Back to news

July 26, 2023 | Local, Aerospace

Government of Canada announces preferred bidder for Future Aircrew Training Program in support of Royal Canadian Air Force

On the same subject

  • Tested for war at sea: Exercise RIMPAC

    January 24, 2023 | Local, Aerospace

    Tested for war at sea: Exercise RIMPAC

    Last year's RIMPAC exercise allowed Western forces to demonstrate the power and agility of integrated air and maritime assets, and was a first opportunity for many to participate in a massive multinational training event.

  • Government inaugurates new armoury for Halifax Army Reserve

    January 23, 2019 | Local, Land

    Government inaugurates new armoury for Halifax Army Reserve

    January 23, 2019 – Halifax, Nova Scotia – National Defence / Canadian Armed Forces As outlined in Canada's defence policy, Strong, Secure, Engaged, the Government of Canada is investing in modern, functional, and green defence infrastructure to support the evolving needs of our military. Today, Bernadette Jordan, Minister of Rural Economic Development and Andy Fillmore, Parliamentary Secretary to the Minister of Canadian Heritage and Multiculturalism, on behalf of Harjit S. Sajjan, Minister of National Defence, participated in a ribbon-cutting ceremony for the new Willow Park Armoury in Halifax. Valued at $55.2 million, this project was completed on time and under budget, and provided significant economic opportunities for the local Halifax community by creating an estimated 250 jobs during construction. The new 8,574-m2 armoury will bring together three units from the Army Reserve in Halifax, the 36 Service Battalion, 36 Signal Regiment, and 33 Field Ambulance. It includes a modern administration and training space, facilities for storing and maintaining equipment, common mess areas, a large drill hall, and an outdoor compound for military vehicles. This new facility will provide these units with the required space and facilities to carry out critical operational and training exercises, while also accommodating their future growth. Quotes “Through our defence policy, Strong, Secure, Engaged, our government is investing in a strong, modern, and capable Reserve Force. This new armoury will provide units from the Army Reserve in Halifax with functional and green infrastructure needed to carry out their important work at home and abroad, while also supporting their continued growth.” Harjit S. Sajjan, Minister of National Defence “Our people are at the heart of our military's operational success. By investing in a new home for these three Reserve units, we are doing our part to support their well-being, while also ensuring they have the facilities needed to support their critical operations and training.” Bernadette Jordan, Minister of Rural Economic Development “The opening of this new armoury represents an important milestone for the local Halifax community. In addition to directly supporting the important work of our Canadian Armed Forces, the new facility was built with environmental efficiency in mind, helping to reduce its carbon footprint in support of a cleaner, greener, Canada.” Andy Fillmore, Parliamentary Secretary to the Minister of Canadian Heritage and Multiculturalism Quick facts The new facility will be used by three Army Reserve units: 36 Service Battalion, 36 Signal Regiment, and 33 Field Ambulance. Contracts were awarded to two companies in Bedford, N.S. for this project. Bird Design-Build Construction Inc. was awarded a contract for the design and construction of the new armoury, as well as the demolition of two obsolete buildings. Dexter Construction Company Ltd. was awarded a contract for the demolition of a third obsolete building. Completed in August 2018, the new armoury was designed to meet Leadership in Energy and Environmental Design (LEED®) Silver standards, and incorporates green building concepts to minimize its footprint. Green infrastructure will reduce greenhouse gas emissions from the Department's buildings and non-military vehicles by 40 percent (from 2005 levels) by 2030, and supports the new federal emissions reduction target of 80 percent by 2050. https://www.canada.ca/en/department-national-defence/news/2019/01/government-inaugurates-new-armoury-for-halifax-army-reserve.html

  • Government of Canada launches pilot project to construct new facility for the Royal Canadian Dragoons

    January 17, 2019 | Local, Land

    Government of Canada launches pilot project to construct new facility for the Royal Canadian Dragoons

    January 15, 2019 – Petawawa, Ontario – National Defence / Canadian Armed Forces In support of Canada's defence policy, Strong, Secure, Engaged, the Government of Canada is providing modern, green and functional infrastructure in which our military personnel can work and train. Today, on behalf of Defence Minister Harjit S. Sajjan, William Amos, Member of Parliament for Pontiac, announced a project to deliver new and enhanced facilities for the Royal Canadian Dragoons at 4th Canadian Division Support Base Petawawa. This pilot project represents the first time the Government of Canada will use the integrated project delivery approach for a construction project. This approach offers a unique way to manage construction projects and deliver results faster, by promoting greater collaboration and innovation between industry and the Crown. Valued at $80.6 million, the project is expected to provide economic opportunities for the local community and generate about 225 jobs during the construction period. It will see the renovation of three existing buildings, and the replacement of eight obsolete buildings with a single, centralized 9,900-m2 facility. These modern facilities will provide the regiment with enhanced vehicle maintenance, storage, logistics and training areas to increase collaboration and support daily operations. Quotes “Through our defence policy, Strong, Secure, Engaged, we are ensuring that the women and men of our Canadian Armed Forces have the tools, facilities and equipment they need to do the important work we ask of them. This project will provide Canadian Armed Forces members with enhanced logistics and training areas to support them in their daily operations. This new, modern infrastructure will also support our government's commitment to fighting climate change while providing good, middle class jobs for local residents.” Harjit S. Sajjan, Defence Minister “This project represents a great investment for the Royal Canadian Dragoons, as well as the wider Ottawa Valley and Pontiac regions. By replacing aging infrastructure with updated green facilities, we're increasing our military's capabilities, lowering our carbon footprint, and creating jobs and economic opportunities for Eastern Ontario and Western Quebec.” William Amos, Member of Parliament for Pontiac Quick facts Formed in 1883, the Royal Canadian Dragoons is the most senior armoured regiment of the Canadian Army. The integrated project delivery approach is more innovative than traditional delivery models, and has been used to successfully deliver private sector infrastructure projects. The Crown, the designer and the builder have formed an integrated project team, and will establish goals and make project decisions together throughout the project. Emphasis on collaborative, early project planning has the potential to shorten the construction phase and deliver the project faster and at a better value. On behalf of DND, Defence Construction Canada (DCC) awarded the construction and design contracts to PCL Constructors Inc. and Architecture49 Inc. Initial design and planning are expected to be completed by fall 2019, with construction and renovations expected to begin by spring 2020. The facility is expected to be completed in 2021. The new building will meet Leadership in Energy and Environmental Design (LEED®) Silver standards and save an estimated $4.6 million in operations and maintenance costs over 40 years. This and other green projects will help Defence reduce greenhouse gas emissions from buildings and non-military vehicles by 40 percent (from 2005 levels) by 2030, and support the new federal emissions reduction target of 80 percent by 2050. DCC is a Crown corporation that delivers infrastructure and environmental projects for the defence of Canada. It provides contracting, construction contract management and related infrastructure services to DND. Associated links Royal Canadian Dragoons https://www.canada.ca/en/department-national-defence/news/2019/01/government-of-canada-launches-pilot-project-to-construct-new-facility-for-the-royal-canadian-dragoons.html

All news