12 juin 2018 | Local, Terrestre

Eurosatory 2018: Rheinmetall Canada unveils production-ready Mission Master Cargo unmanned ground vehicle

Rheinmetall Canada has unveiled a newly named Mission Master Cargo unmanned ground vehicle (UGV), which is a new version of the Multi-Mission UGV that was first revealed at IDEX in February 2017. The platform is designed for direct support of dismounted troops and is available in a cargo and casualty evacuation version, and a surveillance and reconnaissance version. The new UGV was revealed during Eurosatory 2018 in Paris, and Rheinmetall Canada spoke to Jane's prior to the event.

Modules can be swapped in and out as required, so the UGV can fulfil mission sets including logistics support; weaponised; chemical, biological, radiological, and nuclear and explosives (CBRNE); and communications relay. “The end user can buy either a surveillance module, CBRN module or fire suppression module and clip it onto the vehicle itself with no modification required. The software can integrate and interact with any of those mission modules that are already embedded into every single UGV,” Alain Tremblay, vice-president of business development for Rheinmetall Canada, told Jane's.

In the weaponised role, the platform is fitted with a remote weapon station featuring a 12.7 mm machine gun. Live fire testing was done at the end of 2017 on a military base in Canada to trial how the UGV could lock onto a target, the target then be confirmed by operators, and the platform fire by itself up to a range of 800 m.

Tremblay noted that any type of remote weapon station, regardless of the manufacturer, can be fitted to the platform. “The open architecture of the software allows anything to be mounted, even a Russian type missile which has a different architecture system to the western world,” he said. “Early next year we are going to be starting to work on a medium calibre 20 mm remote weapon station for the same platform which is actually not that difficult to do.

http://www.janes.com/article/80789/eurosatory-2018-rheinmetall-canada-unveils-production-ready-mission-master-cargo-unmanned-ground-vehicle

Sur le même sujet

  • 'Too much noise' on Canadian warship program - DND Deputy Minister admonishes industry executives

    17 décembre 2020 | Local, Naval

    'Too much noise' on Canadian warship program - DND Deputy Minister admonishes industry executives

