Back to news

April 21, 2021 | International, Aerospace

No title found

On the same subject

  • New UULoader Malware Distributes Gh0st RAT and Mimikatz in East Asia

    August 19, 2024 | International, C4ISR, Security

    New UULoader Malware Distributes Gh0st RAT and Mimikatz in East Asia

    New UULoader malware targets Korean and Chinese users with Gh0st RAT; phishing scams target cryptocurrency wallets and AI users.

  • Contract Awards by US Department of Defense - May 1, 2019

    May 2, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    Contract Awards by US Department of Defense - May 1, 2019

    ARMY Callan Marine Ltd., Galveston, Texas (W912EP-19-D-0023); Cashman Dredging and Marine Contracting Co. LLC, Quincy, Massachusetts (W912EP-19-D-0024); Cavache Inc.,* Pompano Beach, Florida (W912EP-19-D-0025 ); Continental Heavy Civil Corp., Miami, Florida (W912EP-19-D-0026 ); Cottrell Contracting Inc.,* Chesapeake, Virginia (W912EP-19-D-0027); Great Lakes Dredge and Dock, Oak Brook, Illinois (W912EP-19-D-0028); J.T. Cleary Inc., Spring Valley, New York (W912EP-19-D-0029); Manson Construction Co., Seattle, Washington (W912EP-19-D-0030); Marinex Construction Inc., Charleston, South Carolina (W912EP-19-D-0031); Norfolk Dredging Co., Chesapeake, Virginia (W912EP-19-D-0032); Orion Marine Construction Inc., Tampa, Florida (W912EP-19-D-0033); Southern Dredging Co. Inc.,* Charleston, South Carolina (W912EP-19-D-0034); The Dutra Group, San Rafael, California (W912EP-19-D-0035); Waterfront Property Service LLC, doing business as Gator Dredging,* Clearwater, Florida (W912EP-19-D-0036 ); Weeks Marine Inc., Covington, Louisiana (W912EP-19-D-0037); Cavache Inc.,* Pompano Beach, Florida (W912EP-19-D-0038); CJW Construction Inc.,* Santa Ana, California (W912EP-19-D-0039); Coastal Dredging Co. Inc.,* Hammond, Louisiana (W912EP-19-D-0040); Cottrell Contracting Inc.,* Chesapeake, Virginia (W912EP-19-D-0041); Florida Dredge and Dock LLC,* Tarpon Springs, Florida (W912EP-19-D-0042); Southern Dredging Co. Inc.,* Charleston, South Carolina (W912EP-19-D-0043); Southwind Construction Corp.,* Evansville, Indiana (W912EP-19-D-0044); and Waterfront Property Service LLC, doing business as Gator Dredging,* Clearwater, Florida (W912EP-19-D-0045), will compete for each order of the $495,000,000 firm-fixed-price contract for dredging and shore protection projects. Bids were solicited via the internet with 24 received. Work locations and funding will be determined with each order, with an estimated completion date of April 30, 2024. U.S. Army Corps of Engineers, Jacksonville, Florida, is the contracting activity. HB&A LLC,* Colorado Springs, Colorado (W9128F-19-D-0004); Kenneth Hahn Architects Inc.,* Omaha, Nebraska (W9128F-19-D-0005); and Yeager Architecture Inc.,* Overland Park, Kansas (W9128F-19-D-0006), will compete for each order of the $30,000,000 firm-fixed-price contract for preparation of studies, analysis and design services. Bids were solicited via the internet with 22 received. Work locations and funding will be determined with each order, with an estimated completion date of April 30, 2024. U.S. Army Corps of Engineers, Omaha, Nebraska, is the contracting activity. PRIDE Industries, Roseville, California, was awarded a $20,122,695 modification (P00008) to contract W91247-18-C-0011 for repair and maintenance support. Work will be performed in Fort Polk, Louisiana, with an estimated completion date of May 31, 2023. Fiscal 2019 operations and maintenance, Army funds in the amount of $5,772,517 were obligated at the time of the award. U.S. Army Mission Installation Contracting Command, Fort Polk, Louisiana, is the contracting activity. A. WBE-CCI JV One LLC,* Itasca, Illinois, was awarded a $7,828,000 firm-fixed-price contract for the construction of a new Air National Guard Fire Crash Rescue Station. Bids were solicited via the internet with five received. Work will be performed in Peoria, Illinois, with an estimated completion date of Oct. 30, 2020. Fiscal 2019 military construction funds in the amount of $7,828,000 were obligated at the time of the award. U.S. Property and Fiscal Office Illinois is the contracting activity (W91SMC-19-C-6001). S.D.S Lumber Co.,* Bingen, Washington, was awarded a $7,757,620 modification (P00007) to contract W912EF-18-C-0010 for towboat services. Work will be performed in Walla Walla, Washington, with an estimated completion date of April 30, 2021. Fiscal 2019 operations and maintenance, Army funds in the amount of $3,638,716 were obligated at the time of the award. U.S. Army Corps of Engineers, Walla Walla, Washington, is the contracting activity. STG Inc.,* Reston, Virginia, was awarded a $7,645,240 firm-fixed-price