Back to news

April 29, 2021 | International, Aerospace

No title found

On the same subject

  • Contract Awards by US Department of Defense - August 06, 2020

    August 7, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - August 06, 2020

    NAVY Lockheed Martin Rotary and Mission Systems, Moorestown, New Jersey, was awarded a $65,283,976 fixed-price-incentive and firm-fixed-price contract for fiscal 2020 Aegis modernization, new construction of guided missile destroyers and Foreign Military Sales (FMS) production requirements. This contract combines purchases for the Navy (96.9%); the Kingdom of Spain (2.3%); and the government of Japan (0.8%), under the FMS program. Work will be performed in Moorestown, New Jersey (70%); Clearwater, Florida (29%); and Owego, New York (1%). This procurement covers the production and delivery of multi-mission signal processor equipment sets; Aegis Combat System support equipment; and electronic equipment fluid coolers and kill assessment system 5.1 equipment. This contract action also provides MK 6 Mod 0 equipment for the government of Japan and the Kingdom of Spain FMS requirements. Work is expected to be completed by November 2024. Fiscal 2014, 2017, 2018, 2019, and 2020 shipbuilding and conversion (Navy); fiscal 2020 other procurement (Navy); fiscal 2020 defense-wide procurement; and FMS case funding in the amount of $65,283,976 will be obligated at the time of award and will not expire at the end of the current fiscal year. In accordance with 10 U.S. Code 2304(c)(1) and (c)(4), this contract was not competitively procured (only one responsible source and no other supplies or services will satisfy agency requirements). The Naval Sea Systems Command, Washington, D.C., is the contracting activity. (Awarded July 31, 2020) Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $20,630,000 not-to-exceed, cost-plus-fixed-fee, undefinitized order (N00019-20-F-0078) against previously issued basic ordering agreement N00019-19-G-0008. This order procures various materials required for the 30P05 capability upgrade to all fielded pilot and maintenance training systems in support of the F-35 Program for the Navy, Marines, Air Force, non-Department of Defense (DOD) participants and Foreign Military Sales (FMS) customers. Work will be performed in Orlando, Florida (95%); and Fort Worth, Texas (5%), and is expected to be completed by December 2021. Fiscal 2020 aircraft procurement (Navy) funds in the amount of $7,620,000; non-DOD participant funds in the amount of $1,310,000; and FMS funds in the amount of $1,385,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. ARMY Korte Construction Co., St. Louis, Missouri, was awarded a $34,420,210 firm-fixed-price contract to design and construct a two-story 72,140 square-foot Joint Simulation Environment facility at Edwards Air Force Base. Bids were solicited via the internet with three received. Work will be performed at Edwards AFB, California, with an estimated completion date of Aug. 31, 2022. Fiscal 2020 military construction (defense-wide) funds in the amount of $34,420,210 were obligated at the time of the award. U.S. Army Corps of Engineers, Los Angeles, California, is the contracting activity (W912PL-20-C-0030). Iron Mountain Solutions Inc.,* Huntsville, Alabama, was awarded a $15,541,629 modification (000148) to contract W31P4Q-17-A-0001 for technical support for the Utility Helicopter Project Office. Work will be performed in Huntsville, Alabama, with an estimated completion date of Feb. 8, 2021. Fiscal 2020 aircraft procurement (Army); operations and maintenance (Army); research, development, test and evaluation (Army); other procurement (Army); and Foreign Military Sales (United Arab Emirates) funds in the amount of $15,541,629 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. AIR FORCE Rockwell Collins Inc., Collins Aerospace, Cedar Rapids, Iowa, has been awarded a $14,000,000 firm-fixed-price modification (P00007) to contract FA8102-16-D-0005 for services and supplies in support of modernization, expansion and depot-level contractor logistic support. The contractor will provide support for Scope Command's High Frequency Global Communications System in support of Air Force, Navy and Coast Guard requirements. Work will be performed in Richardson, Texas, and is expected to be completed Aug. 30, 2021. This option exercise is the result of a sole-source acquisition. The estimated cumulative contract value is $70,000,000. No funds are being obligated at the time of the award. The Air Force Life Cycle Management Center, Tinker Air Force Base, Oklahoma, is the contracting activity. Ball Aerospace & Technologies Corp., Boulder, Colorado, has been awarded a $9,682,027 contract for the Defense Experimentation Using Commercial Space Internet (DEUCSI) Call 002 Vendor Flexibility effort. This contract seeks to establish the ability to communicate with Air Force platforms via multiple commercial space internet constellations using common user terminal hardware elements. Work will be performed in Westminster, Colorado, and is expected to be completed April 17, 2022. This award is the result of a competitive acquisition under the DEUCSI Advanced Research Announcement Call 002. Fiscal 2020 research, development, test and evaluation funds in the amount of $4,536,000 are being obligated at the time of award. Air Force Research Laboratory, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8650-20-C-9320). *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2303639/source/GovDelivery/

