Back to news

December 14, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

Contract Awards by US Department of Defense - December 12, 2018

NAVY

Clark Construction Group LLC, Bethesda, Maryland, is awarded a $298,211,055 firm-fixed-price construction contract to construct a VC-25B hangar complex. The contract provides for the construction of a hangar complex, an aircraft access taxiway/parking apron, associated lighting, engine run-up pads, and a hydrant refueling system with storage tanks. Additional requirements include, but are not limited to, site preparation, wetland/stream mitigation, storm water management, a parking lot, and a fire detection, and suppression system. This contract contains options, which if exercised, will bring the contract value to a ceiling of $315,481,000. Work will be performed at Joint Base Andrews, Camp Springs, Maryland, and is expected to be completed April 2022. Fiscal 2018 and 2019 military construction (Air Force) contract funds in the amount of $220,000,000 are obligated on this award and will not expire at the end of the current fiscal year. This contract was the result of a competitive acquisition via the Navy Electronic Commerce Online website, with 10 proposals received. The Naval Facilities Engineering Command Washington, Washington, District of Columbia, is the contracting activity (N40080-19-C-0008).

Bell Boeing Joint Project Office, Amarillo, Texas, is awarded $18,000,000 for modification P00004 to a previously awarded cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract (N00019-18-D-0103) to exercise an option for technical analysis, engineering and integration on V-22 aircraft platform for the Navy, Marine Corps,. Air Force, and the government of Japan under the Foreign Military Sales program. Work will be performed in Fort Worth, Texas (50 percent); and Philadelphia, Pennsylvania (50 percent), and is expected to be completed in December 2022. No funds are being obligated at time of award, funds will be obligated on individual delivery orders as they are issued. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Edison Chouest Offshore, Cut Off, Louisiana, is awarded $7,374,825 to exercise an option under previously awarded firm-fixed-price contract (N3220517C3513) with reimbursable elements for one maritime support vessel. This vessel will be utilized to launch, recover, refuel, and resupply of small crafts in the U.S. Pacific Command's (USPACOM) area of responsibility. This contract includes a 12-month base period, three 12-month option periods, and one 11-month option period. This is option one of the current contract. If all options are exercised this would bring the cumulative value of the contract to $41,079,507. Work will be performed in the USPACOM's area of responsibility, and is expected to be completed Dec. 22, 2019. If all options are exercised, work will continue through Nov. 22, 2022. Navy working capital funds in the amount of $6,018,015 are obligated for fiscal 2019 and will expire at the end of current fiscal year. This contract was competitively procured with 50-plus proposals solicited via the Federal Business Opportunities website, with five offers received. The U.S. Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity.

DEFENSE LOGISTICS AGENCY

General Electric – Aviation, Lynn, Massachusetts, has been awarded a maximum $157,731,567 fixed-price prospective redetermination, requirements contract for holistic engine support of the T64 aircraft engine. This was a sole-source acquisition using justification 10 U.S. Code. 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five and a half year base contract with one five-year option period. Location of performance is Massachusetts, with a June 6, 2024, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is Defense Logistics Agency Aviation, Richmond, Virginia (SPE4AX-19-D-9400).

Michelin North America Inc., Greenville, South Carolina, has been awarded an estimated $42,246,789 fixed-price, indefinite-delivery, requirements contract for aircraft tires supporting the Global Tire Program. This is a three-year contract with no option periods. Location of performance is South Carolina, with a Dec. 11, 2021, performance completion date. Using military services are Army, Navy, Air Force, and Marine Corps. Type of appropriation is fiscal 2019 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7LX-19-D-0043).

Goodyear Tire and Rubber Co., Akron, Ohio, has been awarded an estimated $35,168,525 fixed-price, indefinite-delivery, requirements contract for aircraft tires supporting the Global Tire Program. This was a competitive acquisition with two offers received. This is a three-year contract with no option periods. Location of performance is Ohio, with a Dec. 11, 2021, performance completion date. Using military services are Army, Navy, Air Force, and Marine Corps. Type of appropriation is fiscal 2019 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7LX-19-D-0051).

Michelin North America Inc., Greenville, South Carolina, has been awarded a maximum $19,960,116 firm-fixed-price, indefinite-quantity, requirements contract to provide tire support for the Global Tires Program. This was a competitive acquisition with two responses received. This is a three-year contract with no option periods. Location of performance is South Carolina, with a Dec. 11, 2021, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7LX-19-D-0054).

ARMY

Lockheed Martin Corp., Orlando, Florida, was awarded a $13,364,769 modification (P00002) to Foreign Military Sales (Saudi Arabia) contract W900KK-17-C-0040 for modernization of a number of live fire ranges; support of infrastructure; procurement of installation of targets for ranges; automated shoothouse; urban assault course; range control systems; spare parts, and new equipment training courses. One bid was solicited with one bid received. Work will be performed in Orlando, Florida and Swanee, Georgia, with an estimated completion date of Feb. 28, 2021. Fiscal 2019 foreign military sales funds in the amount of $13,364,769 were obligated at the time of the award. U.S. Army Contracting Command, Orlando, Florida, is the contracting activity.