contract for operational and technical engineering. Bids were solicited via the internet with three received. Work will be performed in Fort Huachuca, Arizona, with an estimated completion date of April 30, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $7,645,240 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W91RUS-19-F-0142). DEFENSE LOGISTICS AGENCY Beacon Point Associates LLC, Cape Coral, Florida, has been awarded a maximum $49,000,000 fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for medical/surgical supplies. This was a competitive acquisition with 16 responses received. This is a five-year contract with no options. Location of performance is Florida, with a May 14, 2024, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2DE-19-D-0005). Allied Tube and Conduit Corp., Harvey, Illinois, has been awarded a maximum $46,000,000 firm-fixed-price with economic-price-adjustment contract for barbed tape concertina wire. This is a competitive acquisition with two responses received. This is a two-year base contract with three one-year option periods. Locations of performance are Illinois and Ohio, with an April 30, 2022, performance completion date. Using military services are Army, Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2019 through 2022 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE8E6-19-D-0002). American Medical Depot (AMD), Miramar, Florida, has been awarded a maximum $45,000,000 fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for medical/surgical supplies. This was a competitive acquisition with 11 responses received. This is a five-year contract with no option periods. Location of performance is Florida, with a June 11, 2024, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2DE-19-D-0009). Kandor Manufacturing Inc., Kandor, Puerto Rico, has been awarded a maximum $13,896,462 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the Navy working uniform, Blouses/Trousers Type II and III, and maternity blouses. This was a competitive acquisition with five responses received. This is an 18-month base contract with three one-year option periods. Location of performance is Puerto Rico, with an Oct. 29, 2020, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2019 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-19-D-1163). (Awarded April 30, 2019) AIR FORCE Rockwell Collins Inc., Collins Aerospace – Mission Systems, Cedar Rapids, Iowa, has been awarded a $43,033,042 cost-plus-incentive-fee contract for Next Generation Application Specific Integrated Circuit Preliminary Design Review (PDR). This contract provides for the design, develop, and test of modernized Global Positioning System receivers that are intended for future military applications to the PDR level. Work will be performed in Cedar Rapids, Iowa, and is expected to be complete by April 2021. This award is the result of a sole-source acquisition. Fiscal 2019 research and development funds in the amount of $9,000,000 are being obligated at time of award. Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity (FA8807-19-C-0003). International Business Machines Corp., Yorktown Heights, New York, has been awarded a $7,500,000 other transaction agreement for experimental purposes to provide an IBM Q access license. This agreement provides for remote access to the IBM Q System, a quantum computer with approximately 20 to 50 qubits. Work will be performed in Yorktown Heights, New York, and is expected to be complete by April 30, 2022. Fiscal 2019 research and development funds in the amount of $5,000,000 are being obligated at the time of award. Air Force Research Laboratory, Rome, New York, is the contracting activity (FA8750-19-9-0334). NAVY Systems Application and Technologies Inc., Largo, Maryland, is awarded a $14,583,586 cost-plus-fixed-fee contract to procure continued support services to the Air Vehicle Modification and Instrumentation (AVMI) Department and the Naval Air Systems Command (NAVAIR). Required services include support for the designing, developing, procuring, building, installing, testing and evaluating, calibrating, modifying, operating and maintaining instrumentation on aircraft and engines for the Navy and other government and commercial customers. Work will be performed at Patuxent River, Maryland (74 percent); China Lake, California (13.5 percent); and Point Mugu, California (12.5 percent), and is expected to be completed in November 2020. Working capital (Navy) funds in the amount of $8,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with four offers received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-19-C-0023). *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1831787/source/GovDelivery/

