17 octobre 2022 | International, Aérospatial

Gulfstream Aerospace weighs G550 replacement for special missions

General Dynamics Corp's Gulfstream Aerospace is weighing one of its business jets to replace its popular G550 aircraft which is now out of production for special mission purposes, President Mark Burns said on Monday.

https://www.reuters.com/business/aerospace-defense/gulfstream-aerospace-weighs-g550-replacement-special-missions-2022-10-17/

Sur le même sujet

  • Elbit Systems Awarded Two Contracts in an Aggregate Amount of $200 Million to Supply Artillery C4I Solution and Hostile Fire Counter Attack Solution to a European Country

    5 septembre 2023 | International, Terrestre

    Elbit Systems Awarded Two Contracts in an Aggregate Amount of $200 Million to Supply Artillery C4I Solution and Hostile Fire Counter Attack Solution to a European Country

    The contracts will be executed until 2026, with options for further extensions.

  • The US Navy is going to need a bigger boat, and it’s getting ready to buy one

    18 septembre 2018 | International, Naval

    The US Navy is going to need a bigger boat, and it’s getting ready to buy one

    By: David B. Larter WASHINGTON — The U.S. surface Navy is moving rapidly toward buying a new large surface ship that will replace the aging cruisers, a ship that Navy leaders and experts say will need to be spacious to accommodate future upgrades and weapon systems. The office of the Chief of Naval Operations Director of Surface Warfare, or OPNAV N96, has convened a “large surface combatant requirements evaluation team” to figure out what the Navy's next large ship will look like and what it will need to do. The goal, according to the N96 head Rear Adm. Ron Boxall, will be to buy the first cruiser replacement in 2023 or 2024. The acquisition process should kick off formally next year once a capabilities development document is completed, but a few main factors are driving the size requirement, Boxall said. The fleet is pushing towards designs that can easily be upgraded without a major overhaul. To do that, the Navy thinks its going to need a lot of extra power for more energy-intensive weapons in the future, such as electromagnetic rail guns and laser weapons. “You need something that can host the [size, weight, power and cooling], so it's probably going to be a little bigger," Boxall said. "Flexibility and adaptability, the ability to upgrade quickly, is going to be a key requirement capability. It's got to have room to grow. Full article: https://www.defensenews.com/naval/2018/09/17/the-us-navy-is-going-to-need-a-bigger-boat-and-its-getting-ready-to-buy-one

  • US Army lab cuts down risk-reduction timeline ahead of Project Convergence

    24 novembre 2021 | International, C4ISR

    US Army lab cuts down risk-reduction timeline ahead of Project Convergence

    The communications exercise risk-reduction leading up to a major Army exercise last year took six weeks. Now the lab is able to fulfil that same need in 10 days.

Toutes les nouvelles