Back to news

August 8, 2019 | International, Aerospace, Naval, Land, C4ISR, Security

Contract Awards by US Department of Defense - August 7, 2019

AIR FORCE

United Launch Services, Centennial, Colorado, has been awarded a $156,752,771 firm-fixed-price modification (P00003) to previously awarded contract FA8811-19-C-0002 for National Security Space Launch Delta IV Heavy Launch services. This modification provides for launch vehicle production services for National Reconnaissance Office (NRO) Launch Mission Three, the last of three planned NRO launch missions under this contract. This modification brings the total cumulative face value of the contract from $310,784,574 to $467,537,345. Work will be performed in Centennial, Colorado; Decatur, Alabama; and Cape Canaveral Air Force Station, Florida, and is expected to be completed by January 2024. Fiscal 2019 missile procurement funds in the amount of $144,637,202 are being obligated at the time of award. The Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity. (CORRECTION: The May 9, 2019, announcement of this contract's modification for Launch Mission Two incorrectly stated the total cumulative face value of the contract at the time as $449,813,010. The actual total cumulative value was $310,784,574.)

Northrop Grumman Aerospace Systems, Redondo Beach, California, has been awarded a $22,500,000 cost-plus incentive-fee modification (P00017) to previously awarded contract FA8808-18-C-0002 for changes to the payload driven by selection of a host space vehicle. The contract provides for the delivery of two Enhanced Polar System Recapitalization (EPS-R) payloads. Work will be performed at Redondo Beach, California, and is expected to be completed by December 2023. Fiscal 2019 research and development funds in the amount of $5,900,000 are being obligated at the time of award. The Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity.

TFAB Defense Systems LLC,* Warner Robins, Georgia, was awarded an $8,918,791 firm-fixed-price contract for engineering services. This contract provides for develop the software, test hardware and related documentation for test program sets for use with the Air Force's Versatile Depot Automatic Test Station family of testers to isolate failures within line replaceable units and shop replaceable units. Work will be performed at Warner Robins, Georgia, and is expected to be completed by Aug. 6, 2022. This award is the result of a Small Business Set Aside sole-source acquisition. No funds are being obligated at time of award. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity for contract (FA8571-19-D-A003).

ARMY

Southwest Valley Constructors Co., Albuquerque, New Mexico, was awarded an $80,869,000 contract for design-build horizontal construction in support of the Department of Homeland Security in McAllen, Texas. Three bids were solicited with three bids received. Work will be performed in McAllen, Texas, with an estimated completion date of April 28, 2021. Fiscal 2019 Department of Homeland Security funds in the amount of $80,869,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Fort Worth, Texas, is the contracting activity (W9126G-19-C-0118).

Oshkosh Defense LLC, Oshkosh, Wisconsin, was awarded an $11,812,335 modification (P00240) to contract W56HZV-15-C-0095 for Authorized Stockage List. Work will be performed in Oshkosh, Wisconsin, with an estimated completion date of April 30, 2021. Fiscal 2018 and 2019 other procurement, Army and procurement Marine Corps funds in the combined amount of $11,812,335 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity.

Stantec Consulting Services Inc., Louisville, Kentucky, was awarded a $9,000,000 firm-fixed-price contract for geotechnical services. Bids were solicited via the internet with six received. Work locations and funding will be determined with each order, with an estimated completion date of Aug. 7, 2024. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-19-D-0046).

