13 mars 2024 | International, Terrestre

Denmark plans $6 bln boost in military spending amid defence shortcomings

Sur le même sujet

  • Navy Awards Sikorsky $1.13B for Next 12 CH-53K Heavy-Lift Helicopters

    22 mai 2019 | International, Aérospatial, Naval

    Navy Awards Sikorsky $1.13B for Next 12 CH-53K Heavy-Lift Helicopters

    By: Megan Eckstein The Department of the Navy awarded Sikorsky a $1.13-billion contract for 12 CH-53K King Stallion heavy-lift helicopters, the Defense Department announced on Friday. The contract to the Lockheed Martin-owned company covers Lots 2 and 3 of the helicopter, which will replace the aging CH-53E Super Stallion. The Navy plans to buy 200 CH-53Ks over the life of the program. This award comes after an overhaul of the helicopter's test program, which had fallen behind due to inefficiencies in the test plan and technical problems in the design of the aircraft. Those problems included an exhaust gas reingestion problem in the helo's three-engine design. A recent Pentagon Selected Acquisition Report noted 126 design deficiencies, Bloomberg has reported, and the Department of the Navy has since worked with Sikorsky to restructure the remaining test program. After cost growth in the Lot 1 contract for the helicopters, the Navy and Marine Corps reduced this contract to 12, compared to a previous plan to buy 14 under Lots 2 and 3. “The aircraft quantity was negotiated for 12 vice 14 aircraft due to cost growth identified during Lot 1 production as well as the cost of incorporating the correction of known technical deficiencies that have resulted from developmental flight test to date,” Navy spokesman Capt. Danny Hernandez told USNI News. “The lower quantity will allow the program to afford the aircraft while preserving planned support efforts within the budget and program schedule.” In a Friday news release, Navy and Marine Corps leadership expressed confidence in the program despite the challenges it has faced over the past year or so. “The Marine Corps is very appreciative of the efforts by the Navy and our industry partners to be able to award the LRIP 2/3 contract,” Lt. Gen. Steven Rudder, the deputy commandant for aviation, said in a news release. “This is a win for the Marine Corps and will secure the heavy-lift capability we need to meet future operational requirements and support the National Defense Strategy. I'm very confident in the success of the CH-53K program and look forward to fielding this critical capability.” “This contract award reflects close cooperation and risk sharing between the Government and industry teams to deliver critical capabilities to the Marine Corps,” James Geurts, assistant secretary of the Navy for research, development and acquisition, said in the release. “Working with our industry partners, the team ensured that solutions for technical challenges are incorporated into these production aircraft. This reflects the urgency to ensure we deliver capabilities necessary to support the Marine Corps and the Department of Navy's mission, while continuing to drive affordability and accountability into the program.” In a House Armed Services Committee hearing earlier this spring, Daniel Nega, the deputy assistant secretary of the Navy for air programs, told lawmakers on the tactical air and land forces subcommittee that the upcoming contract would put the onus on Sikorsky to address remaining design flaws and fix any other problems that come up during the remainder of testing. “The flight envelope's been tested to the corners; Gen. Rudder talked about how we've sort of wrung it out,” he said at the hearing. “There's a relatively low risk that anything major will be found. However, if nuisance issues come along, we are not going to give those nuisance issues to the Marines, and the Navy and Marine Corps team is not going to accept the full risk of that. So the risk concurrency between the development and the production, that overlap is going to be taken care of.” Asked how the contract awarded today would do that, Hernandez told USNI News that “the production contract is structured to ensure a deployable configuration is delivered for fleet use. All known issues are included in the contract, additionally the contract provides provisions for any new issues discovered during flight testing. This will ensure appropriate shared risk between the government and industry.” Sikorsky's Path Forward Despite the ongoing technical challenges with the helicopter design and the delays in the test program – which has set back the planned start of initial operational test and evaluation but does not appear to threaten