Back to news

June 21, 2018 | International, Land

Australia seeks industry input on infantry fighting vehicle project

Jon Grevatt

Key Points

  • Australian DoD seeks industry advice on tender timeline for Land 400 Phase 3 procurement project
  • Industry feedback intended to support better planning and to reduce the cost of tendering

The Australian Department of Defence (DoD) is looking to engage with local industry on the schedule to issue a tender in support of a multi-billion dollar programme to procure close combat capability under Project Land 400 Phase 3.

The DoD said on 20 June that it is inviting local companies to review and comment on the timeline for project through which it will replace the Australian Army's M113AS4 armoured personnel carriers (APCs) with up to 450 modern infantry fighting vehicles and 17 manoeuvre support vehicles. A draft request for tender (RFT) document for the programme has also been issued as part of the engagement.

According to the DoD's 2016 Integrated Investment Program, which identifies defence investments in the decade to 2026, the Land 400 Phase 3 acquisition is worth between AUD10-AUD15 billion (USD7.4-USD11 billion). The DoD issued a request for information (RFI) for the project in November 2015, while government gave ‘first pass' or preliminary approval for the procurement in March 2018.

Commenting on the decision to seek industry's advice on the tender schedule, Australia's Minister for Defence Industry Christopher Pyne said that it would lead to a better informed tender process and reduce the cost of tendering for local industry.

“The proposed tender timeline identifies key milestones in the tender evaluation,” said Pyne. “We welcome industry's feedback on the timeline to better enable both industry and [the DoD] to plan for this significant boost to capability.”

The DoD indicated that the move to seek industry advice on the Land 400 Phase 3 tender timeline was requested by local companies during the programme to acquire more than 200 combat reconnaissance vehicles under Land 400 Phase 2.

http://www.janes.com/article/81187/australia-seeks-industry-input-on-infantry-fighting-vehicle-project

On the same subject

  • Israel's Elbit to make land surveillance system for Cyprus

    November 10, 2021 | International, Land, C4ISR

    Israel's Elbit to make land surveillance system for Cyprus

    Reports have surmised the system will be for the Green Line in Cyprus, which divides the island between the Turkish-administered northern part and the government of Cyprus.

  • Infantry Squad Vehicle is a cramped ride, but US Army says it meets requirements

