Filtrer les résultats :

Tous les secteurs

Toutes les catégories

    3586 nouvelles

    Vous pouvez affiner les résultats en utilisant les filtres ci-dessus.

  • A year-end Q&A with Defence Minister Harjit Sajjan

    31 décembre 2018 | Local, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    A year-end Q&A with Defence Minister Harjit Sajjan

    By Charlie Pinkerton Federal Defence Minister Harjit Sajjan spoke with iPolitics for a year-end interview. Here's what he had to say. Q: During your time as Canada's defence minister, what are you most proud of? A: The thing I'm most proud of is that our defence policy is focused on looking after our people. I've always said our Number 1 asset is our people; if we look after them, everything else will start to fall into place. I'll give you an example of this: putting the tax-free allowance in the defence policy; if you're deployed on an operation internationally, it's tax-free. That gives families back home tremendous flexibility with what they can do. That's one of the things I'm proud of. We also include families as part of our defence policy. We're seeing tangible results. We've done some work, we've got more work to do. As you can see, this is what I'm focused on. Those procurement projects — ships, jets — are absolutely important, right? But the thing is, if we don't look after our people, those ships and jets don't mean anything. And that's probably what I'm most proud of: turning into a reality our focus in the defence policy, which is to our people. Q: What do you regret during your tenure as defence minister? A: Sometimes things can't move as fast as you want. I wouldn't call it a regret, but you want to see progress as fast as possible, and sometimes you end up pushing so hard, like with procurement: Why aren't we moving faster? We have these questions, and we're reminded that we need to hire enough people to move on these files. And so it's a reminder — it's not a regret — to never put your people in a position to over-extend themselves. You need to have a holistic Canadian Armed Forces that will look after itself. This whole conversation of more teeth, less tail — I hate that. In reality, making sure your pension cheques are given on time is just as important. Q: Is there something you really want to accomplish during the time remaining in your mandate? A: It goes back to my first point: making sure we have enough momentum that we're able to start executing all the things that we want, and having the right number of people to be able to move our projects forward. Also, making it a reality that, from the time somebody joins the military, we're focusing on resilience and that they know the country has their backs. For example, with the Transition Group, we've ensured that no future government can ever take that focus away from the people ever again. Q: Whether you or someone else takes over in a year's time, what will be the most pressing issue he or she faces? A: For me, a Number 1 priority will be making sure the environment inside the Canadian Armed Forces is one that's inclusive, that's harassment-free, and I know it seems very idealistic to say this, but any other goal is unacceptable, because it leaves leeway for things, because when you create that environment, you'll be able to get the best potential out of your people at the same time. That's the challenge we're working on. General (Jonathan) Vance is aggressively dealing with this, and Operation Honour is showing results. To me, it's a challenge, and a challenge that has to be met, regardless of who's in this position. Q: Is there something you wanted to accomplish that was pushed aside by larger or more pressing priorities? A: There's one thing I was really looking forward to doing, which is learn French. I sort of underestimated the time required of the job. However, I am still committed to learning French. I do what I can in my own time, and I'll learn it when I leave politics, because I think it's important for all Canadians to be able to speak both official languages. Q: You're up for re-election. You've been defence minister for three years, which is a relatively long time. Aside from Peter MacKay, who held the job for about six years, you've had one of the longest tenures of the past 20 years. If re-elected, will you seek re-appointment? A: I got into politics because I wanted to represent the neighbourhood I grew up in of Vancouver South, and I was very privileged to have that honour. When it comes to the next election, my job is going to be to make sure I connect with my community in my riding. That's the Number 1 job that I'm fighting for: to become the member of Parliament for Vancouver South. If the prime minister thinks again that my skills are needed, regardless of portfolio, I'd be honoured and privileged to serve. Q: Considering you got into politics to represent Vancouver South, is there something that being defence minister prevented you from doing, and that, given another term, you'd like to take on? A: In Vancouver South, my focus has been a lot on the youth, and I've done a lot of things in the riding, but I always feel like I wish I could do more. I want people to know that I — a person who grew up in that riding — can do some interesting things, and reach this portfolio, and that every single (constituent) can reach the highest levels. So that's the one thing I wish I had a little bit more time to do. But at the end of the day, if I still had that time, I would still have that regret, because I want to make sure we inspire the next generation, because I see so much potential in them. https://ipolitics.ca/2018/12/31/a-year-end-qa-with-defence-minister-harjit-sajjan/

  • US Spies Want to Know How to Spot Compromised AI

    31 décembre 2018 | International, C4ISR

    US Spies Want to Know How to Spot Compromised AI

    BY DAVE GERSHGORN What if you were training an AI, and an adversary slipped a few altered images into its study set? The US government's research arm for intelligence organizations, IARPA, is looking for ideas on how to detect “Trojan” attacks on artificial intelligence, according to government procurement documents. Here's the problem the agency wants to solve: At a simple level, modern image-recognition AI learns from analyzing many images of an object. If you want to train an algorithm to detect pictures of a road signs, you have to supply it with pictures of different signs from all different angles. The algorithm learns the relationships between the pixels of the images, and how the structures and patterns of stop signs differ from those of speed-limit signs. But suppose that, during the AI-training phase, an adversary slipped a few extra images (Trojan horses) into your speed-limit-sign detector, ones showing stop signs with sticky notes on them. Now, if the adversary wants to trick your AI in the real world into thinking a stop sign is a speed-limit sign, it just has to put a sticky note on it. Imagine this in the world of autonomous cars; it could be a nightmare scenario. The kinds of tools that IARPA (Intelligence Advanced Research Projects Activity) wants would be able to detect issues or anomalies after the algorithm has been trained to recognize different objects in images. This isn't the only kind of attack on AI that's possible. Security researchers have also warned about inherent flaws in the way artificial intelligence perceives the world, making it possible to alter physical objects like stop signs to make AI algorithms miscategorize them without ever messing with how it was trained, called “adversarial examples.” While neither Trojan attacks nor the adversarial examples are known to have been used by malicious parties in the real world, researchers have said they're increasingly possible. IARPA is looking at a short timeline as well, expecting the program to conclude after a maximum of two years. https://www.defenseone.com/technology/2018/12/us-spies-want-know-how-spot-compromised-ai/153826

  • The Army’s ‘triad of opportunity’

    31 décembre 2018 | International, C4ISR

    The Army’s ‘triad of opportunity’

