13 mai 2020 | International, Aérospatial

GKN Aerospace and Boeing extend partnership on significant military aircraft contracts

May 11, 2020 - GKN Aerospace has announced that it has signed a strategic agreement with Boeing [NYSE:BA] to solidify a continued working partnership until 2023. The agreement covers the production of structural components and assemblies for:

  • F/A-18E/F Super Hornet
  • F-15E Strike Eagle
  • C-17 Globemaster III

GKN Aerospace has been a sole-source supplier for items such as external surfaces, internal structures, wing trailing and leading edges for these Boeing aircraft since 2001.

Krisstie Kondrotis, President - Defense Business, GKN Aerospace said: “This contract not only solidifies a continued partnership with Boeing, but is a testament to the hard work and dedication of our GKN Aerospace employees. We will strive to meet our commitments under this agreement and align on future opportunities utilizing GKN Aerospace capabilities and advanced technology improvements.”

Photo caption: Boeing F/A-18

View source version on GKN Aerospace: https://www.gknaerospace.com/en/newsroom/news-releases/2020/gkn-aerospace-and-boeing-extend-partnership-on-significant-military-aircraft-contracts/

Sur le même sujet

  • Lockheed Martin wins $2.76B Army contract for guided missile rockets

    30 mars 2021 | International, Terrestre

    Lockheed Martin wins $2.76B Army contract for guided missile rockets

    The U.S. Army announced a $2.76 billion contract award to Lockheed Martin to obtain guided missile launch rocket systems and associated equipment.

  • Here’s why Boeing is getting $55.5M to fix a problem with the Air Force’s new tanker

    7 août 2019 | International, Aérospatial

    Here’s why Boeing is getting $55.5M to fix a problem with the Air Force’s new tanker

    By: Valerie Insinna WASHINGTON — The Air Force will pay up to $55.5 million for Boeing to redesign the KC-46's boom, but it will cost more than that to field a fix to the problem. According to a Aug. 2 contract announcement, the award will pay for a “system level hardware and software critical design review of the boom telescope actuator redesign,” and Boeing will receive $21 million of the proposed award value immediately. But because the contract has yet to be definitized, Boeing could receive up to $55.5 million once terms of the deal are cemented. And since initial award only covers the redesign of the boom — not the costs of testing, fabricating and retrofitting the new booms on existing aircraft — it stands to reason that the Air Force will owe additional money to Boeing to completely fix the issue. Unlike the other remaining critical deficiencies on the KC-46 program, the Air Force has agreed to foot the cost of fixing the boom problem, as it is a change in the service's initial requirements. Boeing's current boom design meets international standards for thrust resistance, and the Air Force accepted that design at Milestone C in 2016, when the KC-46 was cleared for production. But later flight tests demonstrated that the boom produces too much thrust resistance to refuel the A-10, necessitating a change in design. In January, an Air Force official told Defense News the process of redesigning and manufacturing the new booms could take about two years. The Air Force plans to buy 179 KC-46s over the life of the program. After years of delays due to technical issues, the service signed off to accept the first tanker in January, which was then delivered to McConnell Air Force Base, Kan., later that month. The KC-46 made its first flight for the initial operational test and evaluation phase on June 4 at McConnell AFB. Boeing is on the hook to pay for the other major critical deficiency: a redesign of the Remote Vision System, a collection of cameras and sensors that allow the boom operator to steer the boom into the fuel receptacle of the receiving aircraft. The service became aware of this problem after pilots experienced difficulties directing the boom during refueling, sometimes scraping the surface of the receiver aircraft — a mistake that could compromise the low observable coating of stealth aircraft. Despite this issue, the Air Force has decided to accept KC-46 tankers so that pilots can begin training with the new aircraft. However, the service is withholding up $28 million per plane in order to incentivize Boeing to move quickly on a redesigned RVS. About $360 million has been withheld so far, according to Defense One. https://www.defensenews.com/air/2019/08/06/heres-why-boeing-is-getting-555m-to-fix-a-problem-with-the-air-forces-new-tanker/

  • CACI Awarded $197 Million Task Order to Support Special Electronic Mission Aircraft Flight Operations for U.S. Army

    25 septembre 2019 | International, Aérospatial

    CACI Awarded $197 Million Task Order to Support Special Electronic Mission Aircraft Flight Operations for U.S. Army

    ARLINGTON, Va.--(BUSINESS WIRE)-- CACI International Inc (NYSE:CACI) announced today it has been awarded a more than four-year task order, with a ceiling value of $197 million, to support the U.S. Army Fixed Wing Project Office's special electronic mission aircraft flight operations worldwide. Under the task order, CACI will use its proven technical and training solutions for operational mission support to provide 24/7 surveillance and reconnaissance assistance to U.S. and NATO forces deployed abroad. Awarded under the RS3 contract vehicle, the work represents new work for CACI. John Mengucci, CACI President and Chief Executive Officer, said, “CACI will leverage its successful surveillance and reconnaissance expertise to provide the U.S. Army with comprehensive flight operations support. We are committed to delivering advanced technology and highly qualified personnel to meet our customers' evolving requirements.” CACI Executive Chairman and Chairman of the Board Dr. J.P. (Jack) London, said, “CACI is prepared to advance and support the critical surveillance and reconnaissance capabilities the U.S. Army needs to accomplish its mission and safeguard our nation.” CACI's 22,000 talented employees are vigilant in providing the unique expertise and distinctive technology that address our customers' greatest enterprise and mission challenges. Our culture of good character, innovation, and excellence drives our success and earns us recognition as a Fortune World's Most Admired Company. As a member of the Fortune 1000 Largest Companies, the Russell 1000 Index, and the S&P MidCap 400 Index, we consistently deliver strong shareholder value. Visit us at www.caci.com. There are statements made herein which do not address historical facts, and therefore could be interpreted to be forward-looking statements as that term is defined in the Private Securities Litigation Reform Act of 1995. Such statements are subject to factors that could cause actual results to differ materially from anticipated results. The factors that could cause actual results to differ materially from those anticipated include, but are not limited to, the risk factors set forth in CACI's Annual Report on Form 10-K for the fiscal year ended June 30, 2019, and other such filings that CACI makes with the Securities and Exchange Commission from time to time. Any forward-looking statements should not be unduly relied upon and only speak as of the date hereof. CACI-Contract Award View source version on businesswire.com: https://www.businesswire.com/news/home/20190925005100/en/ Corporate Communications and Media: Jody Brown, Executive Vice President, Public Relations (703) 841-7801, jbrown@caci.com Investor Relations: Daniel Leckburg, Senior Vice President, Investor Relations (703) 841-7666, dleckburg@caci.com Source: CACI International Inc https://www.epicos.com/article/486889/caci-awarded-197-million-task-order-support-special-electronic-mission-aircraft

Toutes les nouvelles