues at sea, med techs are not trained in skydiving or water diving and are geared toward land-based operations, said Sgt Adam Blackwell, a med tech. They also use specific hoist, insertion and extraction methods for land-based operations. Med techs are trained as primary care paramedics and have diverse backgrounds that make them extremely versatile. “We also do a lot of clinical and hospital kind of work–not just emergent care, not just tactical care,” said Blackwell. “We are jacks of all trades in the medical field, and used as such in different postings.” Instructed originally by SAR techs during the initial transition, med techs at 444 Squadron have now reached a point where there is a senior lead med tech able to train the more junior members. Recruiting med techs to the relatively isolated community of Goose Bay can be difficult, but many are quickly attracted to the squadron's warm, tight-knit culture once they arrive. “It's a bit different,” said Blackwell. “But honestly, it's pretty fun. If you are an outdoorsy person, this is the place to snowmobile or have an ATV. The fishing here is pretty amazing, too.” The squadron may have experienced a shift in focus in recent years, but its core mission remains the same. “It's that standby response to military operations,” said Snider. “Different customers, different tactics, but the same purpose.” https://www.skiesmag.com/features/444-combat-support-squadron-combat-support-from-above/?utm_source=skies-daily-news-top-story

  • Auditors target Defence Department for poor oversight of military-spending plan

    June 15, 2020 | Local, Aerospace, Naval, Land, C4ISR, Security

    Auditors target Defence Department for poor oversight of military-spending plan

    Saskatoon / 650 CKOM The Canadian Press June 14, 2020 10:28 am OTTAWA — The Department of National Defence has been called out for assigning less than three people to monitor the rollout of the Liberal government's plan to spend hundreds of billions of dollars in new military equipment, troops and training. The criticism is contained in an internal Defence Department audit and follows previous concerns that delays and other problems are slowing implementation of the plan, which was unveiled in 2017 and promised to spend $553 billion in the military over 20 years. The plan known as Strong, Secure, Engaged (SSE) is seen as critical for replacing much of the military's aging equipment and adding new capabilities such as armed drones and defences in cyber and space that are needed for 21st-century warfare. Yet the Defence Department earlier this year revealed that more than 100 of the roughly 300 capital projects associated with the plan were facing delays, with the delivery dates for some urgently needed equipment pushed several years into the future. The audit report dated last November but only recently published online underscores the importance of monitoring and oversight to ensure the plan is properly implemented over the next two decades. Auditors instead found "limited dedicated resources to co-ordinate and monitor implementation" of the plan, according to the report, with fewer than three full-time staff members specifically tasked with the job. By comparison, there were 32 staff members assigned to oversee a cost-cutting exercise launched by the previous Conservative government in 2013 that aimed to eliminate $1.2 billion in annual waste within the department. That effort met with limited success. "The capacity of the SSE implementation team is limited and as such, certain monitoring functions and independent validation of information are not being performed," according to the audit report. The auditors also flagged concerns that the lack of monitoring meant senior defence officials were not receiving clear and accurate information about the state of the plan, raising fears about bad decisions being made. Defence Department spokeswoman Jessica Lamirande said some of the issues identified by the auditors have been addressed while work on others is underway, though she did not say how many staff are now responsible for monitoring the plan. "We welcome reviews of this nature, which help us find where adjustments and improvements can be made to ensure the continued efficient progress and oversight of the policy," Lamirande said in an email. "All of these audit recommendations are being addressed, with several already completed and the others well underway. In fact, some recommendations validated work that was already in progress." Defence analyst David Perry of the Canadian Global Affairs Institute expressed surprise at the auditors' findings given senior officials had emphasized the importance of properly implementing the plan when it was released three years ago. That emphasis included monitoring progress, which Perry described as fundamental for identifying problems and areas that need attention — such as delayed procurement projects — to ensure the military gets what it has been promised and needs. The need to properly implement the plan and eliminate delays is even more important now, he added, given fears the federal government could start cutting defence spending as it seeks to find ways to pay for its COVID-19 emergency programs. "You've got a government whose wholesale attention is focused on the response to COVID," Perry said. "Any kind of delay in a program and the department basically not seizing the moment that it's got opens up potential vulnerability given the huge degree of economic and fiscal uncertainty that the department and government are facing right now." This report by The Canadian Press was first published June 14, 2020. Lee Berthiaume, The Canadian Press https://www.ckom.com/2020/06/14/auditors-target-defence-department-for-poor-oversight-of-military-spending-plan/

  • Royal Canadian Navy ships to return from Indo-Pacific deployment

    December 17, 2023 | Local, Naval

    Royal Canadian Navy ships to return from Indo-Pacific deployment

    Media are invited to attend the homecoming ceremony of His Majesty’s Canadian Ships (HMC Ships) Vancouver and Ottawa, and Motor Vessel (MV) Asterix, as the ships return to Esquimalt, B.C. on December 18, 2023, after 126 days away from home while deployed to the Indo-Pacific region.

All news