MISSILE DEFENSE AGENCY

Lockheed Martin Rotary and Mission Systems, Moorestown, New Jersey, is being awarded a sole-source, cost-plus-incentive-fee contract modification (P00345) under previously awarded contract HQ0276-10-C-0001. The total value of this contract modification is $139,663,509. The total value of the contract increases from $3,024,726,153 by $139,663,509 to $3,164,389,662. This modification provides for scope supporting Aegis Ballistic Missile Defense, including additional upgrades to Baseline 5.4, flight test, ground test, post-certification engineering, in-service support, and future studies. This contract modification contains a three month option period which, if exercised, will increase the cumulative value of this contract to $3,210,363,559. Work will be performed in Moorestown, New Jersey, with an expected completion date of July 31, 2020. If all options are exercised, the period of performance would extend through Oct. 31, 2020. Fiscal 2019 and 2020 research, development, test and evaluation; fiscal 2018, 2019 and 2020 procurement defense wide; and fiscal 2020 operations and maintenance funds in the amount of $12,080,453 will be obligated at the time of award. The Missile Defense Agency, Dahlgren, Virginia, is the contracting activity.

NAVY

General Dynamics Mission Systems, Pittsfield, Massachusetts, is awarded a $90,686,673 cost-plus-incentive-fee, cost-plus-fixed-fee and firm-fixed-price contract for sustainment of the Littoral Combat Ship Integrated Combat Management System and associated combat system elements. The work includes development, integration, test and delivery of future combat system baseline upgrades for in-service ships; supporting ship integration, installation and checkout; developmental test/operational test; developing training and logistics products; providing field technical support for the combat system; providing hardware engineering and equipment procurement; providing life-cycle supportability engineering; and providing fleet support for fielded baselines. Work will be performed in Pittsfield, Massachusetts (79.4%); San Diego, California (19.3%); and Mobile, Alabama (1.3%), and is expected to be completed by October 2024. This contract includes options, which, if exercised, would bring the cumulative value of this contract to $393,837,142. Work is expected to be complete by October 2024. Fiscal 2018 other procurement (Navy) funding in the amount of $1,013,124 will be obligated at the time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1); only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, District of Columbia., is the contracting activity (N00024-20-C-5603).

Management Services Group Inc., doing business as Global Technical Systems,* Virginia Beach, Virginia, is awarded an $83,726,453 cost-plus-fixed-fee, firm-fixed-price, and cost-only contract modification to previously awarded contract N63394-19-C-0008 to exercise options for the sustainment of the Common Processing System. This option exercise is for production and installation of ordnance alteration (ORDALT) kits and associated engineering services, logistics and incidental materials in support of the Common Processing System. ORDALT kits are anticipated to be installed on Aegis destroyers, Aegis cruisers, Landing Helicopter Deck, Landing Ship Dock, aircraft carriers and Japanese destroyers. Work will be performed in Norfolk, Virginia (21%); San Diego, California (16%); Yokosuka, Japan (11%); Honolulu, Hawaii (8%); Dahlgren, Virginia (6.5%); Wallops Island (6.5%); Aegis Ashore (5%); Everett, Washington (5%); Mayport, Florida (5%); Moorestown, New Jersey (5%); Port Hueneme, California (5%); Washington, District of Columbia (3%); Rota, Spain (3%); Deveselu, Romania (2.5%); and Redzikowo, Poland (2.5%), and is expected to be complete by October 2020. This contract includes options, which, if exercised, would bring the cumulative value of this contract to $116,436,973 and be complete by July 2024. Fiscal 2014 shipbuilding and conversion (Navy) funding for $1,483,823 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Surface Warfare Center, Port Hueneme Division, Port Hueneme, California, is the contracting activity.

Dyncorp International LLC, Fort Worth, Texas, is awarded a $56,496,749 modification (P00033) to a previously awarded firm-fixed-price, cost-plus-fixed-fee, cost-reimbursable contract (N68936-17-C-0052). This modification exercises an option that provides aircraft maintenance, modification and aircrew support. This modification includes organizational-level aircraft maintenance and logistics support on aircraft, systems/subsystems, aircrew systems, search-and-rescue equipment and support equipment for P-3 Orion, C-130 Hercules, F/A-18 Hornet, E/A-18 Growler, AV-8B Harrier II and H-60 Seahawk for the Naval Test Wing Pacific. Work will be performed in China Lake, California (50%); Point Mugu, California (40%); Hickman Air Force Base, Hawaii (2%); Lemoore, California (2%); Patrick Air Force Base, Florida (1%); Holloman Air Force Base, New Mexico (1%); Patuxent River, Maryland (1%); Yuma, Arizona (1%); Miramar, California (1%) and North Island, California (1%), and is expected to be completed in October 2020. Fiscal 2020 working capital (Navy) funds for $42,121,234 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center, Weapons Division, China Lake, California, is the contracting activity.