    January 26, 2021 | International, Land

    Infantry Squad Vehicle is a cramped ride, but US Army says it meets requirements

    By: Jen Judson WASHINGTON — The U.S. Army's new Infantry Squad Vehicle is a cramped ride and offers limited protection from certain threats, according to a recent report from the Pentagon's chief weapons tester, but it still meets the service's requirements in tests and evaluations, the product lead told Defense News. The ISV “key requirements are being met and we are increasing soldier operational readiness by providing an operationally relevant vehicle that can transport small tactical units to a dismount point faster and in better physical and mental condition for the fight,” said Steven Herrick, the Army's product lead for ground mobility vehicles within the Program Executive Office Combat Support and Combat Service Support. The vehicle was designed for easy transport to operational environments with the infantry's current rotary and fixed-wing transport platforms. The key performance parameters required that the vehicle's weight not exceed 5,000 pounds and that it fit inside a CH-47 Chinook cargo helicopter. Those requirements “force dimensional requirements only allowing the vehicle to be a certain height, width and length,” he said. The requirements led to a vehicle that makes it hard for soldiers with all their gear needed for a 72-hour mission to comfortably fit inside and be able to access rucksacks on the move. The Army assessed three vendors in developmental testing from December 2019 through January 2020. The service chose General Motors Defense to supply the vehicle to the force, with the company beating out an Oshkosh Defense and Flyer Defense team as well as an SAIC and Polaris team. All offerings were capable of carrying a nine-soldier infantry squad with weapons and equipment during movement, the director of operational test and evaluation said in the report. But the Pentagon also noted the ISV “has not demonstrated the capability to carry the required mission equipment, supplies and water for a unit to sustain itself to cover a range of 300 miles within a 72-hour period.” The Army, however, has assessed the ISV requirement and solution set is in alignment, Herrick said. The DOT&E report, he said, “indicates a desire to include more equipment than a standard nine-soldier squad would carry on a 72-hour mission.” This lack of space, the report stated, “may create a logistics and operational burden” and might limit the type of missions and duration for ISVs. The soldiers that participated in the touch point evaluating the vehicles were asked to bring their Advanced Combat Helmet and Improved Outer Tactical Vest with plates; individual weapon; night vision devices; and ruck with three days' worth of supplies, Herrick said. “All vendors' ISVs are cramped and soldiers cannot reach, stow, and secure equipment as needed, degrading and slowing mission operations,” the report explained. During tests “soldiers on all ISVs could not readily access items in their rucksacks without stopping the movement, dismounting, and removing their rucksacks from the vehicle.” The soldier touch point took into account soldier comfort, visibility and ability to execute the mission, Herrick said. This was all factored into the Army's decision to choose GM Defense's vehicle. “Additionally, no current or planned combat or tactical vehicle allows access to rucksacks while moving to support operator safety,” Herrick noted. “Crew spaces on the ISV are designed to allow mission performance of specific duty tasks.” Units also lacked reliable communication capability, according to the report, using hand-held or manpack radios between 62 and 300 miles. The ISV does not have a mounted radio requirement. “Communication between the squad leader, soldiers, and the platoon leader was intermittent and not reliable,” the report found. Because of the concept of the ISV providing an effective aid to insert soldiers into combat operations, the requirements support just what the soldier carries, so there is no mounted requirement yet, Herrick said. That requirement could be added as a growth capability later. The DOT&E report also noted that the ISV doesn't have an underbody and ballistic survivability requirement, which could mean the unit would be susceptible to certain threats, but the ISV's speed as well as its small, low profile might help deal with those issues. Adding protection to the vehicle would sacrifice the speed the squad needs to rapidly inject itself into operations. Overall, GM Defense's vehicle had the highest reliability among the three vendors, demonstrating 585 mean miles between operational mission failures. The Army's user requirement is 1,200 mean miles for that situation. Herrick noted that reliability and maintainability testing was not scheduled or conducted by Army Test and Evaluation Command or the program office, so the calculations used in the DOT&E report were “not supported by traditional [reliability and maintainability] RAM elements, such as scoring conferences and time for the vendor to implement changes.” The mileage accumulated and referenced in the report was “not meant to evaluate RAM by the Army, but rather to provide the program office and contractor an initial insight on the capability of the system over 500 miles,” Herrick added. The vehicle's RAM testing is scheduled to begin this month, he added.. The service wasn't able to evaluate every aspect of the vehicle before moving into production, but it plans to test the vehicle's ability to be carried by a Chinook during its initial operational test and evaluation this year. Now that the Army has chosen the GM Defense vehicle, it has already initiated developmental testing that will lead to an initial operational test and evaluation in August 2021 at Fort Bragg, North Carolina. That testing began in November 2020. https://www.defensenews.com/land/2021/01/25/infantry-squad-vehicle-is-a-cramped-ride-but-army-says-it-meets-requirements/

