Back to news

August 19, 2024 | International, Aerospace

Missile Defense Agency eyes discriminating space sensor launch by 2029

The MDA director told Defense News the sensor is a key part of the agency's vision for a space-based missile-tracking layer.

https://www.c4isrnet.com/space/2024/08/19/missile-defense-agency-eyes-discriminating-space-sensor-launch-by-2029/

On the same subject

  • La France commande 367 nouveaux missiles air-air à MBDA

    March 19, 2021 | International, Aerospace

    La France commande 367 nouveaux missiles air-air à MBDA

    Le ministère des Armées a annoncé, jeudi 18 mars, la commande à MBDA de 367 missiles air-air de nouvelle génération Mica NG, dans le cadre d'un programme de 1,8 milliard d'euros. Les missiles, commandés le 5 mars par la Direction générale de l'armement (DGA), seront livrables entre 2028 et 2031. Ils remplaceront les missiles Mica et permettront notamment d'allonger la capacité d'interception à moyenne distance des avions de combat Rafale. Ne comportant pas de composants américains, ils ne sont pas tributaires de la législation Itar, qui impose l'autorisation des Etats-Unis pour l'exportation. Le ministère des Armées avait déjà commandé 200 Mica NG fin 2018, qui seront livrés à partir de 2026, rappelle Le Figaro. Le Figaro du 19 mars

  • DIU Seeks Prototype Sat Terminal For Army All-Domain Ops

    March 20, 2020 | International, Land, C4ISR

    DIU Seeks Prototype Sat Terminal For Army All-Domain Ops

    The mobile TITAN satellite ground station is a critical node in Army plans for all-domain operations. By THERESA HITCHENS WASHINGTON: The Defense Innovation Unit (DIU) wants commercial vendors to submit prototypes for the Army's planned mobile ground station that can fuse sensor data from multiple ISR satellites — including both national security and commercial — into a common operational picture for battlefield commanders. While this solicitation, released late yesterday, focuses on space-based sensors, ultimately the Tactical Intelligence Targeting Access Node (TITAN) is envisioned as a “unified” ground station that can take data not just from satellites, but also from high-altitude, aerial and terrestrial ISR sensors to provide targeting data directly to Army Long-Range Precision Fires (LRPF) networks. The Army describes TITAN as a “scalable and expeditionary intelligence ground station.” It is envisioned as a critical enabler of Army all-domain operations command and control. The satellite terminal is the first step in what will be a modular development of the TITAN terminal's capabilities over time — with a goal to deploy and initial operating capability early in fiscal 2022, as Brig. Gen. Rob Collins, Army program executive officer for intelligence, electronic warfare and sensors, explained at the giant Association of the United States Army (AUSA) show in October, DIU's Space Portfolio Director Steve Butow explained in an email that the prototype ground stations should be “capable of rapidly and semi-autonomously tasking, receiving, processing, exploiting, fusing, and disseminating space based sensor data to provide networked situational awareness and direct tactical support to Army commanders at echelon.” One of the key goals is “to reduce sensor to shooter latency.” Latency is the term of art to describe the time it takes to send information from the satellite to the user on the ground. The prototype ground stations — which as with all DIU projects are envisioned to be rapidly fielded — must be capable of “rapid deployment to diverse operational environments via strategic lift and once deployed, be capable of rapid setup, tear down, movement, and assembly to meet operational commander's needs.” They also must be able to function “for a reasonable period of time” through “any loss of non-local communications or networks.” American contractors have until April 3 to put forward a proposal. Proposed prototypes “should include everything required to operate during a designated exercise(s) and demonstration(s) as well during real world operations, including the vehicle/trailers, power generation/conditioning, antennae, communications/network hardware/software (to include line of sight and beyond line of sight), processing hardware/software, and analytical hardware/software,” the solicitation states. Further, prototypes should be able to store and process data from multiple commercial providers. This means that the “access node should be a modular, open systems architecture, making it easy to upgrade software/firmware, analytics/algorithms, and ingest additional data streams as commercial vendors and national data become available.” This includes being able to store and process both classified and unclassified data. The project will run for 24 to 30 months, and will include the delivery of at least two and as many as six working prototypes. They must be ready for immediate testing and evaluation in a theater exercise. DUI is looking at two phases. Phase 1 includes the “development, integration, testing, accreditation and delivery” of two prototypes by January 2022. Phase 2 “includes the testing, assessment, and refinement of the prototype systems based upon participation in and feedback from several exercises and evaluations,” both in the US and theaters abroad. Phase 2 also includes the option of delivering up to four additional prototype systems. DIU generally uses Other Transaction Authorities as a contracting vehicle, as will this program. The solicitation notes that DoD is “also pursuing a separate parallel effort for the objective TITAN ground station design to accommodate Aerial and Terrestrial sensors as well.” Thus, the contractor(s) chosen will need to work ensure designs for the satellite terminal can be integrated with, and that all the software is transportable to, that design via agreements with the other companies involved. The Army issued a Request for Information on Dec. 4 about technologies to enable the “objective” TITAN terminal that can integrate all types of ISR sensors. That RFI was updated on Dec. 18. The RFI explains that TITAN eventually will replace the Army's current Tactical-Intelligence Ground Station, Operational-Intelligence Ground Station, Advanced Miniaturized Data Acquisition System Dissemination Vehicle and Remote Ground Terminal. It also must be “to operate at Brigade, Division, Corps, and Field Army echelons, in vehicles and shelters organic to the formation,” the solicitation said. According to a Q&A transcript of the Army's Dec. 4 industry day on TITAN, the service currently sees potential deployment platforms: a larger version for integration with on one variant of the Family of Medium Tactical Vehicles (FMTV) with a shelter; and a smaller one to be integrated on “a four-seater tactical vehicle — either a Joint Light Tactical Vehicle (JLTV) or a Humvee. What is unclear is how this DIU effort relates to the earlier sole-source award to Peraton for the Satellite Ground Terminal (SGT) Prototype, that on the face of it is being designed to do exactly the same thing. Under that Nov. 19 award, which supports the Army's Tactical Exploitation of National Capabilities (TENCAP) program, Peraton was to develop a fully-tested prototype to the Army within 20 months. SGT is expected to transfer up to 1,000 times more satellite data to operators than currently possible, according to Peraton. Queries to the Army, DIU and Peraton about this were not answered at press time. https://breakingdefense.com/2020/03/diu-seeks-prototype-sat-terminal-for-army-all-domain-ops

  • Pratt wins engine-work contract to keep aging B-52, AWACS flying

    November 15, 2023 | International, Aerospace

    Pratt wins engine-work contract to keep aging B-52, AWACS flying

    With the Air Force planning to retire the AWACS and replace the B-52's current engines, the contract could last for the remainder of the TF33's life.

All news