the planned first deployment of the helicopter in 2023 or 2024 – Sikorsky officials remain confident that the aircraft is on the right path following last year's restructure. “The majority of the technical issues that we've discovered over the 1,400 hours of flight test, nothing too terribly different than we would expect to find on a development program,” Bill Falk, Sikorsky's program director for CH-53K, told USNI News in an interview earlier this month. “The majority of them are already resolved, already proven and demonstrated in aircraft. We do have a set of issues that we still are in the process of resolving and demonstrating, but we've got a plan in place, parts installing in the aircraft and flight test plans to demonstrate that.” Falk said the company has dedicated one of its six test aircraft to tackle the exhaust gas reingestion issue, spending the last four or five months using computer-aided modeling and data from test flights to develop prototype solutions and test them out on the aircraft. “We have enough data that we now understand what solution we need to install on the aircraft, demonstrate and validate, which will become part of the production solution,” Falk said. “So we are at a completely different spot: where there was uncertainty four to five months ago, we have complete confidence now.” The new test plan is also more focused than the original one, tying each flight test to the delivery of a specific capability rather than just flying for flying's sake, Falk told USNI News. The helicopter has already demonstrated that it meets or exceeds all requirements for speed, range, altitude, lift capacity and more. Sikorsky and the Navy/Marine Corps team have also conducted hot weather and brownout condition testing in Arizona, and they have certified the helicopter can be transported via C-5 and C-17 cargo planes. A key upcoming test will be sea trials, where the CH-53K will have to prove it can fly on and off a flight deck and that Marines can maintain it at sea. Falk said the Navy is looking at a window of late February or early March through May of 2020 for sea trials, and that the tests will take place aboard a yet-to-be-decided amphibious assault ship. Initial operational test and evaluation is set to begin in early 2021, which would allow the Marine Corps to declare initial operational capability in time for the first deployment in 2023 or 2024. Though work still remains to be done, Paul Fortunato, director of Marine Corps business development at Sikorsky, and John Rucci, the company's senior experimental test pilot for the CH-53K, said the new helicopter has already proven it is easier to operate and maintain than its predecessor and that its warfighting capability surpasses the requirements for the aircraft. Rucci said pilots have total trust in the fly-by-wire cockpit, which essentially lands the helicopter on its own – meaning the pilots can focus on the mission at hand or evading a threat, or can safely land in a sandstorm or other degraded conditions. And Fortunado said the helo was built with easy maintenance in mind: fewer tools are required, the all-electronic maintenance documents include graphics that maintainers can zoom in on and rotate to help them maintain or repair parts, the logistics footprint is smaller and easier for deployments aboard amphibious ships. The design even includes putting electronic components in “backwards,” meaning the connections are facing outwards and easily accessible when maintainers take off a panel, instead of the wiring being in the back like usual and requiring a Marine to use a mirror to see what is going on behind the component. At Marine Corps Air Station New River in North Carolina, Falk said, Marines are using one of the system demonstration test article (SDTA) helicopters to work out any remaining issues in the maintenance manuals and to start learning more about how to fix and sustain the new helo. “There's Marines crawling around that aircraft, taking it apart, putting it back together again, running the maintenance procedures, and basically using what we developed in order for them to be able to maintain the aircraft,” Falk said. “So the opportunity for us before we start delivering production aircraft, we can learn from that, we can feed all that back, we can improve our maintenance procedures and basically when the aircraft is deployed deliver a much higher-quality, more efficient set of maintenance instructions. Plus, you've got Marines that have already used it, done it, learned.” https://news.usni.org/2019/05/17/navy-awards-sikorsky-1-13b-for-next-12-ch-53k-heavy-lift-helicopters