    By: Mike Gruss Lt. Gen. Bruce Crawford is quick to remind his audience that the United States Army is one of the largest organizations in the world. Crawford understands the scope because, as the service's top uniformed IT official, any way the Army wants to take advantage of the revolution taking place in information technology must go through his office. Crawford became the service's chief information officer in August 2017 and since then has focused on the move to the cloud, hiring staff and protecting data. “A lot of things that we're looking at are aspirational, but what I will tell you is institutionally we are fundamentally in a different place than we were just 12 months ago,” he said. Crawford spoke recently with C4ISRNET Editor Mike Gruss. C4ISRNET: Talk about the Army's enterprise network and the major muscle movements taking place. LT. GEN. BRUCE CRAWFORD: For about the last 18 months, the Army's been focused on the tactical network. We really needed to take a step back from 17 years of continuous combat and say, “Have we properly networked the soldier?” Of course, the answer was “No.” In terms of the enterprise, there are about three big pieces to it. One has to do with our data. It's not just about storing our data. How do we better protect our data? If you pay attention to a lot of the research, 90 percent of the data that exists in the world today has been generated just in the last 24 months. You combine that with investments in cloud. So today it's about $200 billion. By 2020-2021 it's supposed to go to about $500 billion. One of the big focus areas has to be shifting from defending our networks to how do we protect our data. C4ISRNET: What else? CRAWFORD: I call it a triad of opportunity: you have got cloud, identity and access management and credentialing. Once we put our data in a secure, accessible, elastic environment, then how are we going to make sure that we can authenticate who you are, but you can actually access that data? So, taking on the issue of identity, credentialing and access management is the second leg in that stool. Last, but certainly not least, is the power of artificial intelligence and machine learning. The real value of that data is your ability to analyze that data, to predict what some of the challenges may be. C4ISRNET: Do you expect to see two-factor authentication or biometrics being used on the battlefield? CRAWFORD: That technology is here today. The vast majority of our Guard and Reserve forces don't get a government-issued Blackberry. When they come to work, they bring their device. So why shouldn't they be able to leverage their personal device and get access to information that has been put behind a two-party authentication firewall? One of the efforts that we have ongoing is to do exactly that. We're looking at the next six months before we have that capability, at least able to test it and put it in the hands of soldiers. C4ISRNET: Some of those technologies will rely on the cloud. How does the cloud help the Army make decisions faster? CRAWFORD: Right now, the Army has 1,112 data centers. Our goal is to have about 296 centers by 2022. So, you've got to ask yourself, with cloud technology available, do we even need data centers? Being able to aggregate that data, allowing the deployed soldiers to not have to take servers to the battlefield with them. Giving them the ability to be lighter and more mobile and being able to access that data from anywhere they are on the battlefield. It's pretty powerful in terms of increasing their mobility and the survivability of their data. C4ISRNET: How does cybersecurity fit into the Army's modernization process? CRAWFORD: You've heard about this concept of multidomain operations. It's not moving from this domain to this domain to this domain; it's organizing ourselves as an Army and posturing ourselves as an institution to be lethal in all these environments at once if we had to. So this idea of cybersecurity is critical to that. It has to be a part of our DNA as we move forward. The vast majority of the intrusions and vulnerabilities are human error. Cybersecurity has to be a part of who we are. The position now is that every domain that you're operating in is a contested environment. That requires a culture change to remain lethal. C4ISRNET: We hear a lot about Agile and Waterfall development. What's needed across the Army to make sure that it happens? CRAWFORD: A shared understanding of the problem. We recognized software optimization was a problem. The Army's expending a considerable amount of resources just on software sustainment over the [Future Year Defense Program]. Recognizing that it's an issue and then pulling together key stakeholders, not just the services, but organizations like the [National Security Agency] or organizations like FBI and CIA, which can innovate at a pace much faster than we can. My No. 1 concern when it comes to software optimization has to do with the resiliency of the applications developed by industry. A lot of the applications, they work great in the lab. But when you put them on a network, especially our tactical network, and then you have to try and extend that to the disadvantaged user at the tip of the spear? A lot of the applications don't perform as well as they would in a sterile environment. Applications have got to be more resilient. C4ISRNET: The storage of data is a challenge, but also the integration between networks or databases. What are the steps you're taking to make sure that soldiers can get all the information they need? CRAWFORD: One of the efforts that excites me the most has to do with this idea of a common operating environment. You're going to take 19 disparate battle command systems and collapse them onto three specific environments — a handheld environment, a mounted environment and a command post environment — and each is going to have the same look and feel. Now think about the infrastructure. If you can collapse these systems — all with their own server farms, all with their own standards, all developed by different people, all from different organizations — if you can collapse those all onto a common operating environment, think of the things that you can divest of, but also think of the complexity. We really need to remove the burden of integration from the backs of soldiers. There is a lot of value in that, to include increased mobility for the soldier. C4ISRNET: What are some of the technologies that get you excited? CRAWFORD: The U.S. Army is the third-largest organization of any kind in the world. You've got to ask yourself, “Do we have total asset visibility? Do we have the ability to know what's on our network?” Enterprise license agreements and the things of that nature. Imagine the power of that, if you had 100-percent visibility — not just of your network from a cybersecurity perspective, but when it comes to a term that I am calling information technology accountability, or investment accountability. If you had 100-percent investment accountability, meaning you knew every time an IT dollar was spent, who spent it and was that done against one of your modernization priorities. C4ISRNET: Those are a lot of the same problems that we see in the business world. You're not starting from scratch. You can use commercial products. CRAWFORD: Absolutely. So, there are several things that we are looking to partner more closely with industry. It's the technologies that give us total asset visibility and reduce the number of tools, reduce the number of enterprise license agreements, help us with better visibility of cybersecurity. Then there's another that I'm really interested in: it's talent. Do we have the talent, right now on board, to deliver the technologies that the Army's going to need in 2028 and the answer is no. We're in a race for talent. We've got an effort called “Workforce 2028” that is looking at the 13,600 IT professionals ... We've looked and asked, “OK, what skill sets are really required, based on what we know now, in the next 5 to 10 years?” That's a tough one. C4ISRNET: What do you hope to accomplish in the next 12 months? CRAWFORD: I talked about a race for talent. That's really important that we posture ourselves to get the right people on the team. C4ISRNET: How do you measure that, though? CRAWFORD: Well, you've got to measure it in terms of knowing what skill sets you need, so there's some work that has to be done upfront and we're doing that work now. And you either began — you created a process to allow you to iterate and field the skill sets — or you didn't. It won't be that difficult to measure, but it's got to be an institutional approach. It's not just in the Pentagon. I want to be able to tell you a year from now that we have created a process or leveraged an existing process, because we've actually been granted some authorities by Congress and others over the last couple of years to better posture ourselves. The other thing has to do with protecting our data. Over the next four years, I want to put 25 percent of 8,000 existing applications in a cloud hosting environment. And I've created a process that allows us to do that. It's in support of and synchronized with where the DoD, Mr. [Dana] Deasy is going with the JEDI effort. We live in times now where status quo can no longer be the norm. https://www.c4isrnet.com/it-networks/2018/12/28/the-armys-triad-of-opportunity

  • Budget Busters: What to Look For in 2019 and Beyond

    31 décembre 2018 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Budget Busters: What to Look For in 2019 and Beyond

