What does a DAR do?

Michael Petsche

Helicopters are pretty awesome devices. Even when you understand the physics of how they work, it's still a wonder that the combination of whirling bits and pieces can result in flight. These magnificent machines put out fires, string powerlines, erect towers, pluck people in distress from mountains, and save countless lives. But here's the thing: a brand new, factory-spec helicopter right off the production line can't do any of those things. Flip through the pages of any issue of Vertical, and in almost every photo, the aircraft has been fitted with some type of special equipment.

A firefighting machine will have a cargo hook for the bucket, a bubble window, an external torque gauge, pulse lights and a mirror. A search-and-rescue aircraft will have a hoist. Air ambulances are filled with lifesaving equipment. And very little of that stuff comes directly from the airframe original equipment manufacturers (OEMs). Instead, this equipment is in place thanks to supplemental type certificates (STCs). As the name implies, an STC is required for an installation that supplements the original aircraft type certificate. It needs to meet all of the same requirements as the aircraft that it's installed upon. Therefore, it must undergo the same kind of testing, analysis, and scrutiny that the aircraft does.

How do regulatory authorities ensure that supplementary equipment meets the same standards as the aircraft they're designed to augment? Through people like me.

I am a Transport Canada Design Approval Representative (DAR), also known as a delegate. A DAR does not actually work for Transport Canada, but is delegated to act on its behalf to make findings of compliance in a particular field of specialty — such as structures, avionics, or as a flight test pilot.

To secure an STC, not only must a modification meet the same standards as the original aircraft, but it has to be shown not to degrade the safety of the aircraft. Let's take the firefighting helicopter as an example. The bubble window needs to be strong enough to withstand the aerodynamic loads in flight. In order to verify this, a structural test can be done on a test rig. However, the bubble window protrudes from the aircraft, resulting in extra drag. It could adversely affect how the aircraft behaves, or reduce climb performance, or have an effect on the pitot-static system. These are the sorts of issues that flight testing is meant to uncover.

Similarly, if someone wants to upgrade an old GPS system to the latest and greatest model, testing must be done to ensure that there is no electrical interference between the new unit and any other existing systems on the aircraft.

A big part of the STC process is determining just how you can prove that a modification meets the regulations. Does it need to be tested or is a stress analysis enough? Or is it a combination of the two — or another method entirely? And on top of that, which regulations are applicable? And furthermore, which version of the regulations needs to be applied? The rules for the Airbus H125, for example, are not the same as for the Bell 429. It's the role of the DAR (with concurrence from the regulator, in my case Transport Canada) to make these kinds of determinations.

While the STC process is technically uniform, the scope can vary widely from one project to another. Changing a seat cushion or changing an engine type can both be STCs. The execution of a project can take many forms, and is dependent on a huge number of factors, including the DAR, the project scope, the resources available, and the end user.

In my current role, I work largely on my own. The process typically begins with me submitting an application to open the project with Transport Canada. I prepare the documents and drawings, and witness and document any required testing. Then I compile it all and submit it to Transport Canada. Through all this, I will rely
heavily on the end user to provide their insight and expertise — and their facilities. After all, it's their aircraft, and they are the ones who will ultimately be installing, using, and maintaining the STC kit — so it has to make sense to them. Whenever possible, I will have documents and drawings reviewed by the maintenance team to make sure that theory and reality align.

Becoming a delegate

How does someone become a delegate? In Canada, it begins with an educational requirement. You must have an engineering degree, or have, in the opinion of Transport Canada, equivalent experience. In other words, if someone has many years of applicable experience, they can be eligible to be a delegate, even if they do not have an engineering degree.

A prospective delegate must also successfully complete the Aircraft Certification Specialty Course. This is a two-week intensive course that covers the ins and outs of aircraft certification: type certification, STCs, Change Product Rule and so on. And yes, there are exams!

Next is a one-year working relationship with Transport Canada. The process for becoming a delegate is not uniform, with the one-year timeline more of a guideline than a rule. In my case, it took less than 12 months. Prior to beginning my process, I had the good fortune of working for a talented delegate for many years. He taught me how it “should be done.” I was given the opportunity to fly at 170 knots indicated airspeed in AStars pointed at the ground during flight tests; I snapped bolts while piling steel plates onto structures during structural tests; and I wrote numerous
supporting reports for many kinds of STCs for many different aircraft types. My mentor is a (sometimes maddeningly) meticulous guy. Everything we did was thorough and correct. So, by the time I was presenting my own work to Transport Canada, it was evident that I already had a pretty firm grasp on the process. As a result, my delegation was granted before a full year.

During the period while I was building my relationship with Transport Canada, my friends would ask if I had to accomplish certain specified milestones or achieve specific “levels.” The short answer is: not really. In fact, it's about building trust. It's almost counter-intuitive that in an industry with such strict regulations, granting delegation to someone is, to a large degree, based on a “warm, fuzzy feeling.”