  • The Pentagon’s new space agency has an idea about the future

    July 4, 2019 | International, Aerospace, C4ISR

    The Pentagon’s new space agency has an idea about the future

    By: Nathan Strout The Defense Department's next generation space architecture would consist of several layers based around a mesh network of small communications satellites, according to a document released by the Space Development Agency July 1. A request for information lays out an early outline of what that new satellite architecture would look like and how the commercial sector can contribute to the effort. The SDA is a new entity that the Pentagon established less than four months ago as part of the Trump administration's focus on reorganizing the military's space structure. The agency's initial goal is to develop a next generation space architecture for military satellites in the face of near-peer adversaries' growing interest in space. “In an era of renewed great power competition with an emergent China and a resurgent Russia, maintaining our advantage in space is critical to winning these long-term strategic competitions,” read a request for information posted to the Federal Business Opportunities web site. “These potential adversaries are developing and demonstrating multi-domain threats to national security much faster than we can deploy responsive, space-based capabilities.” The agency wants the new architecture to provide eight essential capabilities identified in a 2018 Pentagon report. In addition, the Pentagon wants to include development of deterrent capability, space situational awareness, a resilient common ground-based space support infrastructure, command and control systems and artificial intelligence-enabled global surveillance. The Space Development Agency's notional architecture is made up of several layers, each of which would contribute to at least one of the eight essential capabilities. They include: A space transport layer: A global mesh network providing 24/7 data and communications. A tracking layer: Provides tracking, targeting and advanced warning of missile threats. A custody layer: Provides “all-weather custody of all identified time-critical targets.” A deterrence layer: Provides space situational awareness—detecting and tracking objects in space to help satellites avoid collisions. A navigation layer: Provides alternative positioning, navigation and timing services in case GPS is blocked or unavailable. A battle management layer: A command, control and communications network augmented by artificial intelligence that provides self-tasking, self-prioritization, on-board processing and dissemination. A support layer: Ground command and control facilities and user terminals, as well as rapid-response launch services. The SDA's immediate goal is the development of a transport layer consisting of a mesh network for communications and data in low earth orbit. As the agency has stated previously, that effort will rely heavily on DARPA's Blackjack program - a project that will establish an initial transport layer with a 20 satellite constellation. The SDA wants to build sub-constellations around the Blackjack program to meet some of the needs it has identified, such as missile defense warnings and targeting, alternative positioning, navigation and timing services, and more. The constellation and associated sub-constellations will be made up of small mass-produced satellites in the agency's vision, ranging from 50 to 500kg. The next-generation space architecture posting is the first request for information that the agency has posted in its brief existence, and sets a tone for what it's looking for from the commercial sector. Specifically, the SDA wants to know what capabilities and concepts the commercial sector can bring to bear on satellite buses, payloads, appliques and launches. Any proposal should fall into at least one of the suggested layers, the SDA stated. “SDA intends to leverage investments made by the private sector in space capabilities (...), as well as industry best practices (e.g., mass production techniques for spacecraft buses, sensors, and user terminals),” stated the agency. Among other things, the agency wants proposals for the following items: Small and cheap payloads that can provide high-bandwidth links between satellites; software that can track missiles from low earth orbit; software that can facilitate autonomous space sensor collection, processing and dissemination, and alternative methods for positioning, navigation and timing in case GPS is unavailable. In addition, the SDA wants feedback on the overall structure of its notional architecture. The SDA is also interested in industry concerns about data rights, security and protection, acquisition approaches and more. In building this new architecture, the SDA is clear that it wants to be agile and flexible in adapting to new technology and threats, meaning it wants to be able to integrate upgrades within two year windows. While it's not clear in the document how quickly the SDA wants to have the new architecture in place, the agency does emphasize that it is looking for efforts that can be demonstrated in less than 18 months. Responses are due on August 5. The SDA plans to hold an Industry Day to connect with the commercial sector in the near future. The document's release comes shortly on the heels of Space Development Agency Director Fred Kennedy's resignation in late June. Kennedy was the agency's first director, having been originally appointed to the position by acting Defense Secretary Patrick Shanahan when the agency was stood up March 12. Derek Tournear, the assistant director for space within the Office of the Under Secretary of Defense for Research & Engineering, was named the acting director of the agency June 24. Prior to taking the assistant director position, Tournear was the director of Harris Space and Intelligence research and development. He has also served stints at the Intelligence Advanced Research Projects Activity and the Defense Advanced Research Projects Agency. A Department of Defense spokesperson stated that Kennedy stepping down would not change the mission of activities of the agency. All of this comes as the U.S. military has worked to revamp its efforts in space. In addition to the stand up of the SDA, the Trump administration is also pushing for the creation of Space Force, a proposed sixth branch of the military that would be housed within the Air Force. While the Senate Armed Services Committee endorsed a version of Space Force, the House Armed Services Committee proposed a Space Corps, which would not be an independent branch of the military. https://www.c4isrnet.com/battlefield-tech/2019/07/03/the-pentagons-new-space-agency-has-an-idea-about-the-future/

All news