    By PAUL MCLEARY The release of the 2020 defense budget is still over a month away, and it's already been a wild ride. A look at what has happened, and what might happen next. WASHINGTON: If there's one complaint that has sounded a consistent across the Joint Chiefs and Pentagon leadership in recent years, it has been the lack of predictability in year-to-year funding. If there's one thing we have learned about President Trump, it's that nothing is certain until the very end. And even when there's a decision, it can be flipped, rehashed, tinkered with or forgotten about in the time it take to knock out a Tweet on phone. After two years of budget certainty in 2018-19, the 2020 submission was humming along at $733 billion — until it wasn't. In late October, the number plummeted (relatively speaking) to $700 billion, until the president was convinced by Defense Secretary Jim Mattis — not yet on his way out at the time — to rocket it up to $750 billion. But even that number isn't certain. Most analysts see the 2020 submission settling around the $733 billion level. Visiting US troops at the Al Asad air base on Dec. 26, the president gave the latest vague update. “I mean, I want to see costs come down, too. But not when it comes to our military. You have to have the finest equipment anywhere in the world, and you have that — $716 billion. And this year, again, we're going to be — don't tell anybody because nobody else knows — even a little bit higher.” Whatever the number is, it appears likely that incoming acting Defense Secretary Patrick Shanahan will be the one to deliver and defend it on Capitol Hill in February, as Mattis has been told to leave by Jan. 1. It's unclear what effect the firing of Mattis will have on the process, or if there will be any significant strategic shifts for the department given the change in leadership. As budget guru Todd Harrison of the Center for Strategic and International Studies told me this week — specifically in reference to the Space Force, but it really applies across the entire budget — “the thing to keep in mind is that this is, so far, just the Pentagon's proposal to the White House. It's not clear if the White House is going to agree to this. The president has a way of sticking to his ideas even if his own administration recommends otherwise.” Here are a few of the stories we've done over the past months breaking down what is happening, and what might — might — happen next. Full article: https://breakingdefense.com/2018/12/budget-busters-what-to-look-for-in-2019-and-beyond

  • DARPA program blending robots in the squad to find and destroy threats

    31 décembre 2018 | International, C4ISR

    DARPA program blending robots in the squad to find and destroy threats

    By: Todd South The agency that invented stealth technology, the internet, and the M16 has its sights focused on enhancing how the infantry squad works on the battlefield with robots, and advanced targeting and sensing gear. The Squad X program saw its first week-long series of tests at Twentynine Palms, California, this past year. At that event, Marine squads used air and ground vehicles to detect physical, electromagnetic and cyber threats, according to the Defense Advanced Research Projects Agency. The agency's program manager for their Tactical Technology Office, Army Lt. Col. Phil Root said that the first experiment in the program demonstrated “the ability for the squad to communicate and collaborate, even while ‘dancing on the edge of connectivity.'” Squad X Core Technologies program, or SXCT, is an ongoing effort to develop novel technologies that would “extend squad awareness and engagement capabilities without imposing physical and cognitive burdens,” according to a DARPA press release. They aim to speed the development of new, lightweight, integrated systems that provide infantry squads awareness, adaptability and flexibility in complex environments. That effort is to enable dismounted soldiers and Marines to more intuitively understand and control their complex mission environments, according to Root. Those efforts fit within wider work being done by the Close Combat Lethality Task Force, a group set up this past year to enhance close combat capabilities for infantry, special operations, scouts and some engineers. Root is also the program manager for Squad X Core Technologies. He laid out four key technical areas that the program is exploring: Precision Engagement: Precisely engage threats while maintaining compatibility with infantry weapon systems and without imposing weight or operational burdens that would negatively affect mission effectiveness. Capabilities of interest include distributed, non-line-of-sight targeting and guided munitions. Non-Kinetic Engagement: Disrupt enemy command and control, communications and use of drones. Capabilities of interest include disaggregated electronic surveillance and coordinated effects from distributed platforms. Squad Sensing: Detect potential threats at a squad-relevant operational pace. Capabilities of interest include multi-source data fusion and autonomous threat detection. Squad Autonomy: Increase squad members' real-time knowledge of their own and teammates' locations in GPS-denied environments using embedded unmanned air and ground systems. Capabilities of interest include robust collaboration between humans and unmanned systems. Some of those areas were previously explored in 2015 with DARPA's squad technology integration efforts. The tools used to detect threats in the experiments were newer, lighter, versions of previous capabilities. But the release did not provide detailed examples of the gear that Marines tested. “Each run, they learned a bit more on the systems and how they could support the operation,” said Root. “By the end, they were using the unmanned ground and aerial systems to maximize the squad's combat power and allow a squad to complete a mission that normally would take a platoon to execute.” The August event at the Marine Corps Air Ground Combat Center was one of a number of experiments in communications, cyber, EW, loitering munitions and targeting that was conducted over the past year. Both Lockheed Martin Missiles and Fire Control, and CACI's BIT Systems are working for ways to enhance infantry capabilities using manned-unmanned teaming, according to the release. Marines testing Lockheed Martin's Augmented Spectral Situational Awareness, and Unaided Localization for Transformative Squads, known as the ASSAULTS system, used autonomous robots with sensor systems to detect enemy locations, allowing the Marines to target the enemy with a precision 40mm grenade before the enemy could detect their movement, according to the release. Small units using CACI's BITS Electronic Attack Module were able to detect, locate, and attack specific threats in the radio frequency and cyber domains. This is all part of larger efforts to put more detection and fires at lower echelons in both the Army and Marine Corps. https://www.militarytimes.com/news/your-army/2018/12/30/darpa-program-blending-robots-in-the-squad-to-find-and-destroy-threats

  • Defense Outlook 2019

    31 décembre 2018 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Defense Outlook 2019

    https://www.defensenews.com/outlook/

  • Air Force begins to roll out special cyber defense teams

    31 décembre 2018 | International, C4ISR

    Air Force begins to roll out special cyber defense teams

    By: Mark Pomerleau The Air Force is beginning to build specialized cyber teams across the service whose primary mission is to defend local installations and critical mission tasks from cyberattacks. These teams will ensure that a particular wing or smaller organization can complete their mission from a cyber perspective, Maj. Gen. Robert Skinner, commander of 24th Air Force/Air Forces Cyber, told Fifth Domain in a November interview. For example, Skinner said if a wing has an F-16 unit that's responsible for offensive counter air or defensive counter air support, mission defense teams will understand those weapon system and everything that goes into making those air sorties successful as a way to defend that mission from a cyber standpoint. As an example, an eight-man team at the 2nd Weather Group within the 557th Weather Wing monitors the network and recently discovered several “bogus” account requests. The commander, Col. Patrick Williams, said the team was able to figure out that many of the requests were either bots or foreign requests that “had no business being on that network.” By working with the Network Operations and Security Center to eliminate that activity, the number of requests dropped by 80 percent, a huge win, Williams said. He added this was done with just a nascent mission defense team given that the teams are just being filled out across the major commands now. Skinner said each major command is at a different point in activating the teams. In addition, Air Force leaders said the service hopes to achieve efficiencies within its entire IT and cyber defense enterprise. The officials pointed to the Air Force's “enterprise IT as a service” pilot, which examines what efficiencies can be gained by having commercial companies conduct the IT services as opposed to having airmen maintain the IT infrastructure. One benefit of such a move could be that it frees up personnel to spend more time on cyber defense. “Our core strategic theme is moving from IT focused delivery into mission defense teams,” Bill Marion, deputy CIO of the Air Force, said during a keynote presentation in early December. Skinner said the service will likely be able to “re-mission” workers from their IT positions and assign them to these more active defensive roles such as mission defense teams. These mission defense teams are different from cyber protection teams that the Air Force, and other services, provide to U.S. Cyber Command. “In my eyes the [mission defense team] is a [cyber protection team] lite,” Skinner said. "We're very proud of our cyber protection team training and I think that the more of that I can get with our mission defense teams, the more successful they'll be and then our cyber protection teams can be really focused on the high end, the big threats that we'll run into in a peer competition and peer adversaries.” https://www.fifthdomain.com/dod/air-force/2018/12/27/air-force-begins-to-roll-out-special-cyber-defense-teams