URS Federal Services Inc., Germantown, Maryland, was awarded a $9,742,253 modification (P00129) to contract W58RGZ-16-C-0001 for aviation maintenance. Work will be performed in Fort Campbell, Kentucky; Louisville, Tennessee; and Fort Polk, Louisiana, with an estimated completion date of June 29, 2019. Fiscal 2019 aircraft procurement, Army; and operations and maintenance, Army funds in the amount of $9,742,253 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

AIR FORCE

Galois Inc., Portland Oregon, has been awarded an $8,589,384 cost-plus-fixed-fee (completion) contract for merged-analysis-to-prevent-exploits software, testing and demonstrations. This contract provides for a software system that will enable computers and humans to collaboratively reason over software artifacts with the goal of finding zero-day vulnerabilities at a scale and speed appropriate for the complex software ecosystem. Work will be performed in Portland, Oregon, and is expected to be completed by May 31, 2021. This award is the result of a competitive acquisition and 50 offers were received. Fiscal 2019 research, development, test and evaluation funds in the amount of $1,321,974 are being obligated at the time of award. Air force Research Laboratory, Rome, New York, is the contracting activity (FA8750-19-C-0004).

*Small business

https://dod.defense.gov/News/Contracts/Contract-View/Article/1712047/

On the same subject

  • HENSOLDT leads new radar consortium

    July 6, 2020 | International, C4ISR

    HENSOLDT leads new radar consortium

    Taufkirchen, July 1, 2020 – Sensor system supplier HENSOLDT has been awarded a contract by Airbus Defence and Space to develop and produce a new AESA (= Active Electronic Scanning Array) radar for the German and Spanish Eurofighter fleets. The project is jointly financed by the Eurofighter partner nations Spain and Germany, who will also be the first users of the radar in their fleets. Following budget approval by the Spanish government and most recently by the German Bundestag in mid-June, the contracts worth over 1.5 billion euros have now been signed. "The fact that Germany and Spain are taking a pioneering role in the modernization of the Eurofighter is a signal of confidence in European defense cooperation," said HENSOLDT CEO Thomas Müller. "This decision ensures that our armed forces will continue to be able to fulfill their mission in the future while being protected in the best possible way." The contracts cover the German-Spanish new development of core components of the Eurofighter radar – including a digital multi-channel receiver and transmitter/receiver modules of the antenna – and the equipping of approximately 130 Eurofighter aircraft of tranches two and three. The development is being carried out by a Spanish-German industrial consortium under German leadership with the support of the Eurofighter nations Great Britain and Italy. HENSOLDT has already been involved in the development and production of the Eurofighter sensor technology currently in use. At its radar centre in Ulm, HENSOLDT currently employs 2,200 people, and in the Eurofighter radar sector alone, the company expects to create 400 highly qualified jobs over the entire programme period. The sensor specialist is also investing around 15 million euros in the necessary capacity expansion, primarily at the Ulm site. About HENSOLDT HENSOLDT is a pioneer of technology and innovation in the field of defence and security electronics. Based in Taufkirchen near Munich, the company is a German Champion with strategic leadership positions in the field of sensor solutions for defence and non-defence applications. HENSOLDT develops new products to combat a wide range of threats based on innovative approaches to data management, robotics and cyber security. With approximately 5,500 employees, HENSOLDT generated revenues of 1.14 billion euros in 2019. www.hensoldt.net Press contact Joachim Schranzhofer Tel.: +49 (0) 89.51518.1823 joachim.schranzhofer@hensoldt.net View source version on HENSOLDT: https://www.hensoldt.net/news/hensoldt-leads-new-radar-consortium/

  • Poland buys hundreds of Naval Strike Missiles in $2 billion deal

    September 5, 2023 | International, Land

    Poland buys hundreds of Naval Strike Missiles in $2 billion deal

    The contract will enable the military to boost its coastal defense capabilities along the Baltic Sea.