NAVY

Data Link Solutions LLC, Cedar Rapids, Iowa, is awarded a maximum potential value $75,000,000 modification to a previously awarded indefinite-delivery/indefinite-quantity multiple award contract (N00039-15-D-0042) for the Block Upgrade II retrofit of Multifunctional Information Distribution System (MIDS) low volume terminals. The terminals provide secure, high-capacity, jam-resistant, digital data and voice communications capability for Navy, Air Force and Army platforms, and for Foreign Military Sales customers. Work will be performed in Wayne, New Jersey (50%); and Cedar Rapids, Iowa (50%), and is expected to be completed by December 2026. No funding is being obligated at the time of award. Funds will be obligated as individual delivery orders are issued. This contract modification was not competitively procured because it is a sole-source acquisition pursuant to the authority of 10 U.S. Code 2304(c)(1) - only one responsible source (Federal Acquisition Regulation subpart 6.302-1). The Naval Information Warfare Systems Command, San Diego, California, is the contracting activity and awarded the contract on behalf of the MIDS Program Office.

Oceaneering International Inc., Chesapeake, Virginia, is awarded a maximum value $34,316,273 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the Virginia class submarine sail racetracks, payload tube loading platforms and multiple all-up-round canister special support equipment ladder kits with shipping crates. Work will be performed in Chesapeake, Virginia, and is expected to be complete in August 2024. Fiscal 2019 other procurement (Navy) funding in the amount of $3,368,978 will be obligated at time of award, and not expire at the end of the current fiscal year. This contract was competitively procured in accordance with 10 U.S. Code 2304 (a) via the Federal Business Opportunities website, with two offers received. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity (N64498-19-D-4031).

Stantec Consulting Services Inc., Burlington, Massachusetts, is awarded $17,695,256 for firm-fixed-price modification to task order N40085-18-F-5881 under previously awarded contract N40085-17-D-5004 for design of a multi-mission dry dock at Portsmouth Naval Shipyard. This modification will provide for all architectural and engineering services necessary for the final design, including developing the design-bid-build solicitation documents. Work will be performed in Massachusetts (90%); and Maine (10%), and is expected to be completed by March 2021. Fiscal 2021 military construction (Navy) contract funds in the amount of $17,695,256 are obligated on this award and will not expire at the end of the current fiscal year. Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity.

RTL Networks Inc.,* Denver, Colorado, is awarded a $14,399,532 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract to provide services in the areas of cooperative cyber risk assessments and cyber table tops of fighter/attack (fixed and rotary wing) and surveillance aircraft or similarly complex aircraft, tactical unmanned aerial vehicles, GPS guided weapons or similarly complex weapons, training simulators, Portable Electronic Maintenance Aids equipment, software and development environments, and associated communications and networks. Work will be performed in China Lake, California (50%); Placentia, California (48%); and Denver, Colorado (2%), and is expected to be completed in August 2024. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was competitively procured via an electronic request for proposal as a Service-Disabled Veteran-Owned Small Business set-aside; two offers were received. The Naval Air Warfare Center, Weapons Division, China Lake, California, is the contracting activity (N68936-19-D-0040).

The Lockheed Martin Corp., Rotary and Mission Systems, Mitchel Field, New York, is awarded $11,498,789 for cost-plus-incentive-fee modification P00018 for new scope under previously awarded contract N00030-18-C-0045 to provide U.S. Trident II (D5) Strategic Weapon System efforts for the navigation subsystem. Work will be performed in Mitchel Field, New York, with an expected completion date of Dec. 31, 2021. Fiscal 2018 research, development, tests and evaluation (Navy) funds in the amount of $11,498,789 are being obligated on this award. This contract was a sole-source acquisition pursuant to 10 U.S. Code 2304(c)(1). Strategic Systems Programs, Washington, District of Columbia, is the contracting activity.

Treadwell Corp., Thomaston, Connecticut, is awarded a not-to-exceed $7,330,400 ceiling-priced delivery order N00104-19-F-J80J under previously awarded basic ordering agreement N00104-15-G-A408 for repair of 98 items in support of the Navy's Electrolytic Oxygen Generator System. The contract is a four-year contract with no option periods. Work will be performed in Thomaston, Connecticut, and is expected to be completed by September 2023. Working capital funds (Navy) in the amount of $3,591,896 will be obligated at the time of award and funds will not expire at the end of the current fiscal year. One firm was solicited for this sole-sourced requirement under authority 10 U.S. Code 2304 (c)(1), with one offer received. Naval Supply Systems Command, Weapon Systems Support, Mechanicsburg, Pennsylvania, is the contracting activity.