  • Contract Awards by US Department of Defense - December 28, 2018

    31 décembre 2018 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - December 28, 2018

    NAVY Raytheon Missile Systems, Tucson, Arizona, is awarded a not-to-exceed $434,389,104 for undefinitized modification P00001 to a previously awarded, fixed-price-incentive-firm contract (N00019-18-C-1068). This modification provides for the procurement of AIM-9X Lot 18 production requirements to include 766 AIM-9X Block II all up round tactical missiles for the Navy (138); Air Force (197); and the governments of Israel (11); Norway (20); Qatar (40); South Korea (60); and the United Arab Emirates (300), as well as 160 AIM-9X Block II+ all up round missiles for the Navy (12); Air Force (75); and the governments of Australia (49); Israel (7); and the Netherlands (17). In addition, this award provides for the procurement of 170 Block II Captive Air Training Missiles for the Navy (40), Air Force (64), and the governments of Israel (6), Qatar (20), and the United Arab Emirates (40); 12 Special Air Training Missiles for the Navy (4) and the government of Australia (8); 309 all up round containers for the Navy (53), Air Force (94), and the governments of Australia (21), the United Arab Emirates (91), South Korea (17), Norway (5), Israel (7), the Netherlands (5), and Qatar (16); eight Spare Advanced Optical Target Detectors for the governments of Australia (4), the United Arab Emirates (2), and Qatar (2); 50 Spare Guidance Units (Live Battery) for the governments of the United Arab Emirates (26), South Korea (4) and Qatar (20); 35 Spare Captive Air Training Missile Guidance Units for the governments of the United Arab Emirates (15) and Qatar (20); 50 Guidance Unit Containers for the governments of the United Arab Emirates (26), South Korea (4), and Qatar (20); six Spare Advanced Optical Target Detector Containers for the governments of Australia (4) and the United Arab Emirates (2); and one Spare Block II Propulsion Steering Section for the government of Australia (1). Work will be performed in Tucson, Arizona (31 percent); Andover, Massachusetts (10 percent); Keyser, West Virginia (9 percent); Santa Clarita, California (8 percent); Hillsboro, Oregon (5 percent); Ottawa, Ontario, Canada (5 percent); Goleta, California (4 percent); Cheshire, Connecticut (4 percent); Heilbronn, Germany (3 percent); Simsbury, Connecticut (2 percent); Jose, California (2 percent); Valencia, California (2 percent), Anaheim, California (2 percent); Cajon, California (2 percent); Cincinnati, Ohio (1 percent); Anniston, Alabama (1 percent); San Diego, California (1 percent); Chatsworth, California (1 percent); Amesbury, Massachusetts (1 percent); Claremont, California (1 percent); Sumner, Washington (1 percent); and various locations within the continental U.S. (4 percent), and is expected to be completed in March 2021. Fiscal 2017 and 2018 missile procurement (Air Force); fiscal 2017 and 2018 weapons procurement (Navy); fiscal 2018 research, development, test and evaluation (Navy); and foreign military sales funds in the amount of $321,622,863will be obligated at time of award, $8,527,158 of which will expire at the end of the current fiscal year. This modification combines purchases for the Air Force ($121,460,276, 28 percent); Navy ($68,351,757, 16 percent); the governments of the United Arab Emirates ($140,486,747, 32 percent); Australia ($26,632,099, 6 percent); Qatar ($26,187,923, 6 percent); South Korea ($25,791,386, 6 percent); Israel ($9,197,285, 2 percent); Norway ($8,295,593, 2 percent); and the Netherlands ($7,986,038, 2 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Bell Boeing Joint Project Office, Amarillo, Texas, is awarded $366,623,144 for modification P00014 to a previously awarded fixed-price-incentive-firm contract (N00019-17-C-0015). This modification provides for the production and delivery of three CMV-22B variation in quantity aircraft for the Navy and two MV-22B variation in quantity aircraft for the Marine Corps. Work will be performed in Fort Worth, Texas (30 percent); Ridley Park, Pennsylvania (15 percent); Amarillo, Texas (13 percent); Red Oak, Texas (3 percent); East Aurora, New York (3 percent); Park City, Utah (2 percent); McKinney, Texas (1 percent); Endicott, New York (1 percent); various locations within the continental U.S. (27 percent); and various locations outside the continental U.S. (4 percent), and is expected to be completed in October 2023. Fiscal 2019 aircraft procurement (Navy) funds in the amount of $366,623,144 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. United Technologies Corp., Pratt & Whitney Military Engines, East Hartford, Connecticut, is awarded a $230,144,942 cost-plus-incentive-fee, fixed-price-incentive-firm contract. This contract provides for testing support for the F-35 Lightning II Propulsion System Block 4 Flight Test Program for the Navy, Marine Corps, Air Force and the non-U.S. Department of Defense (non-U.S. DoD) participants. Support to be provided includes technical engineering, flight test support, special tooling and test equipment, flight test spare and repair parts. Work will be performed at the Naval Air Station, Patuxent River, Maryland (35 percent); and Edwards Air Force Base, California (33 percent); and in East Hartford, Connecticut (32 percent), and is expected to be completed in December 2023. Fiscal 2019 research, development, test and evaluation (Navy and Marine Corps) funds in the amount of $20,000,000 are being obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to 10 U.S. Code 2304(c)(1). This contract combines purchase for the Navy ($45,760,870; 20 percent); Marine Corps ($45,760,870; 20 percent); Air Force ($91,521,740; 40 percent); and the non-U.S. DoD participants ($47,101,463; 20 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-19-C-0007). Lockheed Martin Corp., doing business as Lockheed Martin Rotary and Mission Systems, Orlando, Florida, is awarded $109,021,915 for modification P00002 to a previously awarded firm-fixed-price, cost-plus-fixed-fee, cost-reimbursable contract (N68335-18-C-0681). This modification exercises Option Period One to procure 41 electronic Consolidated Automated Support Systems (eCASS). This contract also provides for eCASS related equipment, kits and test sets in support of various Aircraft Intermediate Maintenance Departments, Fleet Readiness Centers, Aircraft Carriers and L- Class Ships. Work will be performed in Orlando, Florida (27 percent); Hunt Valley, Maryland (24 percent); San Diego, California (14 percent); North Reading, Massachusetts (14 percent); Irvine, California (6 percent); Austin, Texas (3 percent); Everett, Washington (2 percent); Bohemia, New York (2 percent); Minneapolis, Minnesota (2 percent); and various locations within the continental U.S. (6 percent), and is expected to be completed in December 2021. Fiscal 2019 aircraft procurement (Navy); and 2018 shipbuilding and conversion (Navy) funds in the amount of $109,021,915 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity. Raytheon Co., Tucson, Arizona, is awarded an $81,311,942 cost-plus-fixed-fee modification to exercise an option under previously-awarded contract N00024-17-C-5405 for design agent engineering and technical support services for the Phalanx Close-In Weapon System (CIWS), SeaRAM, and Land-based Phalanx Weapon System. Phalanx CIWS is a fast-reaction terminal defense against low- and high-flying, high-speed maneuvering anti-ship missile threats that have penetrated all other defenses. CIWS is an integral element of the Fleet Defense In-Depth concept and the Ship Self-Defense Program. Operating