  • COVID Disrupts Network Tests – But Army Presses On

    May 12, 2020 | International, Land, C4ISR

    COVID Disrupts Network Tests – But Army Presses On

    The Army pushed hard to field-test new tech with real soldiers. Then came the coronavirus. Now the service will have to rely much more on lab testing. By SYDNEY J. FREEDBERG JR.on May 11, 2020 at 5:11 PM WASHINGTON: The Army is taking a calculated risk to field much-needed network upgrades known as Capability Set 21 on time next year. To do that, the service needs to start buying radios, computers, satellite terminals, and much more in bulk this year so it can start fielding them to four combat infantry brigades in early 2021. Many Army weapons programs are staying on schedule because they're still doing digital design work and long-term R&D, much of which can be done online. But Capability Set 21 is so far along that much of its technology was already in field tests with real soldiers — testing that has been badly disrupted by precautions against the COVID-19 pandemic. As a result, said Maj. Gen. David Bassett, Program Executive Officer for Command, Control, & Communications – Tactical (PEO-C3T), the Army may have to rely on more testing data from the lab to make up for limited testing in the field. “As soon as we possibly can, we're going to get this back in the hands of soldiers,” Basset told the C4ISRNet online conference last week. “In the meantime, we know an awful lot from the lab-based risk reduction that we've done.” “The risk,” he said, “is pretty manageable.” Risk & Return The field tests done before the pandemic, combined with extensive lab tests, should be enough to prove the technology will work, Bassett said. In fact, the Army already largely decided what technologies to buy for the upgrade package known as Capability Set 21, he said. What it still wanted soldiers to figure out in field tests, he said, was how they would use it in the field. That feedback from those “soldier touchpoints” would help both fine-tune the tech itself and figure out exactly how much to buy of each item – say, single-channel radios versus multi-channel ones — for each unit. Going ahead without all the planned field-testing means the Army will have to make more fixes after the equipment is already fielded, a more laborious, time-consuming, and costly process than fixing it in prototype before going into mass production. It may also mean the Army initially buys more of some kit than its units actually need and less than needed of other items. But CS 21 is a rolling roll-out of new tech to four brigades a year, not a once-and-done big bang, Bassett explained. So if they buy too much X and too little Y for the first brigade or two, he said, they can adjust the amounts in the next buy and redistribute gear among the units as needed. It's important to make clear that the Army's new technologies have already gone through much more hands-on field testing from actual soldiers than any traditional program, and have improved as a result. In the most dramatic example — not from CS 21 itself but a closely related system — blunt feedback from soldiers and quick fixes by engineers led to major improvements in prototype IVAS augmented reality goggles, a militarized Microsoft HoloLens that can now show soldiers everything from live drone feeds to a cross-hairs for targeting their rifle. Doing such “soldier touchpoints” early and often throughout the development process is central to the 20-year-month Army Futures Command's attempt to fix the service's notoriously disfunctional acquisition system. But to stem the spread of the COVID-19 coronavirus, the Army – like businesses, schools, and churches around the world – has dramatically cut down on routine activities. “Units are either not training, or they're training with significant control measures put in place – social distancing, protective equipment, and things like that,” said Maj. Gen. Peter Gallagher, head of the Network Cross Functional Team at Army Futures Command. That's disrupted the “access to soldiers and the feedback loop that's been so critical to our efforts.” Nevertheless, the Army feels it has enough data to move ahead. It may also assess that the risk of moving ahead – even it requires some inefficient fixes later – is lower than the risk of leaving combat units with their existing network tech, which is less capable, less secure against hacking and less resilient against physical or electronic attack. 2021 And Beyond Capability Set 21 focuses on the Army's light infantry brigades, which don't have many vehicles to carry heavy-duty equipment, as well as rapidly deployable communications units called Expeditionary Signal Battalions. It includes a significant increase in the number of ground terminals for satellite communications, the generals said, though not quite as many as they'd hoped to be able to afford. It'll be followed by Capability Set 23, focused on medium and heavy mechanized units riding in 20-plus ton 8×8 Strykers and 40-plus-ton tracked vehicles. While units with lots of vehicles can carry much more gear, they also cover much larger distances in a day. That means CS 23 will include much more long-range communications through satellites in Low and Medium Earth Orbit, “which give us significantly more bandwidth at lower latency,” Gallagher said. “In some cases, it's almost having fiber optic cable through a space-based satellite link.” Even with CS 21 still in final testing, the Army's already gotten started on CS 23. It's reviewed over 140 white paper proposals submitted by interested companies in January, held “shark tank” pitch sessions with the most promising prospects in March, and is now negotiating with vendors. An Army slide summing up the systems being issued as part of the Integrated Tactical Network. Note the mix of Commercial Off The Shelf (COTS) and military-unique Program Of Record (POR) technologies. There has been some impact from COVID,” Gallagher said, “[but] we will have all the contracts probably let no later than July.” The chosen technologies will go into prototype testing next year, with a Preliminary Design Review of the whole Capability Set in April and a Critical Design Review in April 2022. Further Capability Set upgrades are planned for every two years indefinitely, each focusing on different key technologies and different parts of the Army. Meanwhile, Bassett's PEO shop is urgently pushing out more of its existing network tech to regular, Reserve, and National Guard troops deployed nationwide to help combat COVID-19, Bassett said. That includes everything from satellite communications links to military software on an Android phone, known as the Android Tactical Assault Kit (ATAK). Originally developed to help troops navigate and coordinate on battlefields, ATAK is now being upgraded to provide public health data like rapid updates on coronavirus cases. “Any soldier that was responding to this COVID crisis that needed network equipment, we wanted them to have a one-stop shop,” Bassett told the conference. “They would come to us and we'd go get it for them.” https://breakingdefense.com/2020/05/covid-disrupts-network-tests-but-army-presses-on

All news