  • RAF Retiring Reaper In 2024, Paving Way For Protector

    July 30, 2019 | International, Aerospace

    RAF Retiring Reaper In 2024, Paving Way For Protector

    By Tony Osborne LONDON—Britain is planning to retire its General Atomics MQ-9 Reaper unmanned aircraft systems in 2024 as the Royal Air Force transitions to its new Protector platform. Although Royal Air Force (RAF) officers have not detailed when the first of the new Protector aircraft will arrive, there will be a transition as crews retrain from Reaper onto Protector, with the Reaper complementing the Protector on operations, Wing Commander Judith Graham, the RAF's Protector Program Manager, told Aerospace DAILY at the Royal International Air Tattoo earlier this month. “Reaper is an extraordinarily valuable capability for the UK government, so we don't want there to be a capability gap,” Graham said. The plan for avoiding a capability gap between Reaper and Protector suggests that a significant number of Protectors will have entered service by the time the Reaper is retired. The UK currently has 10 MQ-9 Reapers that it purchased as an urgent operational requirement for operations in Afghanistan. Today, they operate over Iraq and Syria, but none are destined for use in UK airspace. Work also is underway to select the site for a new facility at RAF Waddington, UK, from which the Protector fleet and the UK's new E-7 Wedgetail airborne early warning aircraft will be operated. Graham said the facility needs “to be ready for Protector by the end of 2021,” suggesting that first Protector deliveries could take place in 2022. Britain plans to centralize its Protector operations from Waddington, resulting in the UK presence at Creech AFB, Nevada being scaled down. Because of the Protector's ability to self-deploy and perform autonomous landing and take-off, there also is a significantly reduced need for forward-based personnel to land the aircraft at forward-operating locations, further reducing the personnel burden. The UK currently is planning to buy 16 Protectors, a derivative of General Atomics' self-developed, certifiable SkyGuardian platform, which has been redesigned to pave the way for it to meet military airworthiness requirements. As a result, the aircraft now features an all-weather capability with an electro-expulsive de-icing system that blows the ice off the leading edges of the wings and Y-stabilizers. General Atomics also has increased the fatigue life and damage tolerance of the aircraft and produced flight-critical software certifiable to the DO-178 standard. British Protectors will be armed with the Raytheon Paveway IV laser-guided-bomb and MBDA Brimstone air-to-ground missile. There also are plans to fit it with Leonardo's Sage Electronic Support Measures system. The aircraft will also be equipped with General Atomics' Lynx synthetic aperture radar, but there are studies to look at installing a larger radar, such as Leonardo's Seaspray surface-search radar. Work on the integration of such a radar, which could allow the Protector to support the UK's new P-8 Poseidon in the maritime patrol role, is being scoped but is not yet funded. RAF officers are working alongside General Atomics at its San Diego, California, facility as part of a combined test team to pave the way for the platform's certification by the UK Military Aviation Authority, which the RAF hopes will allow the aircraft to fly in non-segregated airspace for training and support to national authorities. They are hoping to do this even without the immediate installation of General Atomics internally developed sense-and-avoid radar. The RAF's Protectors will be compatible, but not immediately equipped, with the active electronically scanned array radar, but Graham said work was underway with the UK's newly renamed Strategic Command (formerly Joint Forces Command) to understand the requirement for the radar, and test and evaluation work was underway. Officials state that the radar likely will be introduced as part of the full operational capability for the platform. The UK also will use the General Atomics Advanced Cockpit ground control station, which uses a similar flight management system to the Beechcraft King Air 350. Under current plans, the British Protectors will be flown by a crew of three—a pilot, a sensor operator and a mission intelligence coordinator. Rather than flying the aircraft from inside transportable containers, the seven ground control stations will occupy a permanent building with room for expansion. There also will be scope to add an additional mission specialist, should a particular mission require it, officials say. https://aviationweek.com/defense/raf-retiring-reaper-2024-paving-way-protector

All news