Filter Results:

All sectors

All categories

    3544 news articles

    You can refine the results using the filters above.

  • Canada’s Combat Ship Procurement Process

    August 22, 2018 | Information, Naval

    Canada’s Combat Ship Procurement Process

    A FrontLine Report © 2018 FrontLine Defence (Vol 15, No 4) Activity on the Canadian Surface Combatant (CSC) procurement project, the “Crown Jewel” of the Government's National Shipbuilding Strategy, is starting to heat up as contenders submit their bids. Since FrontLine last articles detailing the CSC project, Canada's prime contractor, Irving Shipbuilding Industries (ISI) and their U.S. subcontractors have been busy reviewing the final bids submitted by the three industry teams who emerged over the past two years as serious enough in the pursuit to invest the significant amount of capital required to generate a bid. Stressing that the following list is in no particular order, the 3 bidders are: Team Alion – composed of Alion Canada (a subsidiary of American Alion Science and Technology), Atlas Elektronik (now being merged under thyssenkrupp Marine Systems), and Hensoldt Sensor, (a spin-off from Airbus Group), this group is bidding the Dutch Damen Scheld Naval Shipbuilding De Zeven Provinciën Air Defence and Command (LCF) frigate, which has 10+ years in service under its belt. Team BAE – or CSC Home Team as they like to be called, includes Lockheed Martin Canada, BAE Systems Canada, L3 Technologies Canada, MacDonald Dettwiler and Associates (now a component of U.S. MAXAR Technologies), Ultra Marine Systems Canada, and CAE. Their proposed design is the BAE UK-designed Type 26 Global Combat Ship (GCS). Team Navantia – consisting of Navantia SA of Spain, Saab Australia, and CEA Technologies, this team is bidding the F105 frigate design. Currently in service with the Spanish Navy, the design has also been chosen by Norway and Australia. Other team members include US Lockheed Martin (Moorestown, NJ), General Dynamic Mission Systems – Canada, DRS Technologies Limited Canada (now a Leonardo company), OSI Maritime Systems, and Rheinmetall Canada. Meanwhile, in a decision that may impact Canada's thinking, Australia has announced that it chose the T26 Global Combat Ship (GCS) as the winning design in its Sea5000 program. This announcement occurred just before Canada Day and local pundits were quick to comment on the potential impact on the CSC down-select process. Most agreed that this was good news for the CSC Home Team bidders despite its “paper ship” classification of not being a proven design. With the T26 design being developed concurrently in Canada, timelines are such that there is a possibility that in fact Canada may have a GCS completed before the UK. We now find the CSC program in the final stage of bid evaluation, which includes the ‘Cured' Technical component as well as the financials. There is speculation that the Crown will adopt a similar approach for the financial component as they did for the technical component, which is a financial “cure” opportunity. The expectation is that there will be a period of several months to accommodate the cure process and arrive at final bids from the three teams, and then a 4-week turn around for the final (amended) financial information to be submitted. Looking back, readers will recall that in 2016 we witnessed the Trudeau promise to kill the F-35 purchase and put more money into shipbuilding, and in particular the CSC Project. This was assessed as posturing as we all knew that most of the F-35 budget is money that would be spent on operations and maintenance, not capital expenditure. However, after the election, the Trudeau Government did make good (sort of) on the promise to “take a look under the hood” in terms of adjusting the CSC procurement process. Although they did not change the engine, they did more than just tinkering with the carb. In 2017 the Trudeau Government realized the dual stream selection method for a warship designer and a combat system integrator, known as the RFRE qualifier process, was a mis-step and changed the procurement process to allow teams to form and submit a combined Design and Combat systems bid. Around this time-frame, they also awarded a “shipbuilding” contract that fell outside of the NSS. An unsolicited proposal was accepted from Chantier Davie to convert a container ship into an urgently needed temporary replacement for the auxiliary oiler replenishment (AOR) capability. Given that neither Irving nor Seaspan had the capacity to execute this AOR contract in a timely manner, and notwithstanding that Irving made an intervention to try to kill the award to Chantier Davie, which caused the new Liberal Government to put the award on hold, the “pause” on the “At Sea Support” project (aka Project Resolve) was short-lived. The deal was upheld and MV Asterix was successfully delivered to DND on time and on budget. This is a true success story in these times of amazing ineptitude in defence contracting. Regrettably, neither the RCN nor DND have had much to say about the success of Asterix – we can only surmise this is a result of the most unfortunate “Norman-Gate”. Back to CSC, the reader will undoubtedly remember the 2017 surprise of finding out that Irving would be sharing bidders' sensitive intellectual property with its subcontractors, most of them American. The most astounding of those in Irving's information pipeline for sensitive proprietary information, was Gibbs & Cox – a naval engineering firm and a competitor to many, if not all, of the potential designers. Others include AT Kearney Public Service and Defense Services (a U.S. consulting firm); Fleetway Inc. (part of the Irving Group); and Systems Planning and Analysis Inc. (another U.S. consulting firm). It was reported by David Pugliese in March that the Government approved an additional $54 million (for a total of $83 million) for project bid evaluation, and then in April, he reported that all three bidders had failed to meet some requirements. 2016 RFRE qualifiers As announced by the Government in November 2016, the RFRE qualifiers for Warship Design were (in alphabetical order): Alion-JJMA Corp. BAE Systems Surface Ships Limited DCNS SA (now Naval Group) Fincantieri Naval Vessels Navantia SA Odense Maritime Technology ThyssenKrupp Marine Systems The RFRE qualifiers for Combat Systems Integrator included: Atlas Elektronik DCNS SA (Naval Group) Lockheed Martin Canada Saab Australia Pty Ltd. Selex ES (now Leonardo) Thales Nederland B.V. ThyssenKrupp Marine Systems After the RFRE process was abandoned... Regarding the 2016 RFRE process and quest for the holy grail (officially known as the Total Ship Reference Point or TSRP), only three of those original qualifiers are now left in the race. The others dropped out (or teamed up) for one reason or another over the past 24 months – some by simply vacating the premises so to speak, while others went out with somewhat of a bang. Of the 2016 qualifiers, Naval Group (formerly DCNS), Fincantieri, and Odense Maritime Technology have walked away. Interestingly, two of the qualifiers (DCNS/Naval Group and TKMS) had been pre-qualified in both streams and had been assessed as having the upper hand, however, neither submitted a bid after examining the Irving/Government's bid conditions and recognizing the risk of sharing IP without contracted legal protection in place. We shall look at them first. DCNS – Naval Group The French FREMM (multi-mission frigate) project by Naval Group (formerly DCNS) was touted as combining the latest technologies developed by Naval Group and a design adapted to Canadian requirements. It was to be the cornerstone of French efforts to share its expertise with Canadian partners. In 2015-16, DCNS was reportedly taking the CSC Project very seriously. However, their gravitas was all for naught as it saw the sharing IP without a contract as jeopardizing its future. Possibly because of this, Naval Group failed to seriously engage Canadian Suppliers which would allow it to develop a winning strategy. Rather, what evolved into a French (Naval Group) – Italian (Fincantieri S.p.A. Naval Vessels Business Unit) FREMM lash-up, and chose to not submit a bid in accordance with the Government/Irving RFP, but instead proposed an off-the-shelf purchase for a very reasonable $30 Billion. Their rationale, as reported in the press, was they did not want to hand over sensitive proprietary data to Irving and its subcontractors. This proposal was not well received by PSPC, which publicly stated the proposal would not be considered. thyssenkrupp Marine Systems thyssenkrupp Marine Systems (tkMS) of Germany was also very forthcoming in providing information on its potential RFRE submission. Its project references were based primarily on its role as prime contractor for the F124 frigates, where it was responsible for the development of the Combat Management System software and the integration of entirely new and highly-complex sensor and weapon system technologies. tkMS saw itself as fully capable of providing complete logistics support with training facilities, operator and technician training, discrete logistics support elements, as well as the supply of spare parts for both the platform and combat systems. In early 2017, and despite having qualified as CSI and WD, tkMS had assessed the potential for winning, and particularly the requirement to submit proprietary technical data to a non-government agency (read ISI), as unpalatable and all but withdrew from the race. The local Ottawa office did not submit