December 22, 2024 | International, C4ISR, Security
Rspack npm Packages Compromised with Crypto Mining Malware in Supply Chain Attack
Compromised Rspack npm packages exposed 445,000 users weekly to IP tracking and XMRig malware.
September 24, 2023 | International, Naval, C4ISR
Four USVs are operating from Japan in the Integrated Battle Problem 23.2 exercise aimed at integrating these unmanned systems into routine fleet missions.
December 22, 2024 | International, C4ISR, Security
Compromised Rspack npm packages exposed 445,000 users weekly to IP tracking and XMRig malware.
March 16, 2020 | International, C4ISR
By: Nathan Strout The Department of Defense is seeking 5G prototypes related to the development of smart warehouses, the National Spectrum Consortium announced March 12. The department has released a Request for Prototype Proposals through the consortium and is looking for a variety of smart warehouse enabling 5G technologies to test at the Marine Corps Logistics Base in Albany, Georgia. The department has divided the prototype technologies its interested in into three broad categories: A 5G network, enhancements to that network, and applications enabled by that network. Here is how the National Spectrum Consortium explains it: 5G Prototype Testbed – The objective of this prototype project is to design and deploy a 5G network prototype that can serve as a reference implementation for Marine Corps smart warehouse operations. 5G Prototype Enhancements – The objective of this prototype project is to design and field prototype 5G network enhancements that can serve as reference implementations for Marine Corps smart warehouse operations. 5G Prototype Applications – The objective of this prototype project is to design and field prototype 5G enabled applications that can serve as reference implementations for Marine Corps smart warehouse operations. The request is the first of four 5G RPPs the department is planning to release as it prepares to begin testing a variety of technologies at four military bases. The Pentagon has previously said that they plan to test 5G enabled augmented reality and virtual reality at Joint Base Lewis-McChord, dynamic spectrum sharing at Hill Air Force Base, and smart warehouses at Marine Corps Logistics Base and Naval Base San Diego. The RPP is available to members of the National Spectrum Consortium, an acquisition vehicle created via a five-year, $1.25 billion Other Transaction Agreement by the Office of the Deputy Assistant Secretary of Defense, Emerging Capabilities and Prototyping. “This is the first of four proposals that the DOD has released. We encourage our membership, which is made up of traditional contractors and innovative startups, to collaborate and respond to these incredibly important RPPs,” said Joseph Dyer, chief strategy officer of the National Spectrum Consortium. https://www.c4isrnet.com/battlefield-tech/it-networks/5g/2020/03/12/pentagon-seeking-5g-prototypes-for-smart-warehouses/
November 18, 2020 | International, Aerospace
Hallbergmoos, Wednesday, November 11, 2020 - EUROJET Turbo GmbH (EUROJET), the consortium responsible for the EJ200 engine installed in the Eurofighter Typhoon, today signed a contract with the NATO Eurofighter & Tornado Management Agency (NETMA) to provide 56 new EJ200 engines for the German Air Force. The contract, signed in Munich, between General Miguel Ángel Martín Pérez, General Manager of NETMA, and Gerhard Bähr, CEO of EUROJET, covers EJ200 engines for a new order of Tranche 4 Typhoon fighter aircraft. Production of the engine modules will be carried out locally by the four partner companies of the EUROJET consortium; Rolls-Royce, MTU Aero Engines, ITP Aero and Avio Aero. As partner for the German Air Force, final assembly of the engines will take place at MTU Aero Engines with deliveries to the German customer scheduled to begin in 2023. Commenting on the finalisation of the contract Mr Bähr stated: “This contract signature is a clear statement of confidence in the platform and of the performance and sustainability of the EJ200 engines which power it. In addition, it also demonstrates a high level of confidence in the consortium and its European industrial base, and will secure highly skilled workplaces in the aerospace industry in the coming years.” ABOUT EUROJET: The EUROJET consortium is responsible for the management of the EJ200 engine programme. EUROJET's shareholders comprise Rolls-Royce (UK), MTU Aero Engines (Germany), ITP Aero (Spain) and Avio Aero (Italy). The engine represents outstanding and innovative technology and continually demonstrates its exceptional performance in the Eurofighter Typhoon. With its unprecedented performance record, combined with multi-role capability and highest availability at competitive life-cycle costs, the EJ200 engine is perfectly set to meet air force requirements, both of today and the future. Since delivery of the first production engine in 2003, well over a thousand EJ200 production engines have been delivered to Air Force customer fleets of nine nations, and the EJ200 engine has achieved in excess of 1 million engine flying hours. View source version on EUROJET Turbo GmbH : https://www.eurojet.de/2020/11/11/eurojet-signs-contract-with-netma-for-provision-of-56-new-ej200-engines-for-the-german-air-force/