Ultimately, Transport Canada must have confidence in the delegate. Let's face it, we are in a business with tight schedules and high price tags. There can be a lot of pressure, financial or otherwise, to meet deadlines — and things can go wrong. Parts can fail under ultimate loading during a structural test. That cursed Velcro can fail the flammability test. And when these things happen, it can be the delegate that incurs the wrath of the angry operator who really needs to get his aircraft flying. Transport Canada must have the confidence that not only does the delegate have the technical knowledge and ability, but that they have the intestinal fortitude to stand firm under what can sometimes be difficult circumstances.

There's the somewhat cynical axiom that the only way for an aircraft to be 100 percent safe is to never let it fly. I have heard many tales of woe and misery about people's dealings with Transport Canada and how the regulator was being “unreasonable” about X, Y, or Z. I'm of the opinion that these instances often stem from poor communication — on both sides. This is another area where the DAR can help.

The DAR often acts as a liaison (or translator) between the operator and Transport Canada. Operators don't necessarily spend that much time studying design regulations. And similarly, Transport Canada engineers may not be fully familiar with the day-to-day challenges and obligations of aircraft operations. As a DAR, I speak the same language as Transport Canada. But I also spend a great deal of time in hangars, so I am also fluent in “aircraft operator.” This level of bilingualism can alleviate misunderstandings. And with a little strategic communication, everyone involved can be satisfied a lot sooner.

Not surprisingly, communication and open dialogue between the DAR and the regulator is just as crucial. It has been my experience that Transport Canada wants to help get projects completed. They are aviation geeks, just like the rest of us, and they want to “Git ‘er done.” Because I have developed a solid relationship with Transport Canada, if ever I find myself struggling with something, I can call them and ask for guidance. Obviously it's not their job to fix the issue for me, but they are there to help. Whether they point me at an Advisory Circular that I wasn't aware of, or they draw from their own experience, 99 times out of 100, talking it through with them yields a solution very quickly.

We all want to keep aircraft flying — safely. And we all have our different roles to play. As a DAR, I enjoy being the go-between for the regulatory world and the operational world. The challenge of getting them to work and play nicely together can be pretty fun — and a big part of accomplishing that goal requires earned trust and open communication.

https://www.verticalmag.com/features/what-does-a-dar-do/

Sur le même sujet

  • First Royal Canadian Air Force CC-295 shows off its final livery

    9 octobre 2019 | Local, Aérospatial

    First Royal Canadian Air Force CC-295 shows off its final livery

    The first Airbus CC-295, purchased by the Government of Canada for the Royal Canadian Air Force's (RCAF) Fixed Wing Search and Rescue Aircraft Replacement (FWSAR) program, rolled out of the paint shop showing off its final livery at the Airbus facility in Seville, Spain. The aircraft will now go through the final preparation phase before its delivery to the customer, planned to take place in Spain before the end of the year. The aircraft adopts the yellow paint scheme following the tradition defined in the 1970s for search and rescue aircraft, giving high visibility for those in the air and on the ground. The contract, awarded in December 2016, includes 16 CC-295 aircraft and all in-service support elements including training and engineering services, the construction of a new training centre in Comox, B.C., and maintenance and support services. The aircraft will be based where search and rescue squadrons are currently located: Comox, B.C.; Winnipeg, Man.; Trenton, Ont.; and Greenwood, N.S. Considerable progress has been made since the FWSAR programme was announced two and a half years ago: the first aircraft is due to be delivered in Spain in the coming months; another six aircraft are either completing flight tests or in various stages of final assembly; and seven simulators and training devices are starting up preliminary acceptance tests. The first RCAF crews started training in late summer 2019 at Airbus' International Training Centre in Seville, Spain. https://www.skiesmag.com/press-releases/first-royal-canadian-air-force-c295-shows-off-its-final-livery

  • Renouvellement des CF-18 : Boeing serait hors course

    29 novembre 2021 | Local, Aérospatial

    Renouvellement des CF-18 : Boeing serait hors course

    Boeing ne respecterait pas les exigences d'Ottawa pour ses nouveaux avions de chasse.

  • Construction of new Arctic ships, maintenance of frigates halted because of COVID-19

    19 mars 2020 | Local, Naval

    Construction of new Arctic ships, maintenance of frigates halted because of COVID-19

    DAVID PUGLIESE, OTTAWA CITIZEN Construction of the Royal Canadian Navy's new Arctic and Offshore Patrol Ships and maintenance of its frigates has been halted because of the novel coronavirus. “We are immediately suspending industrial activities at Halifax Shipyard, Marine Fabricators, and Woodside Industries related to the AOPS construction program and the Halifax-class In-Service maintenance program,” wrote Irving Shipbuilding president Kevin McCoy. “The decision became necessary given the high density of the employee population in certain work areas, high absenteeism, and reduced critical vendor support in materials and services.” Irving will review its decision on a week-by-week basis to assess the latest information about COVID-19, McCoy added. https://ottawacitizen.com/news/national/defence-watch/construction-of-new-arctic-ships-maintenance-of-frigates-halted-because-of-covid-19

Toutes les nouvelles