*Small Business

https://www.defense.gov/Newsroom/Contracts/Contract/Article/1928698/source/GovDelivery/

On the same subject

  • Space Development Agency (SDA), HQ085021S0001

    May 12, 2021 | International, Aerospace

    Space Development Agency (SDA), HQ085021S0001

    The DoD Small Business and Technology Partnerships Office announces the opening of the following Broad Agency Announcement (BAA) topics: Space Development Agency (SDA), HQ085021S0001 SBIR Topic HQ085021S0001-09: “Compact Passive Polarimetric Microwave Radiometer and Sounder (CP2MRS),” published at: https://beta.sam.gov/opp/278bdbd122a14e82836352ede2fcbffa/view STTR Topic HQ085021S0001-10: “Compact Passive Polarimetric Microwave Radiometer and Sounder (CP2MRS),” published at: https://beta.sam.gov/opp/24591528cf5f4671a64b4ebac23b2bb5/view IMPORTANT DATES: May 12, 2021: Topic Q&A opens; BAA opens, begin submitting proposals in DSIP June 1, 2021: Topic Q&A closes to new questions at 12:00 p.m. ET June 15, 2021: BAA closes, full proposals must be submitted in DSIP no later than 12:00 p.m. ET Full topics and instructions are available at the links provided above. Topic Q&A Topic Q&A is available for proposers to submit technical questions at https://www.dodsbirsttr.mil/submissions/login beginning today, May 12, 2021. All questions and answers are posted electronically for general viewing. Topic Q&A will close to new questions on June 1, 2021 at 12:00 p.m. ET but will remain active to view questions and answers related to the topics until the BAA close. Proposers are advised to monitor Topic Q&A during the BAA period for questions and answers, and frequently monitor the beta.SAM.gov link above for updates and amendments to the topic. Learning & Support Visit the Learning & Support section for Job Aids and Help Videos to guide you through submitting and viewing questions and answers in the Topic Q&A, preparing and submitting your proposal in DSIP, and more: https://www.dodsbirsttr.mil/submissions/learning-support/training-materials DSIP Help Desk Contact Info Email: DoDSBIRSupport@reisystems.com Hours: Monday – Friday, 9:00 a.m. – 5:00 p.m. ET Thank you for your interest in the DoD SBIR/STTR Program. DoD SBIR/STTR Support Team To sign up and receive upcoming emails, please follow this link: https://secure.campaigner.com/CSB/Public/Form.aspx?fid=667492&ac=g9gk 

  • Faulty $5 Parts Cause 18-Month, $1 Billion Delay to Navy, Air Force Nuclear Upgrades

    September 26, 2019 | International, Aerospace, Naval, Land

    Faulty $5 Parts Cause 18-Month, $1 Billion Delay to Navy, Air Force Nuclear Upgrades