General Dynamics Information Technology Inc., Fairfax, Virginia, is awarded a $46,103,818 modification (P00024) to a previously awarded indefinite-delivery/indefinite-quantity contract (W15QKN-15-D-0001) to execute Award Term 4 for integrated logistics support for multiple Foreign Military Sales customers. Work will be performed at Patuxent River, Maryland (52%); Mechanicsburg, Pennsylvania (5.5%); Philadelphia, Pennsylvania (5.5%); Jacksonville, Florida (2.5%); Pensacola, Florida (2.5%); various other locations within the continental U.S. (4%); Kuwait City, Kuwait (24%); Atsugi, Japan (1%) Iwakuni, Japan (1%); Koahsiung, Taiwan (1%); and Cairo, Egypt (1%), and is expected to be completed in October 2020. No funds will be obligated at time of award. Funds will be obligated on individual task orders as they are issued. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity.

Boston Consulting Group, Bethesda, Maryland, is awarded a $16,054,435 modification (P00007) to a previously issued firm-fixed-price order (N00421-19-F-0106) against a General Services Administration, Federal Supply Schedule contract (GS-10-F-0253V). This modification exercises the option to continue the implementation of a new Naval Sustainment System (NSS) to include the development of governance, coordination and accountability mechanisms across the Naval Aviation Enterprise. The Commander for the Fleet Readiness Center's contribution to the NSS will deploy commercial maintenance best practices, tailored to the Navy's operational requirements and starting position; in order to reduce component repair and heavy maintenance periodic maintenance inspection turnaround times and better enable aviation readiness recovery. Work will be performed in Bethesda, Maryland, and is expected to be completed in April 2020. Fiscal 2020 operation and maintenance (Navy) funds for $16,054,435 will be obligated at time of award, all of which will expire at the end of the fiscal year. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity.

Raytheon Co., Tewksbury, Massachusetts, is awarded an $11,517,079 cost-plus-fixed-fee and cost-plus-incentive-fee modification to a previously awarded contract N00024-17-C-5145 to exercise options for DDG 1000 ship class integrated logistics support and engineering services. The DDG 1000 ship class is a multi-mission surface combatant designed to fulfill volume firepower and precision strike requirements. DDG 1000 combat systems provide offensive, distributed and precise firepower, and long ranges in support of forces ashore, while incorporating signature reduction, active and passive self-defense systems and enhanced survivability features. Work will be performed in Portsmouth, Rhode Island (51%); Tewksbury, Massachusetts (21%); San Diego, California (11%); Nashua, New Hampshire (6%); Bath, Maine (5%); Los Angeles, California (3%); Marlboro, Massachusetts (2%); and Fort Wayne, Indiana (1%), and is expected to be completed by October 2020. Fiscal 2020 research, development, test and evaluation (Navy); and operation and maintenance (Navy) funding for $3,164,948 will be obligated at time of award, and funds for $712,934 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

The Boeing Co., St. Louis, Missouri, is awarded a $10,000,353 modification (P00003) to a previously awarded cost-plus-fixed-fee contract (N00019-19-C-0016). This modification extends the period of performance and increases scope to include obsolescence redesign in support of the production and delivery of Harpoon Block II missiles for the government of Saudi Arabia. Work will be performed in McKinney, Texas (63.46%); Minneapolis, Minnesota (21.61%); and St. Louis, Missouri (14.93%), and is expected to be completed in November 2019. Foreign Military Sales funds for $10,000,353 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Physical Optics Corp.,* Torrance, California, is awarded an $8,631,282 firm-fixed-price indefinite-delivery/indefinite-quantity contract. This contract provides for the design, test, production and delivery of up to 503 C-Band radar tracking transponders in support of the Aerial Targets program. Work will be performed in Torrance, California, and is expected to be completed in October 2024. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was competitively procured as a small business set-aside via an electronic request for proposal; three offers were received. The Naval Air Warfare Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-20-D-0005).