  • Boeing ends deal, angering Brazilian jet maker Embraer

    April 27, 2020 | International, Aerospace

    Boeing ends deal, angering Brazilian jet maker Embraer

    By: The Associated Press CHICAGO — Boeing announced Saturday it terminated an agreement to join forces with Embraer, prompting an angry response from the Brazilian jet maker, which threatened to seek damages. The pair had planned to work together on Embraer's commercial aviation business and to develop new markets for its C-390 Millennium aircraft. They had been working toward an agreement for two years. Boeing said it ended the agreement after Embraer did not meet conditions laid out by the deal, in which Boeing would have held majority ownership. Over the past few months, the companies had “productive but ultimately unsuccessful negotiations” about the unsatisfied conditions, which was “deeply disappointing,” Marc Allen, Boeing's president of Embraer partnership and group operations, said in a news release. Embraer issued a statement saying it “believes strongly that Boeing has wrongfully terminated” the mutual transaction agreement and “that it has manufactured false claims as a pretext to seek to avoid its commitments to close the transaction and pay Embraer the US$4.2 billion purchase price.” “We believe Boeing has engaged in a systematic pattern of delay and repeated violations of the MTA (master transaction agreement), because of its unwillingness to complete the transaction in light of its own financial condition and 737 Max and other business and reputational problems,” it added. “Embraer will pursue all remedies against Boeing for the damages incurred by Embraer as a result of Boeing's wrongful termination and violation of the MTA,” the company said. The collapse marked the latest mishap for Boeing. The company's best-selling plane, the 737 Max, has been grounded for more than a year after two deadly crashes that led to federal investigations. Those problems, combined with deflated demand for flights due to the pandemic, sharply reduced the company's cash. https://www.defensenews.com/air/2020/04/26/boeing-ends-deal-angering-brazilian-jet-maker-embraer/

  • AeroVironment unveils Switchblade 600 loitering missile system

    October 7, 2020 | International, C4ISR, Security

    AeroVironment unveils Switchblade 600 loitering missile system

    Robin Hughes AeroVironment Inc. has disclosed development of a new category of medium-sized, man-portable loitering missile system designed to deliver tactical reconnaissance, surveillance, and target acquisition (RSTA) and enhanced precision multi-purpose/anti-armour effects at extended ranges. Developed in close co-operation with “a number of US Department of Defense [DoD] customers”, the Switchblade 600 builds on, and combines with, the in-service, combat-proven Switchblade 300 loitering weapon system and the Blackwing loitering reconnaissance system to form the core of an emerging family of scalable multi-mission loitering missile systems. “Switchblade 600 is a result of working closely with our DoD customers. They wanted the same features of the 300 but with greater effects, greater stand-off range, and extended endurance,” said Todd Hanning, Product Line Manager, Tactical Missile Systems at AeroVironment. Based on the same self-contained, tube-launched, collapsible wing, electric propulsion architecture as the backpackable Switchblade 300, the larger Switchblade 600 weighs 54.5kg (including the all-up round in the tube, and the fire control system – FCS), and is furnished with a 2-axis, 4-sensor gimballed (dual electro-optic and infrared) integrated sensor suite, and a multipurpose/anti-armour warhead, derived from the FGM-148 Javelin anti-tank guided missile, equipped with a height of burst sensor. A modular payload bay provides for the future integration of an array of different lethality options, including, potentially, an anti-radiation Switchblade 600 variant. https://www.janes.com/defence-news/news-detail/aerovironment-unveils-switchblade-600-loitering-missile-system

All news