either autonomously or integrated with a combat system, it is an automatic terminal defense weapon system designed to detect, track, engage and destroy anti-ship missile threats penetrating outer defense envelopes. The design agent engineering and technical support services are required for maintainability, reliability and improvements. This contract involves foreign military sales to Saudi Arabia, Taiwan, Canada, United Kingdom, South Korea, Portugal and Greece under the Foreign Military Sales program. Work will be performed in Tucson, Arizona (68 percent); El Segundo, California (18 percent); Louisville, Kentucky (5 percent); Camarillo, California (2 percent); Minneapolis, Minnesota (2 percent); Dallas, Texas (1 percent); Bohemia, New York (1 percent); Melbourne, Florida (1 percent); and various locations below one percent (2 percent). Work is expected to be completed by January 2020. Fiscal 2019 operations and maintenance (Army) funding in the amount of $13,798,000; fiscal 2017 weapons procurement (Navy) funding in the amount of $2,126,000; fiscal 2018 weapons procurement (Navy) funding in the amount of $1,500,000; fiscal 2019 research, development, test and evaluation (Navy) funding in the amount of $1,252,295; fiscal 2016 shipbuilding and conversion (Navy) funding in the amount of $187,355; and foreign military sales funding in the amount of $37,500 will be obligated at time of award, and funds in the amount of $15,924,000 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. The Boeing Co., St. Louis, Missouri, is awarded a not-to-exceed $75,000,000 for undefinitized, fixed-price-incentive-firm-target modification P00002 to a previously awarded firm-fixed-price contract (N00019-18-C-1046). This modification provides for non-recurring engineering in support of the incorporation of the initial Block III capability for the production of F/A-18E/F and EA-18G aircraft. Work will be performed in St. Louis, Missouri (62 percent); El Segundo, California (33 percent); Mesa, Arizona (3 percent) and Ft. Walton Beach, Florida (2 percent), and is expected to be completed in March 2021. Fiscal 2018 aircraft procurement (Navy) funds in the amount of $35,000,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. General Electric Co., Lynn, Massachusetts, is awarded $70,752,076 for modification P00016 to a previously awarded firm-fixed-price contract (N00019-17-C-0047) for the procurement of 16 F414-GE-400 install engines for the F/A-18 aircraft for the Navy. Work will be performed in Lynn, Massachusetts (59 percent); Hookset, New Hampshire (18 percent); Rutland, Vermont (12 percent); and Madisonville, Kentucky (11 percent), and is expected to be completed in December 2020. Fiscal 2018 aircraft procurement (Navy) funds in the amount $70,752,0768 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. The Boeing Co., St. Louis, Missouri, is awarded a not-to-exceed $55,000,000 undefinitized fixed-price-incentive-firm contract for the procurement of up to six Infrared Search and Track Block II low-rate initial production III units for the F/A-18E/F series aircraft. Work will be performed in Orlando, Florida (73 percent); and St. Louis, Missouri (27 percent), and is expected to be completed in December 2021. Fiscal 2019 aircraft procurement (Navy) funds in the amount of $17,350,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-19-C-0019). Doyon Project Services LLC,* Federal Way, Washington, is awarded $36,171,741 for firm-fixed-price task order N4425519F4055 under a multiple award construction contract (N44255-17-D-4036) for the construction of five standard Type-D earth covered magazines at Naval Magazine Indian Island, Washington. The Type-D magazines will be constructed as cast in-place concrete structures with earth berm covers on grade. The project also includes the construction of a pre-engineered metal building to be used for inert storage with a two-stall forklift charging station for forklifts that will support the magazines. Other aspects of the project include fiber optic information systems, electronic security system, site preparation, paving, site improvements, electrical utilities, fire protection system, environmental mitigation, and demolition of existing buildings and roads. Work will be performed in Indian Island, Washington, and is expected to be completed by April 2021. Fiscal 2018 military construction (Navy) contract funds in the amount of $35,835,336; and fiscal 2019 operations and maintenance (Navy) contract funds in the amount of $336,405 are obligated on this award, of which $336,405 will expire at the end of the current fiscal year. Four proposals were received for this task order. The Naval Facilities Engineering Command, Northwest, Silverdale, Washington, is the contracting activity. Bell Boeing Joint Project Office, Amarillo, Texas, is awarded $23,201,950for delivery order N0001919F0031 against a previously issued basic ordering agreement (N00019-17-G-0002). This delivery order provides for MV-22 flight test sustainment; MV-22 flight test sustainment back-home support for analysis of flight tests; and flight test support for five MV-22 aircraft for the Navy, Air Force and the government of Japan. Work will be performed in Patuxent River, Maryland, and is expected to be completed in December 2019. Fiscal 2019 aircraft procurement (Navy and Air Force); research, development, test and evaluation (Navy and Air Force); and foreign military sales funds in the amount of $23,201,950 will be obligated at time of award. No funds will expire at the end of the current fiscal year. This contract combines purchases for the Navy ($18,136,470; 78 percent); Air Force ($2,879,339; 12 percent); and the government of Japan ($2,186,141; 10 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Kiewit Infrastructure West Co., Honolulu, Hawaii, is awarded a $15,419,280 firm-fixed-price contract to construct improvements to the landing areas within Marine Corps Base Hawaii properties that MV-22 Osprey aircraft will utilize for training maneuvers. The work to be performed provides for the converting of existing landing helicopterassault pad into a landing helicopter dock pad, construction of a newlanding platform dock pad, and construction of four new concrete landing pads. Work will be performed in Kaneohe Bay, Hawaii, and is expected to be completed by August 2020. Fiscal 2018 militaryconstruction (Navy) contract funds in the amount of $15,419,280 areobligated on this award; of which $3,766,478 will expire at the end of thecurrent fiscal year. This contract was competitively procured via theFederal Business Opportunities website, with five proposals received.The Naval Facilities Engineering Command, Pacific, Joint Base PearlHarbor-Hickam, Hawaii, is the contracting activity (N62742-19-C-1321). Grunley Construction Inc., Rockville, Maryland, is awarded $14,676,000 under a previously awarded firm-fixed-price contract (N40080-18-C-0033) to exercise the first and third option for the design and construction of an operational archives and research facility at the Washington Navy Yard. The construction work performed provides for the construction of the complete replacement and upgrade of the fire alarm and suppression systems; interior power and light distribution; heating, ventilation, and air conditioning and humidity controls; and installation of the tele-communications and security systems in Buildings 46 and 67. The work provides for the construction of a high capacity modular storage systems and commissioning of applicable systems of Building 169. The work also includes the construction of a sensitive compartmented information facility in Building 