Back to news

November 5, 2024 | International, Naval

Europeans start work on next-generation combat ship for the 2040s

Based on feedback from European Union member states, the requirement could be for a vessel with a displacement of 8,000 metric tons or more.

https://www.defensenews.com/global/europe/2024/11/05/europeans-start-work-on-next-generation-combat-ship-for-the-2040s/

On the same subject

  • US must ensure mission partner data security for collaborative warfare

    October 21, 2022 | International, C4ISR

    US must ensure mission partner data security for collaborative warfare

    When building a coalition of partners, the Pentagon can't just connect allies directly to its classified networks.

  • L3Harris awarded nearly $12.8M for Eglin AN/FPS-85 radar work

    September 20, 2019 | International, Aerospace

    L3Harris awarded nearly $12.8M for Eglin AN/FPS-85 radar work

    The radar, located at Eglin Air Force Base in Florida, performs detection, target recognition, acquisition and tracking of many space objects. Sept. 19 (UPI) -- L3Harris Technologies has been awarded a $12.8 million in a contract for sustainment support of the Eglin AN/FPS-85 radar in the Air Force Space Command Space Surveillance Network. The contract, announced Wednesday by the Department of Defense, applies to a previously awarded contract to L3 Harris Technologies, Colorado Springs, Colorado for sustainment support of the radar. The Eglin AN/FPS-85 Radar is a computer-controlled, phased-array radar set operating in the Air Force Space Command Surveillance Network that performs detection, target recognition, acquisition and tracking of many space objects. The radar operates at Site C-6 Eglin Air Force Base as part of the weapon systems for the 20th Space Control Squadron to conduct space object identification and intelligence in support of space domain control. Earlier this year, the 20th Space Control Squadron celebrated the 50th anniversary of the AN/FPS radar since space operation began for the AN/FPS-85 Space Track Radar in February 1969. Work on the new contract will be performed at Eglin Air Force Base, Fla, where the radar is located, with a completion date of June 30, 2020. https://www.upi.com/Defense-News/2019/09/19/L3Harris-awarded-nearly-128M-for-Eglin-ANFPS-85-radar-work

  • New Ransomware Group Exploiting Veeam Backup Software Vulnerability

    July 10, 2024 | International, Security

    New Ransomware Group Exploiting Veeam Backup Software Vulnerability

    New ransomware group EstateRansomware exploits Veeam software vulnerability, uses dormant VPN accounts for initial access, and deploys persistent back

All news