a bid for the final 30 November deadline for the technical and Canadian Content Value aspects of the bid. In hindsight, the modular approach to the tkMS MEKO design concept featured in the design of Germany's F124 and F125 warship-size frigates, is still a very appealing design and may have carried the day. Their decision to withdraw was reportedly based on factors that included an intense distrust of sharing intellectual property other than Government to Government. Danish Iver Huitfeldt Frigate by Odense Maritime Technologies (OMT) – Maersk In 2015, the Danish Iver Huitfeldt-class frigate was considered one of the four serious contender designs. At 6600 GRT and 138 metres in length, the vessel appeared to be a good fit for the CSC high-level requirements as briefed by the Royal Canadian Navy in August 2014. The team that produced the ship design – Maersk Shipping, Odense and the Danish Navy – established itself as Odense Maritime Technology (OMT) to market its expertise in producing spacious, logical, efficient designs that can be procured for much less than a warship of similar tonnage built elsewhere. The Iver Huitfeldt Frigate design is powered by four diesel main engines driving two shafts in separate engine rooms, max speed 29 knots. The weapons are in modular units for ease of change-out or upgrade, and there is space for four TEU shipping containers for additional mission fits. The Danish Navy operates the ship with a crew of 105, although there are additional 60 bunks for mission fit, training staff and other requirements. The cost to build was quoted as $325M, which was considerably cheaper than expected and was certainly appealing to the bean counters in the early days of the program. Below the main deck, the ship's design is largely commercial, having been designed by Maersk, one of the world's largest shipping companies. In hindsight, perhaps the commercial below decks design was just that – too commercial. Notwithstanding, the FrontLine assessment is that OMT's lack of commitment to the program and the need to pre-commit on Canadian content was their downfall. Despite the efforts of OMT's Vice President Business Development, Mr. Kevin Pitt, from the Toronto office, and qualification through the RFRE process, the bid was destined to fail from the outset. OMT was unable to line up a dance partner in the form of a CSI in time to adapt to the new procurement strategy and the bid collapsed. FrontLine's view was, and still is, good design notwithstanding, to be competitive OMT should have invested in a larger engineering and design footprint in Canada with all the necessary security bells and whistles to support their marketing process. Selex ES – Leonardo DRS As an RFRE qualifier, Selex ES never emerged from the shadows as a contender. The Leonardo bid of an Italian FREMM seemed to wither as time went on. Eventually, as mentioned above, the French Naval Group and the Italians combined forces but never got out of the starting block after they received the results of the pre-qualifier bid review process. Thales Nederland Another multi-national, Thales Group, was also successful with their submission in response to the CSI RFRE, relying primarily on their international credentials for project references from Thales Nederland BV. Thales has significant bona fides, having integrated Combat Systems across 27 shipyards on nearly 200 naval platforms, making it one of the leading Naval Combat Systems Integration companies in the world, and Thales Canada has been the largest supplier of naval sensors to the RCN for the past 40 years. Thales is proud of its track record in integrating Above Water and Underwater Warfare suites and its extensive experience integrating communications suites. Thales Canada was seen as having good potential to emerge on a team as a strong player. However, there were not enough dance partners to go around among the designers and Thales dropped down to the category of potential Tier 2 supplier. Like many of the other potential CSI bidders, Thales is maintaining close contact with all of the potential CSIs and would likely be a supplier to the eventual CSI winner in their strong suit – Naval Combat System products in the areas of Naval Radars and Electro-optical solutions, Naval Underwater systems, Electronic Warfare systems, and Naval Communications system. Thales will continue as a Tier 1 partner with Seaspan for the delivery of all of Mission Systems solutions for the Joint Support Ships (JSS) and Coast Guard vessels. The 2017 award of the in-service support contract known as AJISS – for the Arctic Offshore Patrol Ships (AOPS) and JSS – will keep Thales in Canada for years to come. Full article: https://defence.frontline.online/article/2018/4/10242-Canada's-Combat-Ship-Procurement-Process