Sealift Inc., Oyster Bay, New York, is awarded an $8,592,948 modification under a previously awarded firm, fixed-price contract (N32205-17-C-3510) to fund the third one-year option period. The option will continue to provide one U.S. flagged vessel (M/V Bernard Fisher) for prepositioning and transportation of cargo for the Department of the Air Force. The current contract includes a 12-month base period, four 12-month option periods, and one 212-day option period. Work will be performed worldwide, and is expected to be completed by Nov. 5, 2020. This contract option will be funded by fiscal 2020 working capital funds for $7,747,740; and fiscal 2021 for $845,208, for a total amount of $8,592,948. Military Sealift Command, Norfolk, Virginia, is the contracting activity (N32205-17-C-3510).

DEFENSE LOGISTICS AGENCY

Raytheon Co., Marlborough, Massachusetts, has been awarded a maximum $36,306,061 firm-fixed-price contract for multiple radar equipment components. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-time procurement contract with no option periods. Locations of performance are Virginia and Massachusetts, with a June 14, 2022, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2020 Navy working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Mechanicsburg, Pennsylvania (SPRMM1-20-F-DK02).

Rockwell Collins Inc., Cedar Rapids, Iowa, has been awarded a maximum $35,902,768 firm-fixed-price contract for control display units. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five-year contract with no option periods. Location of performance is Iowa, with an Oct. 31, 2024, performance completion date. Using military service is Army. Type of appropriation is fiscal 2020 Army working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Redstone Arsenal, Alabama (SPRRA1-20-D-0003).

AIR FORCE

The Boeing Co., Layton, Utah, has been awarded a $22,571,000 firm-fixed-price contract modification (P00009) to previously award contract FA8204-19-C-0001 for ICBM Cryptography Upgrade Increment II (ICU II) production. This modification exercises production Lot 2, Option 1 and provides the government 54 A-4 drawers. Work will be performed at Huntsville, Alabama; Huntington Beach, California; and Layton, Utah, and is expected to be completed by Jan. 12, 2022. The total cumulative face value is $104,213,725. Fiscal 2019 missiles procurement funds in the amount of $1,826,000; and fiscal 2020 missiles procurement funds in the amount of $20,745,000 are being obligated at the time of award. The Air Force Nuclear Weapons Center, ICBM Contracting Division, Hill Air Force Base, Utah, is the contracting activity.

Raytheon Co., Tewksbury, Massachusetts, has been awarded a $22,250,138 cost-plus-incentive-fee contract modification (P00039) to previously awarded FA8730-15-C-0002 for the Qatar Air Missile Defense Operation Center (ADOC). The contract modification is for the procurement of the outside continental U.S. transfer of ADOC prime mission equipment (PME), installation of ADOC PME, integration activities, training of ADOC operators, and development of a communications cabinet. Work will be performed in Tewksbury, Massachusetts; and Qatar, and is expected to be completed by May 31, 2020. This modification involves 100 percent foreign military sales to Qatar. Total cumulative face value of the contract is $303,037,178. Foreign Military Sales funds in the amount of $22,250,138 are being obligated at the time of the award. The Air Force Life Cycle Management Center, Hanscom Air Force Base, Massachusetts, is the contracting activity.

L3Harris Technologies Inc., Colorado Springs, Colorado, has been awarded a $9,331,526 cost-plus-incentive-fee contract modification (P01025) to a previously awarded contract F19628-02-C-0010 for sustainment of the Ground-Based Electro Optical Deep Space Surveillance (GEODSS) weapons system. Work will be performed at White Sands Missile Range, New Mexico; Diego Garcia, British Indian Ocean Territory; Maui, Hawaii; and Colorado Springs, Colorado, and is expected to be completed by June 30, 2020. The total cumulative face value is $9,331,516. Fiscal 2020 operations and maintenance funds in the amount of $3,463,000 are being obligated at time of award. The Space and Missile Systems Center, Peterson Air Force Base, Colorado Springs, Colorado, is the contracting activity.

ARMY

Olsson Industrial Electric Inc., Springfield, Oregon, was awarded a $14,644,904 firm-fixed-price contract to replace the four main unit 15kV switchgear line-ups, replace the 480V station service switchgear, replace the unwatering/sump pumps and motors, transformer deluge containment, rehab of transformer fire protection system, replace the governor kidney loop system and install new generator step up transformers at the Robert S. Kerr Reservoir Powerhouse. Bids were solicited via the internet with two received. Work will be performed in Keota, Oklahoma, with an estimated completion date of July 31, 2021. Fiscal 2010 operations and maintenance; and civil works funds in the amount of $14,644,904 were obligated at the time of the award. U.S. Army Corps of Engineers, Tulsa, Oklahoma, is the contracting activity (W912BV-20-C-0002).