46. After award of these options, the total cumulative contract value will be $40,653,000. Work will be performed in Washington, District of Columbia, and is expected to be completed by March 2022. Fiscal 2019 operations and maintenance (Navy) contract funds in the amount of $14,676,000 are obligated on this award and will expire at the end of the current fiscal year. The Naval Facilities Engineering Command, Washington, Washington, District of Columbia, is the contracting activity. AIR FORCE The Boeing Co., Oklahoma City, Oklahoma, has been awarded a $400,000,000 indefinite-delivery/indefinite-quantity contract for B-1 and B-52 bomber engineering services. This contract provides for recurring and non-recurring engineering services to B-1 and B-52 aircraft. Work will be performed at Tinker Air Force Base, Oklahoma; Edwards Air Force Base, California; Barksdale Air Force Base, Louisiana; and Oklahoma City, Oklahoma. Work is expected to be complete by Dec. 31, 2019. Fiscal 2019 operations and maintenance funds in the amount of $35,232,481 are being obligated at the time of award. Air Force Life Cycle Management, Tinker Air Force Base, Oklahoma City, Oklahoma, is the contracting activity (FA8107-19-D-0001). Raytheon Co. - Integrated Defense System, Tewksbury, Massachusetts, has been awarded a $15,150,728 modification (P00029) to previously awarded contract FA8730-15-C-0002 for the Qatar Air and Missile Defense Operation Center. This modification provides for the procurement of the Qatar Alternate ADOC Prime Mission Equipment and software, and bring the total cumulative face value of the contract to $269,800,480. Work will be performed in Tewksbury, Massachusetts, and is expected to be complete by May 31, 2020. This modification involves 100 percent foreign military sales to Qatar. Air Force Life Cycle Management Center, Hanscom Air Force Base, Massachusetts, is the contracting activity. The Boeing Co., St. Louis, Missouri, has been awarded an $11,256,951 modification (FA8681-14-D-0028-001709) to contract FA8681-14-D-0028-0017 for high rate compact telemetry units (HCTMs) and long laser wire harnesses. This modification provides for the exercise of options for an additional quantity of 269 encrypted HCTMs, 30 unencrypted HCTMs, and 50 long laser wire harnesses being produced under the delivery order. Work will be performed in St. Louis and is expected to be completed by November 2020. Fiscal 2017 special defense acquisition funds; fiscal 2011 foreign military sales funds; fiscal 2018 research, development, test and evaluation funds; and fiscal 2018 other procurement funds are funding the contract. This modification involves foreign military sales to the Kingdom of Bahrain. The total cumulative face value of the contract is $33,578,408. Air Force Life Cycle Management Center, Eglin Air Force Base, Florida, is the contract activity. (Awarded Dec. 18, 2018) ARMY Raytheon Co. Missile Systems, Tucson, Arizona, was awarded a $205,205,445 cost-plus-fixed-fee contract for land-based Phalanx weapon system. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Dec. 27, 2023. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-19-D-0015). Raytheon Integrated Defense Systems, Fullerton, California, was awarded a $51,901,116 firm-fixed-price contract for the procurement of 50 Enhanced Sentinel A3 radars and associated spares. Bids were solicited via the internet with one received. Work will be performed in Fullerton, California, with an estimated completion date of Dec. 30, 2022. Fiscal 2018 other procurement, Army funds in the amount of $51,901,116 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-19-C-0018). Raytheon Integrated Defense Systems, Fullerton, California, was awarded a $28,912,871 hybrid (cost-plus-fixed-fee and firm-fixed-price) contract for Sentinel life cycle support. Bids were solicited via the internet with one received. Work will be performed in Fullerton, California, with an estimated completion date of Dec. 31, 2022. Fiscal 2019 operations and maintenance, Army funds in the amount of $4,297,000 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-19-C-0044). Georgia Vocational Rehabilitation Agency, Tucker, Georgia, was awarded a $25,800,000 firm-fixed-price contract for food service. One bid was solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of June 30, 2019. U.S. Army Mission and Installation Contracting Command, Fort Benning, Georgia, is the contracting activity (W911SF-19-D-0003). Garco Construction Inc., Spokane, Washington, was awarded a $23,481,000 firm-fixed-price contract for Survival, Evasion, Resistance, Escape pipeline dormitory at Fairchild Air Force Base, Washington. Bids were solicited via the internet with two received. Work will be performed in Fairchild Air Force Base, Washington, with an estimated completion date of Nov. 20, 2020. Fiscal 2017 military construction funds in the amount of $23,481,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Seattle, Washington, is the contracting activity (W912DW-19-C-0002). URS Federal Services Inc., Germantown, Maryland, was awarded an $18,967,634 modification (0003 54) to contract W52P1J-12-G-0028 0003 for maintenance supply and transportation logistics support services for Army Prepositioned Stock 5. Work will be performed in Camp Arifjan, Kuwait, with an estimated completion date of Jan. 2, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $4,443,831 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. Calibre Systems Inc., Alexandria, Virginia, was awarded a $17,190,846 firm-fixed-price contract for program management, technical and policy advise, recommendations, and support. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Dec. 31, 2021. U.S. Army Mission and Installation Contracting Command, Fort Sam Houston, Texas, is the contracting activity (W9124J-19-D-0004). DEFENSE LOGISTICS AGENCY Erie Engineered Products Inc.,* Lancaster, New York, has been awarded a maximum $47,766,579 firm-fixed-price requirements contract for reusable shipping and storage containers. This was a competitive acquisition with two responses received. This is a three-year contract with no option periods. Location of performance is New York, with a Dec. 27, 2021, performance completion date. Using military service is Navy. Type of funding is fiscal 2019 through 2022 non-Navy working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Philadelphia, Pennsylvania (SPRPA1-19-D-001W). WASHINGTON HEADQUARTERS SERVICES QualX Corp., Springfield, Virginia, has been awarded a $9,006,681 firm-fixed-price contract. The contract provides information management and information access support services for Washington Headquarters Services. Work performance will take place in Arlington and Springfield, Virginia. Fiscal 2019 operations and maintenance funds in the amount of $9,006,681 are being obligated on this award. The expected completion date is Jan. 16, 2022. Washington Headquarters Services, Arlington, Virginia, is the contracting activity (HQ0034-17-C-0022). MISSILE DEFENSE AGENCY CORRECTION: The Dec. 21, 2018, announcement that The Boeing Co., Huntsville, Alabama, was awarded a five-year, sole-source, cost-plus-award-fee contract [HQ0147-19-C-0001] with a period of performance of Dec. 15, 2018, through Dec. 14, 2023, and incremental funding in the amount of $54,900,000 was incorrect. The contract period of performance was actually Dec. 21, 2018, through Dec. 21, 2023, and the amount of incremental funding was $40,904,000. Also, for clarification, the five-year contract is for a three-year base period with two one-year option periods. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1722414/

