Back to news

November 9, 2023 | Local, Aerospace

Boeing T-7A Red Hawk completes cross-country flight to Edwards AFB to continue testing - Skies Mag

The first Boeing T-7A Red Hawk for the Air Force has completed its 1,400-mile cross-country flight to Edwards AFB to move forward with flight testing.

https://skiesmag.com/news/boeing-t7a-red-hawk-completes-cross-country-flight-edwards-afb-continue-flight-testing/

On the same subject

  • The Liberals want to 'refresh' the shipbuilding strategy. What does that mean?

    August 15, 2018 | Local, Naval

    The Liberals want to 'refresh' the shipbuilding strategy. What does that mean?

    Murray Brewster Recent comments by a parliamentary secretary had Irving asking for a public commitment to the strategy The federal government has been quietly debating a "refresh" of its marquee — but troubled — national shipbuilding strategy, federal documents reveal. A memorandum to the deputy minister of Finance, obtained by CBC News under access to information legislation, notes there was "tangible progress" in ship construction last year, but also references impending production gaps at the two designated shipyards: Irving-owned Halifax Shipyard and Seaspan in Vancouver. The size and scope of the "policy refresh" was not made clear in the heavily redacted memo, dated Jan. 23, 2018. Officials at Public Services and Procurement Canada were asked to explain, but did not produce a response by Tuesday evening. As recently as last week, government officials were insisting they were still committed to the strategy. Still 'broken'? During the last election campaign, the Liberals pledged to fix the "broken" procurement system and invest heavily in the navy. Conceived under the Conservatives but embraced by the Liberals, the national shipbuilding strategy has been plagued by delays and ballooning cost estimates in the building of both warships and civilian vessels. Critics have long complained it would be cheaper and faster for Canada to buy offshore from foreign competitors. It also remains unclear whether the build-in-Canada provision that is at the heart of the strategy is up for consideration in the reset. Much of the icebreaking fleet belonging to the coast guard is in need of replacement — a critical gap that led the government recently to set aside $610 million for the refurbishment of three commercial ships. Similarly, the navy has been forced to lease a replenishment ship because of delays associated with the Joint Support Ship program. Confidential sources in the defence community said the review is being driven partly by a yet-to-be completed assessment of the coast guard, which has — according to a 2015 statutory assessment — among the oldest coast guard fleets in the world. The retooled policy is expected to be ready this fall, the sources said, and will also encompass updated budget estimates and timelines for delivery. Last spring, CBC News reported the federal government had received a revised delivery schedule for vessels being constructed at Seaspan. But it refused to release it. The new timetable, which apparently forecasts delays outside of the company's control, is politically sensitive. It speaks to issues at the heart of the breach-of-trust case against Vice Admiral Mark Norman, the military's second-highest commander — in particular, the program's inability to deliver ships in a timely manner. Full Article: https://www.cbc.ca/news/politics/liberals-shipbuilding-navy-refresh-1.4785465

  • The Royal Canadian Navy to Deploy OSI’s ECPINS Warship 6.2 on all Ships and Submarines

    October 31, 2017 | Local, Naval

    The Royal Canadian Navy to Deploy OSI’s ECPINS Warship 6.2 on all Ships and Submarines

    OSI Maritime Systems is pleased to announce that the Royal Canadian Navy (RCN) will deploy ECPINS® Warship 6.2 on all ships and submarines. ECPINS is recognized as the most advanced Warship Electronic Chart Display and Information System (WECDIS), with military capabilities well beyond NATO WECDIS STANAG 4564. STANAG 4564 defines the primary function of WECDIS, which is to contribute to safe navigation and to enhance the conduct of warfare. Further, OSI has received Marine Equipment Directive (MED) Type Approval certification from DNV GL for ECPINS against new International Hydrographic Organization (IHO) and International Electrotechnical Commission (IEC) standards for ECDIS. These international maritime standards are a requirement of NATO WECDIS STANAG 4564. “We are proud of our relationship with the RCN which began in 2001 with a fleet-wide installation of ECPINS,” said Ken Kirkpatrick, President & CEO. “We attribute that beginning with where OSI is today, a leading provider of integrated navigation and tactical solutions to many of the NATO and Allied navies. In addition, OSI is now a major player in the warship Integrated Bridge System (IBS) market – in fact, we are presently delivering IBS to the Arctic Offshore Patrol Ship project.” Headquartered in Burnaby, BC, OSI is the only 100 percent Canadian company that produces and delivers a complete range of naval integrated navigation and tactical solutions across four continents. For more information: Simon Wills +1 778-373-4655 simon.wills@osimaritime.com http://osimaritime.com/mediaReleases/OSI_release20171024_RCN_ECPINS_Upgrade.pdf

  • Contrat d’achat des F-35 | Les négociations entre Ottawa et Lockheed Martin sur le point d’aboutir

    December 16, 2022 | Local, Aerospace

    Contrat d’achat des F-35 | Les négociations entre Ottawa et Lockheed Martin sur le point d’aboutir

    Les négociations entre le Canada, Lockheed Martin et le gouvernement des États-Unis concernant l’achat de 88 avions furtifs F-35 progressent. À un point tel que la ministre de la Défense nationale, Anita Anand, laisse entendre dans une entrevue à La Presse qu’elle pourra annoncer de bonnes nouvelles « bientôt ».

All news