    Defects found in a $5 electrical component will delay the Navy and Air Force nuclear warhead refurbishment program by 18 months and cost more than $1 billion to fix, a National Nuclear Security Administration official said during a congressional hearing Wednesday. The faulty components are small commercially available capacitors that were to be used in upgrades to the Navy's W88 nuclear warheads. These weapons are deployed on the Trident II D5 submarine-launched ballistic missile systems. Similar capacitors are needed to upgrade the Air Force's B61-12 gravity bomb, Charles Verdon, deputy administrator for defense programs at the National Nuclear Security Administration, told members of the House Armed Services subcommittee on strategic forces during the unclassified portion of Wednesday's hearing. When engineers evaluated available parts, they ran tests to determine if the off-the-shelf capacitors were compatible with the systems due for upgrades, Verdon said. Initial results suggested the components would work in the short-term. “Early tests on the capacitors now in question and subsequent tests including component, major assembly and full-up integrated system flight tests demonstrated that these components meet requirement today. Industry best practices were used to stress the components beyond their design planned usage as a way to establish confidence that they will continue to work over the necessary lifetime of the warhead,” Verdon said. “During stress testing, a few of these commercially available capacitors did not meet the reliability requirements.” The problem is, these parts used in the warhead upgrades must survive for decades, up to 30 years after production, Verdon said. However, the quality of each capacitor production lot varied, which led to the stress testing failure. Instead of using the capacitors and risking readiness in the future, Verdon said his agency decided to delay the upgrade work, initially scheduled to begin in December. Replacement capacitors are being produced but will cost about $75 per unit, compared with the $5 per unit cost of the off-the-shelf capacitors that failed stress testing. “The use of commercial-off-the-shelf electric components needs to be improved to reduce future COTS-related risk,” Verdon said. The Navy is working with U.S. Strategic Command to understand how the 18-month delay will affect near-term deployments, Vice Adm. Johnny Wolfe, the director of strategic systems programs for the Navy, told the panel. “Currently, today, based on what we're doing with STRATCOM, we will meet the requirements as we move forward,” Wolfe said. The Navy and STRATCOM are developing a mitigation plan which includes is reevaluating how to turn around the submarine-based nuclear missile stockpile and how to schedule warheads for upgrades in the future, Wolfe said. More details on the Navy's plan to be discussed in a classified hearing. “If you look at the age of these systems and the technology we're using, these are tough, tough issues to solve, and it's critical technology that we're learning as we modernize these,” Wolfe said. Rep. Jim Cooper (D-Tenn.), chair of the strategic forces subcommittee, said he held the hearing because he wanted more information on what NNSA was doing to avoid more delays. He called the recapitalization “both necessary and hugely expensive” in his written opening statement. “Maintaining Congress and the public's confidence in these programs, and their effective execution, is imperative,” he wrote. https://news.usni.org/2019/09/25/faulty-5-parts-cause-18-month-1-billion-delay-to-navy-air-force-nuclear-upgrades

  • Boeing awarded $9.8B contract for Saudi F-15 support

    November 12, 2020 | International, Aerospace

    Boeing awarded $9.8B contract for Saudi F-15 support

    By Ed Adamczyk Nov. 11 (UPI) -- Boeing Co. was awarded a $9.8 billion contract to support F-15 fighter planes of the Royal Saudi Air Force, the U.S. Defense Department announced. The deal covers modernization and sustainment of the Saudi fleet of nearly 130 aircraft over the next five years, the Pentagon said on Tuesday. The package of upgrades includes hardware, software, interface design, development, integration, test, installation of future modifications and enhancements to the F-15 Saudi weapon system. The contract also includes an option for an additional five years beyond the inital November 2025 time period. The F-15 was first put into service as a tactical fighter plane in 1978, and is in use by the air forces of the United States, Japan, Israel, Singapore and Qatar. The newest aircraft of the Royal Saudi Air Force are the F-15SA variant, which come with wing-mounted weapons-carrying packages allowing the plane to carry and launch a wider array of new weapons configurations. The Advanced Missile and Bomb Ejection Racks, or AMBER, allow the plane to carry up to 22 AIM-120 missiles, nearly double the capability of previous F-15s. The F-15QA variant to be used by the Qatar Emiri Air Force, regarded as the most advanced current version of the plane, is based on the Saudi design. Earlier this week, the Pentagon awarded two contracts totaling $734.8 million for infrastructure and equipment for the QEAF. The larger of the two deals is a $657.2 million contract for parts and training for Qatar's F-15 program, beginning with the arrival of the first F-15QAs in 2021. https://www.upi.com/Defense-News/2020/11/11/Boeing-awarded-98B-contract-for-Saudi-F-15-support/2971605119323/

All news