  • Contract Awards by US Department of Defense - December 27, 2018

    31 décembre 2018 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - December 27, 2018

    NAVY Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded $712,482,210 for cost-plus-incentive fee, firm-fixed-price delivery order N0001919F2474 against a previously issued basic ordering agreement (N00019-14-G-0020) for the development of advanced hardware in support of the F-35 Lightning II Technology Refresh 3 (TR3) System. Efforts include the design of the TR3 System through full flightworthy certification, production readiness review, and fleet release to support low-rate initial production Lot 15 aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in March 2023. Fiscal 2018 and 2019 research, development, test and evaluation (Navy and Marine Corps); and non-U.S. Department of Defense participant (non-U.S. DoD) funding in the amount of $207,144,167 will be obligated at time of award, $13,000,000 of which will expire at the end of the current fiscal year. This delivery order combines purchases for the Marine Corps ($27,046,506; 32 percent); Navy ($24,500,000; 29 percent); and non-U.S. DoD participants ($32,506,142; 39 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Huntington Ingalls Industries, Newport News Shipbuilding Inc., Newport News, Virginia, is awarded a $228,818,298 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-2116 for the purchase of additional long lead time material in support of Enterprise (CVN 80). The purpose of this action is to definitize efforts previously announced as an undefinitized contract action and increase the scope of the contract for additional long lead time material. Work is being performed in Newport News, Virginia, and is expected to be complete by January 2023. Fiscal 2018 shipbuilding and construction (Navy) funding in the amount of $132,980,000 will be obligated at the time of award and not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington Navy Yard, Washington, District of Columbia, is the contracting activity. Dayton T. Brown Inc.,* Bohemia, New York, is awarded an $82,595,099 indefinite-delivery/indefinite-quantity contract. This contract provides for supplies and services in support of the Naval Air Warfare Center Aircraft Division's Special Missions Integrated Test Facility (AIR-5.4). Supplies and services being procured are in support of the continued development of the Mobile Mission System (MMS) family of system capabilities, MMS variants, procurement of additional MMS units, prototyping and modification for rapid mission specific system reconfiguration, test and operational deployment, maintenance, repair, refurbishment, logistics support and associated material procurements in support of the complete system of systems capabilities between the MMS, the airborne component, the ground component and the required laboratory component. Work will be performed in Patuxent River, Maryland (91 percent); and Bohemia, New York (9 percent), and work is expected to be completed December 2025. No funds are being obligated at time of award; funds will be obligated on individual delivery orders as they are issued. This contract was not competitively procured pursuant to 10 U.S. Code 2304(c)(1). The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity. Nova Group Inc., Napa, California, was awarded a $38,300,000 firm-fixed-price contract for construction to update the standby power plant and the electrical distribution system at Pacific Missile Range Facility, Makaha Ridge, Kauai, Hawaii. Work will be performed in Kauai, Hawaii, and is expected to be completed by July 2021. Fiscal 2017 military construction (Navy) contract funds in the amount of $38,300,000 are obligated on this award, of which $16,360,000 will expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with two proposals received. The Naval Facilities Engineering Command, Pacific, Joint Base Pearl Harbor-Hickam, Hawaii, is the contracting activity (N62742-19-C-1320). (Awarded Dec. 26, 2018) C.E.R Inc.,* Baltimore, Maryland, is awarded $15,668,500 for firm-fixed-price task order N4008019F4101 under a previously awarded design-bid-build, small business, multiple award construction contract (N40080-18-D-0016) for the renovation of Building 2007 at Marine Corps Base, Quantico. Building renovations includes selective demolition and repairs of existing building systems and spaces. In addition, this project will convert existing classrooms and bachelor enlisted quarters living spaces into administrative spaces. The project will also provide new electrical, Heating, ventilation, and air conditioning, hot and cold water plumbing, fire suppression, floor, roof systems, new non-classified internet protocol router and secret internet protocol router network lines and ports, as well as, demolish existing walls, floors, and ceilings; then construct administrative spaces for Marine Corps Combat Development Command headquarters. In addition to renovations, interior hazmat abatement will be performed; one elevator and new restrooms will be provided in order to meet current Americans with Disabilities Act regulation. Work will be performed in Quantico, Virginia, and is expected to be completed by October 2020. Fiscal 2019 operations and maintenance (Navy) contract funds in the amount of $15,668,500 are obligated on this award and will expire at the end of the current fiscal year. Six proposals were received for this task order. The Naval Facilities Engineering Command Washington Navy Yard, Washington, District of Columbia, is the contracting activity. Bell Boeing Joint Project Office, Amarillo, Texas, is awarded a $13,340,913 fixed-price, indefinite-delivery/indefinite-quantity contract. This contract provides for the acquisition of 218 operational test program sets for the Navy (188); Japan (15); and various foreign military sales customers (15), including non-recurring engineering to address potential obsolescence issues. Work will be performed in Ridley Park, Pennsylvania (90 percent); and St. Louis, Missouri (10 percent), and is expected to be completed in December 2024. No funds will be obligated at time of award; funds will be obligated on individual delivery orders as they are issued. This contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N6833519D0017). Insitu Inc., Bingen, Washington, is awarded $12,167,690 for firm-fixed-price delivery order N0001919F2638 against a previously issued basic ordering agreement (N00019-15-G-0014). This delivery order provides for the procurement of spare and sustainment parts that are required to maintain the RQ-21A Blackjack unmanned aircraft system in support of the Naval Supply Systems Command. Work will be performed in Bingen, Washington, and is expected to be completed in June 2019. Working capital (Navy) funds in the amount of $12,167,690 will be obligated at time of award, none of which will expire at the end of the fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Nova Group Inc.