  • Thales to provide new minehunting system to U.K. Royal Navy

    August 22, 2018 | International, Naval

    Thales to provide new minehunting system to U.K. Royal Navy

    By Stephen Carlson Aug. 21 (UPI) -- The U.K. Royal Navy has accepted Thales' newest 2093 mine countermeasures sonar after extensive sea trials. The 2093 variable depth sonar has been in Royal Navy and worldwide service since the 1980s. The current version being adopted by the U.K. is a wideband variant expected to be installed on the Sandown-class minesweeping vessels, Thales said in a news release. The system has undergone 3 months of trials over the summer onboard the HMS Grimsby minesweeper. It is expected to be installed as the standard countermine system aboard Royal Navy ships, according to Thales. 2093 Wideband is a multi-frequency variable depth sonar system designed to detect mines in all depths of water. The sonar receiver and transmitter are part of a towed array which is lowered below the ship by cable cable, which allows it to penetrate oceanic temperature layers. Thermal layers can block or interfere with sonar signals, making depth of the system important for some applications. The system is based off the 2193 hull-mounted system that is in use on the Hunt-class minesweeper and other ships. The system is expected to be widely exported to nations in Asia, the Middle East and Europe that already use similar legacy systems. https://www.upi.com/Defense-News/2018/08/21/Thales-to-provide-new-minehunting-system-to-UK-Royal-Navy/7951534870862

  • Government of Canada makes long-term investments to protect Canadian ships and sailors with modern and efficient equipment

    August 22, 2018 | Local, Naval

    Government of Canada makes long-term investments to protect Canadian ships and sailors with modern and efficient equipment

    News release August 17, 2018 – Esquimalt, B.C. – National Defence / Canadian Armed Forces Through Strong, Secure, Engaged, the Government of Canada reaffirmed its commitment to ensuring the Royal Canadian Navy remains an agile, multi-purpose and responsive naval force. In support of this commitment, Defence Minister Harjit S. Sajjan, highlighted the award of two contracts related to maritime equipment today. The contracts will acquire, upgrade, and sustain defensive systems for the Royal Canadian Navy. These long-term investments will enhance and improve the Royal Canadian Navy capabilities and sustain more than 50 jobs annually for many years to come. The two contracts are as follows: A $94.2-million contract to Lockheed Martin Canada to maintain and overhaul, the Reprogrammable Advance Multimode Shipboard Electronic Countermeasures System (RAMSES). A $21.1-million contract to Rheinmetall Canada to procure and install a third launcher on the frigates, improving the current MASS configuration. RAMSES is an electronic attack system that protects the modernized Halifax-class frigates against radio frequency guided missiles. It employs jamming signals to track and distract anti-ship missiles from hitting the ship. MASS is an integral part of the anti-ship missile defence suite. It is a firing system used to launch decoys to project vessels against anti-ship missiles guided by radio frequency, laser and infrared seekers. Both contracts will help naval combat operators continue to protect Canadian ships and sailors with modern and efficient equipment, while helping to bolster our Royal Canadian Navy across its fleets. Quotes “These investments in our Royal Canadian Navy will provide our women and men in uniform with what they need for successful missions, and deliver jobs, both here in British Columbia and across Canada for years to come. Our defence policy, Strong, Secure, Engaged, promised an agile, multi-purpose Navy and we are delivering on that promise with today's $115 million investment.” Harjit S. Sajjan, Defence Minister “Our Government is committed to building a more agile, better-equipped military, while ensuring the best value for Canadians. These systems will provide the frigates of the Royal Canadian Navy with the modern equipment they need to do their jobs safely and securely in various environment, at home or abroad.” – Carla Qualtrough, Minister of Public Services and Procurement and Disability Quick facts The RAMSES contract will be valid until the late 2030s, If all options are exercised, and will ensure maintenance of the Halifax-class frigates' electronic attack capability. The MASS replaced the obsolete SHIELD system. The installation of a third launcher will enable 360° anti-ship missile defence coverage for the Halifax-class frigates. https://www.canada.ca/en/department-national-defence/news/2018/08/government-of-canada-makes-long-term-investments-to-protect-canadian-ships-and-sailors-with-modern-and-efficient-equipment.html

