Back to news

November 6, 2024 | International, Land, C4ISR, Security

Google Cloud to Enforce Multi-Factor Authentication by 2025 for All Users

Google Cloud enforces mandatory MFA by 2025 to boost global account security and counter cyber threats.

https://thehackernews.com/2024/11/google-cloud-to-enforce-multi-factor.html

On the same subject

  • Northrop Grumman and Rohde & Schwarz Sign MOU to Support Multi-Domain Operations and Interoperability in Europe

    December 4, 2023 | International, Land

    Northrop Grumman and Rohde & Schwarz Sign MOU to Support Multi-Domain Operations and Interoperability in Europe

    Berlin – December 4, 2023 – Northrop Grumman Corporation (NYSE: NOC) and Rohde & Schwarz signed a Memorandum of Understanding (MOU) at the Berlin Security Conference in Germany to collaborate...

  • Lockheed planning big shift away from LCS propulsion system for its future frigate offering

    October 25, 2018 | International, Naval

    Lockheed planning big shift away from LCS propulsion system for its future frigate offering

    By: David B. Larter PARIS – Lockheed Martin is planning to shift from its littoral combat ship's water-jet propulsion to a propulsion system that the U.S. Navy is more familiar with for its future frigate offering, Lockheed's vice president for small combatants and ship systems told reporters at the 2018 Euronaval show. As it works through the Navy's requirements for its FFG(X) program, Lockheed is hoping that a more traditional twin-screw design with independent drive trains will entice the service towards its offering. One of the major hang-ups with the design requirements for all the competitors has been requirement that the engineering spaces be separated by a certain number of meters so that if the ship takes damage in one area, the other space should be online to drive the ship. If the design can't meet the spacing requirement, an alternative propulsion unit has to be installed. For Lockheed, the decision was to try and meet the spacing requirement, which is making its FFG(X) offering a bigger ship than the Freedom-variant littoral combat ship. “We felt the more traditional approach to the suite, going with more of the ... port and starboard side, redundant type of propulsion trains, that familiarity would be well received by the Navy. Going to more of a common system sized for the FFG(X),” said Joe DePietro. “It does require the ship to be longer, given those separation requirements and how you plan to stagger your port and starboard configuration of the combining gear/reduction gear, running into a single shaft into a screw on either side. You have to have a certain amount of separation and they have to be fully independent.” As for the system itself, Lockheed is keeping its options open, but is looking hard and combined diesel and gas systems, or even combined diesel and diesel, give the speed requirements for FFG(X), which are well reduced from what they were for the speedy LCS. The fleet has been receptive but mixed on the idea of a straight diesel propulsion system. But the trade-off for gas turbines is less fuel efficiency, which impacts range, DePietro said. In February, the Navy announced that it had awarded design contracts to asked to Huntington Ingalls, Lockheed Martin, Austal USA, General Dynamics Bath Iron Works, and Italian shipbuilder Fincantieri have all been asked to submit mature designs. Lockheed is playing a strong hand going into selection, however, because of its partnership with Fincantieri on the Freedom-variant LCS, which is built at Fincantieri's Marinette Marine shipyard in Wisconsin. Lockheed will either win the award for its modified LCS or it will be a systems integrator for Fincantieri's FREMM, which is another leading competitor for the program. https://www.defensenews.com/digital-show-dailies/euronaval/2018/10/23/lockheed-planning-big-shift-away-from-lcs-propulsion-system-for-its-future-frigate-offering

  • South Korean study finds Chinook upgrade more expensive than buying new helos

    October 27, 2020 | International, Aerospace

    South Korean study finds Chinook upgrade more expensive than buying new helos

    Brian Kim SEOUL — Research on the long-awaited upgrade of Chinook helicopters flown by the South Korean military shows it would be cheaper to buy new aircraft, according to a local lawmaker. Rep. Min Hong-chul of the ruling Democratic Party revealed the result of the latest preliminary research on the Chinook upgrade during a parliamentary audit of the Defense Acquisition Program Administration on Oct. 20. The lawmaker, who sits on the National Assembly's Defense Committee, said the research concluded in September that the cost of upgrading 17 of the 43 CH-47D Chinook helicopters would be about 1.35 trillion won ($1.2 billion), which is higher than the estimated cost of 1.22 trillion won for buying new ones. The upgrade cost is partly driven by the fact that Chinook manufacturer Boeing no longer produces parts for older variants, like those owned by South Korea, so specially ordered parts could prove expensive, Min said, citing the research conducted by the Defense Agency for Technology and Quality, which is affiliated with DAPA. Furthermore, some Korean military task equipment such as the Korean Variable Message Format data link cannot be installed on the upgraded helos due to incompatibility, the research suggested. “A series of reverses and delays on decision-making have foiled key arms acquisition projects, including the Chinook upgrade,” Min said, expressing concern about an operational gap in military transport trainings and missions. South Korea operates about 50 Chinooks, with some of them in service for up to 50 years. With some parts of the older Chinook no longer being produced, the South Korean fleet's operational rate has suffered, according to the lawmaker. For instance, the Air Force's Chinook utilization rate from the first half of the year was around 40 percent. DAPA is expected to hold a meeting soon to decide whether to buy new heavy-lift helicopters rather than upgrade the existing fleet. But industry sources expect buying new helos would take more time and end up costing more, depending on the variant. “To get Block I CH-47F Chinook cargo helicopters, which have been on the shopping list of the South Korean Army, the letter of offer and acceptance should be issued by July next year at the latest, but it would be very difficult to finalize the decision-making procedures within the timeline,” said Ahn Seung-beom, a military analyst and writer with Defense Times Korea. “[If it doesn't] buy Block I, South Korea has an option to get Block II, which is to be produced for the U.S. Army first, and then it could take more time and costs to get the up-to-date, heavy-lift helicopters.” A source at Boeing told Defense News that both cost and an export license stand in the way of South Korea's CH-47F Block II purchase. “The development of the CH-47F Block II is still underway, so the price cannot be expected at this moment,” the source explained on condition of anonymity. “The U.S. Army has yet to place an order for the new cargo helicopters, so it's unclear how many aircraft would be produced.” It's also unclear if a foreign sale will receive approval, the source added. “The U.S. government strictly controls arms technology, so getting an export license for key weapons systems is a hurdle.” https://www.defensenews.com/global/asia-pacific/2020/10/27/south-korean-study-finds-chinook-upgrade-more-expensive-than-buying-new-helos/

All news