    David Pugliese • Ottawa Citizen Dec 14, 2020 • Last Updated 3 days ago • 6 minute read Defence industry executives have been told by a top bureaucrat to stop raising concerns about the controversial program to build a new fleet of warships that is now estimated to cost $70 billion and could go even higher. Company officials have been complaining to politicians and media outlets that the Canadian Surface Combatant project has fallen far short on its promises of creating domestic employment. Another company is in the middle of a lawsuit over the Canadian Surface Combatant or CSC, alleging the procurement was bungled. Federal lawyers are trying to limit the amount of information that can be disclosed in court about the project, with the next hearing to be held Jan. 13. Other industry executives have been warning politicians the rising price tag for CSC will jeopardize funding for other equally important military equipment projects. But Jody Thomas, deputy minister of the Department of National Defence, told executives Oct. 5 that they are hindering the project and she characterized their efforts as being those of sore losers. “I think there's still too much noise from unsuccessful bidders that makes my job and Bill's job very difficult,” she said, referring to Bill Matthews, deputy minister at Public Services and Procurement Canada. The CSC project would see the construction of 15 warships for the Royal Canadian Navy at Irving Shipbuilding on the east coast. Construction of the vessels, to replace the current Halifax-class frigate fleet, isn't expected to start until 2023. But the project has already faced delays and significant increases in cost as the price tag has climbed from an original $14 billion estimate to around $70 billion. In an email to this newspaper about Thomas's statement to defence executives, the DND noted that industry officials have the right to raise their concerns with politicians or turn to the courts if needed. “However, the Department of National Defence, including the Deputy Minister, works for Canadians,” the DND stated. “While we maintain close, positive working relationships with industry, our primary responsibility is to the Canadian taxpayer.” But Thomas's admonishment didn't surprise industry representatives; although they won't go on record with their names for fear of jeopardizing future military contracts, a number of executives point out that for years federal officials have tried to keep a lid on questions and concerns as well as information about the CSC. A review of past actions by the current Liberal and previous Conservative governments and internal documents obtained by this newspaper through the Access to Information law appear to support that view. Federal officials have on two occasions tried to stymie attempts by the Parliamentary Budget Officer to obtain details and budget outlines of the CSC project, as well as with other vessel construction programs under the government's National Shipbuilding Strategy. In 2019, officials with Public Services and Procurement Canada issued a directive that firms interested in maintenance work on the Canadian Surface Combatant program could not talk to journalists and instead must refer all inquiries to the department. That was the fifth such gag order on military equipment projects issued by government over a year-long period. In one case, Procurement Canada threatened to punish any firms who violated the gag order on the proposed purchase of a light icebreaker. That prompted one unnamed company to submit a question to the department on whether a government ban on talking to journalists was even legal, according to records. Industry executives pointed out last year the secrecy was not based on security concerns, but on worries the news media would be able to use the information to keep close tabs on the problem-plagued military procurement system. After this newspaper reported on the gag orders, Procurement Canada claimed last year it would no longer use such bans. Michael Byers, a professor at the University of British Columbia who has produced two studies on the troubled federal shipbuilding program, said government officials have repeatedly tried to limit the amount of information available on the CSC and other shipbuilding projects. “These projects are in serious trouble and when you have those problems, combined with politics, the pressure to keep things secret are very very high,” he explained. Federal officials appear to be concerned specifically about journalists who might be reporting on two particular ship projects; the CSC and the Arctic and Offshore Patrol Ships or AOPS. Both projects involve Irving Shipbuilding. Documents show Irving representatives and bureaucrats from Procurement Canada (then called Public Works) warned DND procurement official Ian Mack in April 2013 that CBC journalist Terry Milewski was working on a story about the high costs of the AOPS and the fact that other nations paid a fraction of what Canadian taxpayers were being charged for similar vessels. Six days after Mack sent his warning out to other bureaucrats, Milewski produced his report. In 2016, Public Works officials alerted Minister Judy Foote's office this newspaper was asking questions about the CSC. Foote's office, in turn, warned Irving representatives. In March 2019, the DND and Public Services and Procurement Canada warned Irving Shipbuilding this newspaper was asking questions about problems with welds on the AOPS. Documents show that after a series of questions were submitted by this newspaper to the DND, PSPC deputy minister Bill Matthews, DND deputy minister Thomas and Pat Finn, then DND's top procurement official, held a conference call with Irving President Kevin McCoy. McCoy briefed “Jody, Bill, Pat” about the company's plans to sue this newspaper if it “published anything that impugned our professional reputation.” There is no indication in the document that the bureaucrats raised any objections to the company's strategy. Thomas took no notes during the conference call, according to the department's Access to Information branch. Matthews responded to Irving's decision with a supportive email. “Welcome to my world,” Matthews wrote to McCoy. Matthews has declined requests to be interviewed by this newspaper. In an email, the department stated the deputy minister's comment was referring to the fact defence procurement “is a highly complex environment, in which we often face criticism about our processes and decisions.” DND confirmed to this newspaper that there had been minor issues with welding on the AOPS and the article was published. In May 2019, the Globe and Mail also reported federal officials alerted Irving the newspaper was seeking information from the Department of Innovation, Science and Economic Development about whether the French fry plant investment qualified as an industrial benefit for the Arctic ship project. After the Globe sent two emails to the department's media relations branch, the newspaper received a letter from a lawyer working for Irving. The letter threatened legal action if the article contained any allegations of improper conduct. Innovation, Science and Economic Development spokesman Hans Parmar stated in an email that Irving was told of the media inquiry as part of the department's policy to ‘'encourage transparency.'' At the time, Irving spokesman Sean Lewis said while the firm respects the work of journalists, in the case of the Globe and this newspaper the company threatened legal action because the news organizations “had highly inaccurate information that would cause our company, and the reputation of our hardworking employees, considerable reputational damage.” In the case of the Globe, Irving confirmed it had received the approximately $40 million industrial benefit credit for the French fry plant. The incident with the Globe and Mail also revealed bureaucrats at Innovation, Science and Economic Development Canada had a system to alert Irving each time a journalist asked questions about AOPS. The department claimed it was required to do so according to its contract with Irving. However, that contract contains only a general reference to coordinating public communications. It is unclear whether the department has established a similar system for the CSC project. The department did not answer questions about how many times it has shared information about journalists with Irving officials. Asked about how many times Innovation, Science and Economic Development Canada has alerted Irving about journalists asking questions about shipbuilding matters, company spokesman Thomas Ormsby responded: “We do not discuss customer contracts.” https://ottawacitizen.com/news/national/defence-watch/too-much-noise-on-canadian-warship-program-dnd-deputy-minister-admonishes-industry-executives