  • The Navy's Fighter Shortage Is Finally, Slowly Improving

    August 21, 2018 | International, Aerospace, Naval

    The Navy's Fighter Shortage Is Finally, Slowly Improving

    By Kyle Mizokami The U.S. Navy's horrible fighter availability rate is gradually improving thanks to increased funding for fighter maintenance. At one point in 2017, just one in three F/A-18 Super Hornet fighters was available, a number that's increased to nearly half of all fighters. The problem is in large part due to past budget shortfalls and delayed introduction of the F-35 fighter jet. The U.S. Navy has 546 F/A-18E and F/A-18F Super Hornet fighters, larger, beefier, slightly stealthier versions of the original F/A-18 Hornet. Aircraft readiness rates, or the percentage of aircraft ready for deployment, should typically be north of seventy five percent, depending on type of aircraft, the complexity of the aircraft systems, and the age of the fleet. In 2017, the Navy's Super Hornet fleet hovered around 30 percent readiness, a shockingly low number the service blamed on minimal maintenance budgets and non-stop operations. The Navy struggled to place flight-capable aircraft with squadrons deploying on aircraft carriers. On the outside things looked fairly normal, as carriers went to sea with flight decks filled with Super Hornets. Behind the scenes however non-deployed squadrons suffered, acting as spare parts donors for deployment-bound ships. This cascading effect had negative implications for stateside squadrons and pilot training. According to DefenseNews, Secretary of the Navy Richard Spencer cited increased maintenance budgets over the past two years as a major part of the turnaround, allowing the service to fund repairs and spare parts. The service also streamlined maintenance processes, avoiding duplication and increasing efficiency. The maintenance crisis was caused by several problems. The high demand for strike fighters, particularly for combat operations against the Islamic State, increased the amount of wear and tear on the Super Hornet fleet. Super Hornets also act as aerial refueling tankers, increasing flight hours and wear and tear on the platform. Meanwhile the Navy struggled to operate within the budget mandated by the 2011 Budget Control Act that trimmed federal spending. Making matters worse, so-called "continuing resolutions" passed during times of budget bickering to keep government going were an inefficient means of spending money and played havoc with the Pentagon's budget. Another problem that indirectly cause the crisis: a delay in the introduction of the U.S. Navy's version of the Joint Strike Fighter, the F-35C. The F-35C, meant to replace older F/A-18C Hornet fighters, is now at least three years behind schedule. As the chart above illustrates, the Navy originally expected the F-35C to be initial operations capable—when the first Navy squadron is at least partially combat-capable—in late 2015. That date has gradually slipped to late 2018 or early 2019. On the outside things looked fairly normal, as carriers went to sea with flight decks filled with Super Hornets. Behind the scenes however non-deployed squadrons suffered, acting as spare parts donors for deployment-bound ships. This cascading effect had negative implications for stateside squadrons and pilot training. According to DefenseNews, Secretary of the Navy Richard Spencer cited increased maintenance budgets over the past two years as a major part of the turnaround, allowing the service to fund repairs and spare parts. The service also streamlined maintenance processes, avoiding duplication and increasing efficiency. The maintenance crisis was caused by several problems. The high demand for strike fighters, particularly for combat operations against the Islamic State, increased the amount of wear and tear on the Super Hornet fleet. Super Hornets also act as aerial refueling tankers, increasing flight hours and wear and tear on the platform. Meanwhile the Navy struggled to operate within the budget mandated by the 2011 Budget Control Act that trimmed federal spending. Making matters worse, so-called "continuing resolutions" passed during times of budget bickering to keep government going were an inefficient means of spending money and played havoc with the Pentagon's budget. Another problem that indirectly cause the crisis: a delay in the introduction of the U.S. Navy's version of the Joint Strike Fighter, the F-35C. The F-35C, meant to replace older F/A-18C Hornet fighters, is now at least three years behind schedule. As the chart above illustrates, the Navy originally expected the F-35C to be initial operations capable—when the first Navy squadron is at least partially combat-capable—in late 2015. That date has gradually slipped to late 2018 or early 2019. As a result of this delay, the Navy was forced to extend the lives of five squadrons of older -C model Hornets while it waited for the F-35C. That work added to the burden of Navy maintenance units already working to keep Super Hornets flying. In addition to the Navy's maintenance work, Boeing is set to take 40 to 50 Super Hornets a year and upgrade them to the new Block III configuration. DefenseNews says this will also bring the jets in the worst shape back to flying condition. In the long term F-35C production should ease the burden on the Super Hornet community, as the fifth generation fighter will eventually equip half of the strike fighter squadrons deployed on U.S. Navy carriers. The executive branch's 2019 defense budget also plans for an additional 110 Super Hornets over five years. Finally, the Navy plans to acquire a small fleet of MQ-25 Stingray unmanned aerial refueling aircraft to take over tanking duties from the overworked strike fighters. Full article: https://www.popularmechanics.com/military/aviation/a22778556/us-navy-fighter-shortage-progress

