16 juillet 2021 | International, Terrestre

Tanks are here to stay: What the Army’s future armored fleet will look like

Armored vehicles and formations may be unrecognizable in the next decade. But the mission remains the same — take and hold terrain.

https://www.defensenews.com/news/pentagon-congress/2021/07/14/tanks-are-here-to-stay-what-the-armys-future-armored-fleet-will-look-like/

Sur le même sujet

  • Faulty $5 Parts Cause 18-Month, $1 Billion Delay to Navy, Air Force Nuclear Upgrades

    26 septembre 2019 | International, Aérospatial, Naval, Terrestre

    Faulty $5 Parts Cause 18-Month, $1 Billion Delay to Navy, Air Force Nuclear Upgrades

    Defects found in a $5 electrical component will delay the Navy and Air Force nuclear warhead refurbishment program by 18 months and cost more than $1 billion to fix, a National Nuclear Security Administration official said during a congressional hearing Wednesday. The faulty components are small commercially available capacitors that were to be used in upgrades to the Navy's W88 nuclear warheads. These weapons are deployed on the Trident II D5 submarine-launched ballistic missile systems. Similar capacitors are needed to upgrade the Air Force's B61-12 gravity bomb, Charles Verdon, deputy administrator for defense programs at the National Nuclear Security Administration, told members of the House Armed Services subcommittee on strategic forces during the unclassified portion of Wednesday's hearing. When engineers evaluated available parts, they ran tests to determine if the off-the-shelf capacitors were compatible with the systems due for upgrades, Verdon said. Initial results suggested the components would work in the short-term. “Early tests on the capacitors now in question and subsequent tests including component, major assembly and full-up integrated system flight tests demonstrated that these components meet requirement today. Industry best practices were used to stress the components beyond their design planned usage as a way to establish confidence that they will continue to work over the necessary lifetime of the warhead,” Verdon said. “During stress testing, a few of these commercially available capacitors did not meet the reliability requirements.” The problem is, these parts used in the warhead upgrades must survive for decades, up to 30 years after production, Verdon said. However, the quality of each capacitor production lot varied, which led to the stress testing failure. Instead of using the capacitors and risking readiness in the future, Verdon said his agency decided to delay the upgrade work, initially scheduled to begin in December. Replacement capacitors are being produced but will cost about $75 per unit, compared with the $5 per unit cost of the off-the-shelf capacitors that failed stress testing. “The use of commercial-off-the-shelf electric components needs to be improved to reduce future COTS-related risk,” Verdon said. The Navy is working with U.S. Strategic Command to understand how the 18-month delay will affect near-term deployments, Vice Adm. Johnny Wolfe, the director of strategic systems programs for the Navy, told the panel. “Currently, today, based on what we're doing with STRATCOM, we will meet the requirements as we move forward,” Wolfe said. The Navy and STRATCOM are developing a mitigation plan which includes is reevaluating how to turn around the submarine-based nuclear missile stockpile and how to schedule warheads for upgrades in the future, Wolfe said. More details on the Navy's plan to be discussed in a classified hearing. “If you look at the age of these systems and the technology we're using, these are tough, tough issues to solve, and it's critical technology that we're learning as we modernize these,” Wolfe said. Rep. Jim Cooper (D-Tenn.), chair of the strategic forces subcommittee, said he held the hearing because he wanted more information on what NNSA was doing to avoid more delays. He called the recapitalization “both necessary and hugely expensive” in his written opening statement. “Maintaining Congress and the public's confidence in these programs, and their effective execution, is imperative,” he wrote. https://news.usni.org/2019/09/25/faulty-5-parts-cause-18-month-1-billion-delay-to-navy-air-force-nuclear-upgrades

  • Watch India test its new homemade hypersonic vehicle

    10 septembre 2020 | International, Aérospatial

    Watch India test its new homemade hypersonic vehicle

    By: Vivek Raghuvanshi NEW DELHI — India on Monday conducted a successful test of a fully indigenous hypersonic technology demonstrator vehicle powered by an air-breathing scramjet engine, the Defence Ministry announced. With the test, India joins the U.S., Russia and China in the race for hypersonic technology development. The flight test took place Sept. 7 around 11 a.m. on an island off the coast of Odisha. The demo vehicle was indigenously developed by the government's Defence Research and Development Organisation, and it has the ability to fly at six times the speed of sound, according to defense scientists here. The ministry said the hypersonic cruise vehicle was launched using a solid rocket motor, which took it to an altitude of 30 kilometers. Then the cruise vehicle separated from the launch vehicle and the air intake opened as planned, the ministry added. “The successful demonstration proved several critical technologies including aerodynamic configuration for hypersonic manoeuvers, the use of scramjet propulsion for ignition and sustained combustion at hypersonic flow, thermo-structural characterisation of high-temperature materials, separation mechanism at hypersonic velocities, etc.,” DRDO said in a statement. A top DRDO scientist told Defense News that the vehicle will be used to launch both hypersonic and long-range cruise missiles. "DRDO has spent around $4.5 million on its [HTDV] prototype development cost, and three more tests will be carried out in the next five years to make this platform into a full-fledged hypersonic weapon that is capable of carrying both conventional and nuclear warheads, "he said. DRDO spent about $30 million on the design and development phases. Congratulating DRDO, Prime Minister Narendra Modi tweeted: “The scramjet engine developed by our scientists helped achieve a speed of 6 times the speed of sound! Very few countries have such capability today.” Defence Minister Rajnath Singh called the test a “landmark achievement” toward India becoming self-reliant and less dependent on foreign technology. “It's now time to progress to the next phase with all critical technologies being established by the successful [HTDV] flight test, using the indigenously developed scramjet propulsion system,” he added. https://www.defensenews.com/global/asia-pacific/2020/09/09/india-tests-homemade-hypersonic-vehicle

  • HENSOLDT delivers core components to Eurofighter/Typhoon self-protection system

    5 mai 2021 | International, Aérospatial

    HENSOLDT delivers core components to Eurofighter/Typhoon self-protection system

    As part of the EuroDASS consortium comprising Leonardo UK, Elettronica and Indra, HENSOLDT has received a contract valued at circa 90 Million Euros for the delivery of essential parts of...

Toutes les nouvelles