Thoma-Sea Marine Constructors,* Houma, Louisiana, was awarded an $8,731,775 firm-fixed-price contract for planning, scheduling, engineering, construction, testing and delivery of an inland z-drive workboat. Bids were solicited via the internet with three received. Work will be performed in Olmsted, Illinois, with an estimated completion date of March 9, 2022. Fiscal 2019 civil works and civil construction funds in the amount of $8,731,775 were obligated at the time of the award. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-20-C-0002).

*Small Business

https://www.defense.gov/Newsroom/Contracts/Contract/Article/2005134/source/GovDelivery/

On the same subject

  • Six small simulation companies rack up $1M contracts after ‘Shark Tank’-style pitches to US Air Force

    December 6, 2019 | International, Aerospace

    Six small simulation companies rack up $1M contracts after ‘Shark Tank’-style pitches to US Air Force

    ORLANDO, Fla. — On Wednesday, six small businesses pitched U.S. Air Force acquisition leaders on unique training and simulation technologies, each walking away with a $1 million contract in as little as 20 minutes. The inaugural Simulators Pitch Day at the Interservice/Industry, Training, Simulation and Education Conference was the third “Shark Tank”-style event held by the service in the hopes of broadening its industrial base to include small companies, startups and other firms that don't typically work with the government. “I thought what they presented was awesome. But actually I felt a sense of accomplishment, which is something that we sometimes don't feel in acquisitions because it often takes forever to get something done,” said Col. Phillip Carpenter, the Air Force's senior materiel leader for the simulators program office. During a Thursday event that allowed the six companies to take a victory lap by pitching their products to an audience of Air Force and industry officials attending the conference, Carpenter recounted how he felt presenting each company with funding meant to help further develop their products. “The looks on their faces — I know the feelings that they felt about the opportunity to participate with us in our mission. In 25 years of doing acquisitions it was probably one of the greatest feelings I've ever had,” he said. Although the Air Force didn't limit the types of technologies that companies could pitch, it sought out several specific technologies including high-end weather effects for gaming environments, high-fidelity simulators that could be deployed to austere locations, cloud-based simulators and artificial intelligence-aided instruction tools. In the end, Perceptronics Solutions, Information Systems Laboratories, DTI, PlaneEnglish, Take Flight and King Crow Studios were chosen to present 10-minute proposals during a closed-door session with Air Force acquisition officials. The technologies presented by the companies covered a wide variety of niche gaps in the simulation industry. DTI pitched a stereoscopic 3D display that doesn't require specialized 3D glasses — something the company believes might one day be a useful upgrade for the remote vision system used by KC-46 boom operators. Plane English proposed an aviation radio simulation for aircrews to familiarize themselves with radio chatter. The other pitches were: Take Flight Interactive's virtual flight instructor. Perceptronics' assessment tool called Train DX, which brings together instructor evaluations, biometrics and data from simulators and other training tools to create a “report card.” King Crow Studios' virtual reality trainer to teach advanced tactics to pilots. Information Systems Laboratories' plug-and-play “sidecar” for flight simulators that better imitates the effects of radar and electronic warfare systems. “I want to let some of the small companies that might be in the room know that if you're thinking about doing Pitch Day next year, it really wasn't that terrifying,” said Greg Carter, vice president of Information Systems Laboratories. “I really didn't sleep the night before,” he said, joking that he had nightmares where Carpenter transformed into Shark Tank host Mark Cuban. “[After winning], I slept much better.” https://www.defensenews.com/digital-show-dailies/itsec/2019/12/05/six-small-simulation-companies-rack-up-1m-contracts-after-shark-tank-style-pitches-to-us-air-force

  • Production of one of the F-35′s most anticipated bombs has been on hold for almost a year

    June 15, 2020 | International, Aerospace

    Production of one of the F-35′s most anticipated bombs has been on hold for almost a year