  • Brazil postpones decisions again for its new corvettes

    August 21, 2018 | International, Naval

    Brazil postpones decisions again for its new corvettes

    Victor Barreira, Istanbul - IHS Jane's Defence Weekly The Brazilian Navy has postponed by about two months the short list and best and final offer (BAFO) decisions for its ambitious Tamandaré-class corvette project, the second leading priority within the force. The newly established schedule calls for the short list and BAFO announcements to occur in October and December respectively, the navy told Jane's on 17 August. The navy said it is delaying its decision because it needs additional information from the competitors to properly analyse the bids. Service officials provided no additional details on what information it still requires. The navy has not said how many companies will be included on the short list. Full article: https://www.janes.com/article/82477/brazil-postpones-decisions-again-for-its-new-corvettes

  • BAE wins $146 million contract to upgrade Navy cruiser Gettysburg

    August 21, 2018 | International, Naval

    BAE wins $146 million contract to upgrade Navy cruiser Gettysburg

    by James Langford Defense contractor BAE Systems won a $146 million contract for work on the USS Gettysburg, part of a class of guided-missile cruisers whose weapons and computer systems are undergoing upgrades to ensure they reach their 35-year service life. Work on the Gettysburg, which will be performed at London-based BAE's shipyard in Norfolk, Va., is scheduled for completion by 2020, and includes maintenance, modernization and repair, the U.S. Department of Defense said in a statement on Monday. The contract includes options that could bring its total value to $151.3 million. Built by Bath Iron Works, Gettysburg was commissioned in 1991 under former President George H.W. Bush. It belongs to the Ticonderoga class, which was first deployed in 1983 and uses Aegis technology to track aerial targets. Carrying Tomahawk missiles, the vessels can support carrier strike groups as well as conduct independent operations. The modernization program for the cruisers includes updates to computer and display equipment as well as electrical and mechanical systems. Weapons and sensor sets will be modified to improve submarine-combat capabilities, the Navy said, and electro-optical systems will be added that can monitor the ship's surroundings without radar emissions. Full article: https://www.washingtonexaminer.com/business/bae-wins-146-million-contract-to-upgrade-navy-cruiser-gettysburg

  • U.S. Navy Seeks Real-time Physiological Monitoring System

    August 21, 2018 | International, Naval

    U.S. Navy Seeks Real-time Physiological Monitoring System

    The U.S. Navy's aircrew systems program office intends to host an industry day in late September for a real-time physiological monitoring and alerting ... http://aviationweek.com/defense/us-navy-seeks-real-time-physiological-monitoring-system