  • Airbus reports strong progress in generating FWSAR work in Canada

    7 décembre 2018 | Local, Aérospatial

    Airbus reports strong progress in generating FWSAR work in Canada

    Airbus reports it is on track to provide Canadian industry with the required level of high-value work associated with the fixed-wing search and rescue (FWSAR) aircraft replacement in-service support (ISS) program. In its first FWSAR Value Proposition ISS annual report to the Government of Canada, submitted earlier this year and covering 2017, the company declared that more than 80 per cent of the ISS work was already being performed by Canadian industry in Canada. That data has now been validated and accepted by Canada. The activity, led by Airbus and its Canadian ISS integration partner AirPro – a joint venture with PAL Aerospace – is rapidly generating work and employment at partners such as CAE and Accenture. AirPro itself has already recruited nearly 20 highly qualified full-time staff to work on FWSAR ISS, and is adding resources in fields such as aeronautical engineering, architecture, construction, information technology and project management. More than 125,000 Canadian labour hours of work were performed by five companies in 2017 and the figure will grow more rapidly as many other companies begin their supply roles further into the program. The AirPro activity in particular will markedly increase as the Airbus CC-295 aircraft enters service and day-to-day ISS activities such as maintenance begin. Simon Jacques, president of Airbus Defence and Space in Canada, said: “We are proud of having made such a successful start to the development and transfer of capability to Canada with all the associated high value work that it brings. Ensuring an active role for AirPro in this set-up phase will ensure that it has a solid preparation for its ISS role in the operational phase. And this new expertise has the potential to be reused in other Canadian programs.” Canada's Industrial and Technological Benefits (ITB) Policy applies to the FWSAR contract and ensures that the total value of the contract is leveraged resulting in high-value jobs in the Canadian economy. The FWSAR program is supporting some $2.5 billion in Industrial and Technological Benefits to Canada, through high-value, long-term partnerships with Canadian industry. “The work done in Canada as part of the fixed-wing search and rescue project demonstrates the tangible benefits of our Industrial and Technological Benefits Policy for Canadian industry,” said the Honourable Navdeep Bains, minister of Innovation, Science and Economic Development. “This project will provide the Canadian Armed Forces with the equipment and services they need to keep Canada safe, and the Industrial and Technological Benefits Policy ensures Canadians have access to middle-class jobs, growing our economy along the way.” https://www.skiesmag.com/press-releases/airbus-reports-strong-progress-in-generating-fwsar-work-in-canada

  • Flash-conférence avec le Commandant de la Marine royale canadienne - jeudi 8 déc.-22 à 19h

    6 décembre 2022 | Local, Naval

    Flash-conférence avec le Commandant de la Marine royale canadienne - jeudi 8 déc.-22 à 19h

    Bonjour à tous,   Nous souhaitons vous inviter à un flash-conférence, en français, organisé par l'Institut militaire de Québec (IMQ) dans le cadre de la tenue du Conseil de la marine à Québec. La conférence virtuelle se tiendra sur Zoom, le jeudi 8 décembre 2022 à 19h00.   Le Commandant de la Marine royale canadienne (MRC), le Vice-amiral Angus Topshee, OMM, MSM, CD partagera sa vision de l’avenir de la marine canadienne. Une occasion d’obtenir une mise à jour éclairante sur les activités de la MRC et son implication dans les opérations internationales à venir.   Voici les détails de la connexion : No de réunion : 829 4516 7595 Code secret : imq1929$ Lien d’accès direct : https://us02web.zoom.us/j/82945167595?pwd=L0JaRmhFbjdtdzJ3VWRpUzRUYXJxUT09   En espérant vous avoir des nôtres (virtuellement)!   //   Good day,   We would like to invite you to a flash conference, in French, organized by the Institut militaire de Québec (IMQ) in the context of the Conseil de la marine in Quebec City. The virtual conference will be held on Zoom on Thursday, December 8, 2022, at 7:00 p.m.   The Commander of the Royal Canadian Navy (RCN), Vice-Admiral Angus Topshee, OMM, MSM, CD will share his vision of the future of the Canadian Navy. An opportunity to get an enlightening update on the activities of the RCN and its involvement in upcoming international operations.   Here are the connection details: Meeting number: 829 4516 7595 Secret code: imq1929$ Link:  https://us02web.zoom.us/j/82945167595?pwd=L0JaRmhFbjdtdzJ3VWRpUzRUYXJxUT09   Hoping to have you with us (virtually)!

Toutes les nouvelles