    By: Valerie Insinna WASHINGTON — Deliveries of a new precision-guided bomb under development by Raytheon for the F-35 and other fighter jets have been at a standstill for about a year as the company struggles to correct a technical problem involving a key component. A fix for the issue, which brought production of the Small Diameter Bomb II to a halt in July 2019, could be approved by the government as soon as July, said Air Force spokesman Capt. Jake Bailey in response to questions by Defense News. However, a June report by the Government Accountability Office pointed out that continued technical issues have already caused a delay in fielding the munition, with Raytheon forced to redesign a key component and retrofit all 598 bombs already delivered to the Air Force and Navy. The Small Diameter Bomb II — also known as the GBU-53 StormBreaker — was designed with a tri-mode seeker that includes a millimeter wave radar, imaging infrared and semi-active laser that allow the weapon to engage targets in all weather conditions and environments where visibility is obscured by dust and debris. The Air Force and Navy plan to integrate SDB II with a range of fighter aircraft including the F-15, F/A-18 Super Hornet and F-35 joint strike fighter, but the munition has been mired in development for more than a decade. This latest stoppage in production was prompted by internal audits by Raytheon, which found that the clips used to hold the bomb's fins in place “suffered vibration fatigue over long flight hours,” Bailey said. The clips serve “as the backup fin storage device” used to keep the fins in place in case other components fail, noted Bailey, who added that there have been no incidents during tests involving the SDB II fins inadvertently deploying. However, the GAO wrote that the premature deployment of the fins, which help guide the bomb in flight, could damage the weapon as well as cause a safety hazard for the aircraft carrying it. “While this problem could affect all aircraft carrying the bomb, officials said the greatest impact is to the F-35, because the bomb is carried in the aircraft's internal weapons bay and could cause serious damage if the fins deploy while the bomb is in the bay,” the GAO stated. Raytheon declined to comment on this story, directing questions to the Air Force. Raytheon plans on mitigating the issue with a newly designed clip that reduces the vibration of the fins, and will completely pay for developing the fix and retrofitting it on the bombs that have already been delivered, the GAO said. The Air Force confirmed that testing of the new device has already been completed and is going through final reviews. But while Raytheon and the Air Force had hoped to restart production in April, travel restrictions caused by the ongoing global COVID-19 pandemic contributed to further delays. The government now hopes to approve the fix in July, after which production will restart and the retrofit process for existing bombs will begin. “The fin clip failure is the sole reason production was partially halted; once final government approval is obtained, ‘all up round' production can resume,” Bailey said, using a phrase that describes a fully assembled weapon. The Air Force estimates that retrofits will be completed by August, as Raytheon's supplier has already begun manufacturing the replacement component, which are easily installed on the outside of the weapon. “Until production resumes, the total Lot 3 deliveries remain at 204 of the 312 assets on contract,” Bailey said. All this puts initial operational capability at least a year later than the service's original timeline, which predicted IOC would occur in September 2019. The Air Force declined to name a current estimate for when IOC would be achieved, but said it would happen after a separate milestone known as the “initial fielding decision,” which involves the approval of the head of Air Combat Command and is set for the third quarter of 2020. The issue with SDB II's fins is just one of several technical problems with which Raytheon is grappling. The program completed operational tests in 2019, but hardware and software changes are needed after 11 failures were reported. Two hardware fixes have already been put in place, and eight failures were related to software problems that will be addressed in future updates, the GAO said. The sole outstanding issue involves an anomaly with SDB II's guidance system. Fixing it could require Raytheon to redesign the component and conduct retrofits on all bombs already delivered, according to GAO. A review board of the problem is in the “final stages of analysis,” Bailey said. The Air Force and Raytheon plan to establish whether a replacement component is necessary no later than June 30. Although the weapon has not even been officially fielded, some components are already becoming obsolete. A Raytheon subcontractor that makes circuit cards used in the guidance system is expected to stop producing those components years sooner than anticipated. As a result, that the Defense Department may have to order all circuit cards needed for the program of record before December, according to the GAO. That timeline has now been extended to January 2022, “which provides ample time for program office action before the new deadline,” Bailey said. Despite the bomb's ongoing problems, Raytheon continues to rake in contracts for the program. In February, the Defense Department awarded a $15 million increase to a previous SDB II contract for additional technical support. In September, the company received a $200 million contract for lifecycle support during the bomb's engineering and manufacturing development phase. According to a Raytheon news release, the Navy recently completed the first guided release of SDB II from a F/A-18E/F Super Hornet. https://www.defensenews.com/air/2020/06/12/production-of-one-of-the-f-35s-most-anticipated-bombs-has-been-on-hold-for-almost-a-year

  • Space Development Agency demonstrates Link 16 satellite connectivity

    November 28, 2023 | International, Land

    Space Development Agency demonstrates Link 16 satellite connectivity

    The agency conducted a series of demonstrations from Nov. 21 to 27, transmitting signals from satellites in low Earth orbit to a ground-based test site.

All news