  • New contracts will improve capabilities on Royal Canadian Navy frigates

    August 20, 2018 | Local, Naval

    New contracts will improve capabilities on Royal Canadian Navy frigates

    DAVID PUGLIESE, OTTAWA CITIZEN The Canadian government announced two contracts Friday for improvements to the Halifax-class frigates. The contracts are related to the Reprogrammable Advance Multimode Shipboard Electronic Countermeasures System (RAMSES), an electronic attack system that protects the modernized Halifax-class frigates against radio frequency guided missiles, and MASS, an integral part of the anti-ship missile defence suite. RAMSES employs jamming signals to track and distract anti-ship missiles from hitting the ship, according to the Royal Canadian Navy. MASS is a firing system used to launch decoys to project vessels against anti-ship missiles guided by radio frequency, laser and infrared seekers. A $94.2-million contract has been awarded to Lockheed Martin Canada to maintain and overhaul, the Reprogrammable Advance Multimode Shipboard Electronic Countermeasures System. A $21.1-million contract was awarded to Rheinmetall Canada to procure and install a third launcher on the frigates, improving the current MASS configuration. The RAMSES contract will be valid until the late 2030s, if all options are exercised, according to the RCN. The MASS replaced the obsolete SHIELD system. The installation of a third launcher will enable 360° anti-ship missile defence coverage for the Halifax-class frigates. https://ottawacitizen.com/news/national/defence-watch/new-contracts-will-improve-capabilities-on-royal-canadian-navy-frigates

  • UK restarts frigate competition - but will anyone take part?

    August 20, 2018 | International, Naval

    UK restarts frigate competition - but will anyone take part?

    By: Andrew Chuter LONDON - Britain's Ministry of Defence is restarting its contest to build five general purpose frigates for the Royal Navy after it terminated the original competition due to insufficient interest from industry. The Defence Equipment & Support organisation, the MoD's procurement arm, has issued a “prior information notice” informing potential bidders it is moving forward with the Type 31e program, and plans a short period of market engagement with companies or consortia that have expressed interest starting on Aug 20. “We have relaunched discussions with industry for our new Type 31e fleet, and this week issued a Prior Information Notice to ensure we do not lose any momentum. We remain committed to a cutting-edge Royal Navy fleet of at least 19 frigates and destroyers, and the first batch of five new Type 31e ships will bolster our modern Navy,” said an MoD spokesperson. “The purpose of the market engagement is for the Authority [DE&S] to share key elements of the new procurement, including technical and commercial elements. The Authority intends to use the feedback from the market engagement to inform the further shaping of its requirements and commercial construct,” said the DE&S in its announcement it was relaunching the competition. DE&S said suppliers should “only respond if they are in a position to undertake the full Type 31e programme, meeting its full requirement including a £1.25billion cost and building the Type 31e in a UK shipyard.” The Type 31e is a key part of the government's 2017 national shipbuilding strategy which in part seeks to open up the sector to local competition, rather than contract via a non-competitive single source contract with U.K. giant BAE Systems, the world's third largest defense company according to the Defense News Top 100 list. The fast track schedule for the Type 31e calls for the initial vessel to be in service by 2023, replacing the first of 13 Type 23 class frigates due to be retired by the Royal Navy in the period up to the middle of the 2030's. The final Type 31e -- the e stands for export -- is due to be delivered in 2028. Eight of the Type 23's will be replaced by anti-submarine warfare Type 26's. The remainder of the Type 23's will be replaced by the Type 31e. DE&S and industry are up against a time crunch on getting the first Type 31e into service, one which some executives here see as daunting, if not unachieveable, thanks to the need to restart the competition. But despite the delay in getting to the competitive design phase contract announcements, DE&S says it remains committed to the 2023 service date. “A new streamlined procedure will present an opportunity to save time in the overall program. We will release more information about our plans when we have completed the market engagement - which we plan to start from Aug 20,” said a second MoD spokesperson. Full Article: https://www.defensenews.com/naval/2018/08/17/uk-restarts-frigate-competition-but-will-anyone-take-part/

Shared by members

  • Share a news article with the community

    It’s very easy, simply copy/paste the link in the textbox below.

Subscribe to our newsletter

to not miss any news from the industry

You can customize your subscriptions in the confirmation email.