-Underground Construction Co. Inc., JV, Napa, California, is awarded an $11,350,806 firm-fixed-price modification under a previously awarded contract (N40192-14-C-1300) for equitable adjustments associated with additional munitions and explosives of concern investigations for the new pipeline and pipeline repairs at various locations off base within the Naval Facilities Engineering Command, Marianas area of responsibility. After award of this modification, the total cumulative contract value will be $78,285,823. Work will be performed in Piti, Guam, and is expected to be completed by March 2018. Fiscal 2013 military construction (Navy); and fiscal 2015 defense working capital funds in the amount of $11,350,806 are obligated on this award. Naval Facilities Engineering Command, Marianas, Guam, is the contracting activity. Huntington Ingalls Inc., Newport News, Virginia, is awarded an $11,000,000 modification to previously awarded contract N00024-18-C-2106 for the advance planning of the refueling complex overhaul of USS John C. Stennis (CVN 74). This contract modification provides supplemental material identified as required subsequent to contract award. Work is being performed in Newport News, Virginia, and is expected to complete by July 2019. Fiscal 2019 shipbuilding and conversion (Navy) funding in the amount of $11,000,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Makai Ocean Engineering Inc.,* Waimanalo, Hawaii, is awarded $9,897,213 for cost-plus-fixed-fee task order N3943019F4018 under a previously awarded multiple award contract (N39430-18-D-2047) for design, procurement, fabrication, testing and integration of components for a lightweight seafloor cable system for use in a technology demonstration at Naval Base Ventura County, Port Hueneme. The work to be performed provides for design and procurement of a wet-plant system and deployment system, as well as in-person training for government personnel and operation and maintenance manuals. Tasking includes conducting verification testing of components, sub-systems, and delivery of the complete integrated system. Work will be performed at Waimanalo, Hawaii, and is expected to be completed by March 2020. Fiscal 2019 research and development (Navy) contract funds in the amount of $9,897,213 are obligated on this award and will expire at the end of the current fiscal year. Three proposals were received for this task order. The Naval Facilities Engineering and Expeditionary Warfare Center, Port Hueneme, California, is the contracting activity. ARMY Lockheed Martin Corp., Orlando, Florida, was awarded a $64,381,000 modification (P00025) to contract W58RGZ-16-C-0008 for performance based logistics. Work will be performed in Orlando, Florida, with an estimated completion date of Dec. 31, 2019. Fiscal 2019 Army working capital funds in the amount of $64,381,000 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Georgia Power Co., Atlanta, Georgia, was awarded a $25,500,000 firm-fixed-price contract for electrical distribution services. One bid was solicited with one bid received. Work will be performed in Hunter Army Airfield, Georgia, with an estimated completion date of Dec. 31, 2023. Fiscal 2019 operations and maintenance, Army funds in the amount of $25,500,000 were obligated at the time of the award. U.S. Army Mission and Installation Contracting Command, Fort Stewart, Georgia, is the contracting activity (W9124M-19-F-0019). Longbow LLC, Orlando, Florida, was awarded a $13,028,575 modification (P00009) to contract W58RGZ-17-C-0027 for life cycle support to the fire control radar and unmanned aerial system tactical common data link assembly. Work will be performed in Orlando, Florida, with an estimated completion date of Dec. 31, 2019. Fiscal 2019 Army working capital funds in the amount of $13,028,575 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. General Dynamics Information Technology Inc., Fairfax, Virginia, was awarded a $12,187,345 modification (P00005) to contract W81K04-18-C-0001 for specialty medical training, equipment, maintenance and administration support services. Work will be performed in Camp Parks, California; Fort Gordon, Georgia; and Fort McCoy, Wisconsin, with an estimated completion date of Dec. 31, 2019. Fiscal 2019 and 2020 operations and maintenance, Army funds in the amount of $12,187,345 were obligated at the time of the award. U.S. Army Health Contracting Activity, San Antonio, Texas, is the contracting activity. Dubuque Barge and Fleeting Service Co.,* Dubuque, Iowa, was awarded a $9,959,690 firm-fixed-price contract for Mississippi River basin. Bids were solicited via the internet with two received. Work will be performed in Clinton, Iowa, with an estimated completion date of Dec. 27, 2020. Fiscal 2017 and 2018 operations and maintenance, Army funds in the amount of $9,959,690 were obligated at the time of the award. U.S. Army Corps of Engineers, Rock Island, Illinois, is the contracting activity (W912EK-19-C-0006). BGI LLC,* Akron, Ohio, was awarded a $7,761,863 modification (P00002) to contract W9133L-18-C-0002 for weapons system simulator training and support. Work will be performed in San Antonio, Texas, with an estimated completion date of Jan. 2, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $7,761,863 were obligated at the time of the award. National Guard Bureau, Arlington, Virginia, is the contracting activity. AIR FORCE BAE Systems Information and Electronics Systems Integration, Nashua, New Hampshire (FA8604-19-D-4021); The Boeing Co., Defense, Space & Security, St. Louis, Missouri (FA8604-19-D-4022); General Atomics Aeronautical Systems Inc. GS-ASI, Poway, California (FA8604-19-D-4020); Goodrich Corp., UTC Aerospace Systems, ISR Systems, Westford, Massachusetts (FA8604-19-D-4023); Harris Corp., Electronic Systems, Integrated Electronic Warfare Systems, Clifton, New Jersey (FA8604-19-D-4027); Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas (FA8604-19-D-4026); Northrop Grumman Systems Corp., Northrop Grumman Aerospace Systems, Melbourne, Florida (FA8604-19-D-4024); and Raytheon Co., Raytheon, El Segundo, California (FA8604-19-D-40250), have been awarded $22,500,000 ceiling indefinite-delivery/indefinite-quantity contracts for the formation of a collaborative working group of various industry partners to work as a single extended entity to develop, evolve, and update via pre-planned product improvement initiatives, as well as manage and provide configuration control of the Open Mission Systems and Universal Command and Control Interface standards, collectively referred to as the Open Architecture standards. These contracts provide for the development, updating and management of the above standards with the following business goals: promote adaptability, flexibility, and expandability; support a variety of missions and domains; simplify integration; reduce technical risk and overall cost of ownership of weapon system programs; enable affordable technology refresh and capability evolution; enable reuse; enable independent development and deployment of system elements; and accommodate a range of cybersecurity approaches. Work will be primarily performed in Nashua, New Hampshire; St. Louis, Missouri; Poway, California; Westford, Massachusetts; Clifton, New Hampshire; Fort Worth, Texas; and Melbourne, Florida, and is expected to be complete by Dec. 31, 2022. This award is the result of a sole-source acquisition. Air Force Life Cycle Management, Wright Patterson Air Force Base, Ohio, is the contracting activity. (Contracts awarded Dec. 14-18, 2018). Sonalysts Inc., Waterford, Connecticut, has been awarded an $11,328,749 cost-plus-fixed-fee contract for standard Space Trainer sustainment and mission-specific vendor plug-in (MSVP). This modification provides for the continued sustainment for the Space Training Acquisition Office and future development of MSVPs. Work will be performed in Waterford, Connecticut, and is expected to be completed Dec. 31, 2023. Fiscal 2019 operations and maintenance funds in the amount of $678,000 are being obligated at the time of award. Space and Missile Center, Los Angeles Air Force Base, California, is the contracting activity. DynCorp International LLC, Fort Worth, Texas, has been awarded a $9,741,897 modification (P00093) to previously awarded contract FA7014-11-C-0018 for the Very Important Person Special Air Mission contract. This contract provides for aircraft maintenance and base supply and fuels in support of aircraft assigned to the 11th Wing and 89th Wing at Joint Base Andrews-Naval Air Facility Washington, and brings the total cumulative face value of the contract to an estimated $466,547,627. Work will be performed at Joint Base Andrews-Naval Air Facility Washington, and is expected to be complete by April 30, 2019. Fiscal 2019 operations and maintenance funds in the amount of $9,741,897 are being obligated at the time of award. The 11th Contracting Squadron, Joint Base Andrews, Maryland, is the contracting activity. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1721774/source/GovDelivery/

Partagé par les membres

  • Partager une nouvelle avec la communauté

    C'est très simple, il suffit de copier/coller le lien dans le champ ci-dessous.

Abonnez-vous à l'infolettre

pour ne manquer aucune nouvelle de l'industrie

Vous pourrez personnaliser vos abonnements dans le courriel de confirmation.