  • Israel touts upgraded Iron Dome capabilities against land, maritime threats

    3 février 2021 | International, Aérospatial

    Israel touts upgraded Iron Dome capabilities against land, maritime threats

    By: Seth J. Frantzman JERUSALEM — An upgraded version of the Iron Dome air defense system has reached a “significant milestone” after contending with advanced threats in a test, Israel's Ministry of Defense announced Feb. 1. The Iron Dome is part of Israel's multilayered air defense and has been in service for a decade with more than 2,400 interceptions, mostly of projectiles launched from the Gaza Strip by militants. Two Iron Dome batteries were delivered to the U.S. Army in the last six months. “The Israel Missile Defense Organization (IMDO), in the Directorate for Defense R&D of the Israel Ministry of Defense, and Rafael Advanced Defense Systems have completed a successful series of flight tests of the Iron Dome weapon system,” Israel's Ministry of Defense said. “The Israeli Air Force (IAF) and Navy also participated in the test, which was conducted in a base in central Israel. The test campaign was held in a number of scenarios simulating advanced threats with which the Iron Dome is expected to contend during times of conflict — whether on land or in the sea.” The new system is expected to be delivered to the Israel Air Force for operational use — though it's unclear when — and then later installed on Israel's new Sa'ar 6 corvette, which arrived last year from Germany. It is expected to equip this new class of warships, which will be equipped with a variety of advanced Israeli systems in the coming years. The new ships are supposed to defend Israel's exclusive economic zone off the country's coast. Israel has expanded its infrastructure off the coast in the last several years due to natural gas discoveries in its exclusive economic zone, and the country signed a deal to build an Eastern Mediterranean pipeline to Greece via Cyprus last year. In the 2006 Lebanon war, the militant group Hezbollah fired a C-802 missile at a Sa'ar 5 ship. Egyptian and Saudi Arabian ships have also contended with anti-ship missile threats in recent years from Sinai and Yemen, respectively. Israel's Rafael would not elaborate on specifics of the test or the new capabilities. The ministry also would not provide further details beyond its statement. Video released by the ministry showed the logos of the companies involved, including the prime contractor Rafael; IAI, whose subsidiary Elta Systems is the maker of the multimission radar; and mPrest, which produces the BMC command-and-control system. The video also showed target drones launched over the water before Iron Dome intercepted them. It also showed several other quadcopter-style drones prior to takeoff, but it's unclear if they were targets in the drill. In mid-December, Israel launched an unprecedented integration test of its air defense systems, including Iron Dome, David's Sling and Arrow. During the test, Iron Dome was used to intercept cruise missiles — a new capability for the system. Drones and cruise missiles were used by Iran in September 2019 in an attack on Saudi Arabia, which led to concerns at the time over whether air defense systems were ready to confront drone swarm attacks or contend with slow and low-flying, maneuverable missiles. Iron Dome has received U.S. funding that tops about $500 million annually for joint air defense projects with Israel. In August 2020, Rafael and American firm Raytheon Technologies agreed to a joint venture to build Iron Dome in the United States. The facility builds the system and its Tamir interceptor, which is called SkyHunter, in the U.S. At the time, the system was said to be capable of intercepting cruise missiles, unmanned aircraft, rockets, artillery and mortars. When Israel completed the delivery of its second battery to the U.S. on Jan. 3, 2021, Israeli Defense Ministry Benny Gantz said he was “confident the system would assist the US Army in protecting American troops from ballistic and airborne threats as well as from developing threats in the areas where US troops are deployed on various missions.” Subsequent reports in Israeli media hinted that the U.S. might deploy the system to the Gulf where it has bases. Israel's MoD did not comment on the reports. The U.S. previously sent Patriot batteries as well as counter-rocket, artillery and mortar systems to defend against threats in the Gulf region. https://www.defensenews.com/training-sim/2021/02/02/israel-touts-upgraded-iron-dome-capabilities-against-land-maritime-threats

  • Contract Awards by US Department of Defense - June 12, 2020

    15 juin 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - June 12, 2020

    DEFENSE LOGISTICS AGENCY US Foods, Los Angeles, California, has been awarded a maximum $525,250,000 firm-fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for full-line food distribution. This was a competitive acquisition with three responses received. This is a five-year contract with no option periods. Location of performance is California, with a June 12, 2025, ordering period end date. Using customers are Army, Marine Corps, Navy, Air Force, Coast Guard and federal civilian agencies. Type of appropriation is fiscal 2020 through 2025 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-20-D-3278). Sysco Hampton Roads, Inc., Suffolk, Virginia, has been awarded a maximum $377,791,948 fixed-price with economic-price-adjustment, indefinite-quantity contract for full-line food distribution. This was a competitive acquisition with two responses received. This is a two-year base contract with one one-year option period and one two-year option period. Location of performance is Virginia, with a June 9, 2025, ordering period end date. Using military services are Air Force, Army, Coast Guard, Marine Corps and Navy. Type of appropriation is fiscal 2020 through 2025 defense working capital funds. The contracting agency is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE300-20-D-3277). Federal Contracts Corp., Tampa, Florida, is sharing a maximum $189,261,484 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for agricultural equipment. This was a competitive acquisition with 10 responses received. Other contracts have been awarded under this solicitation (SPE8EC-17-R-0007) and additional awards are expected. Awardees will compete for a portion of the maximum dollar value. This is a five-year base contract with no option periods. Location of performance is Florida, with a June 11, 2025, ordering period end date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2020 through 2025 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE8EC-20-D-0060). NAVY Lockheed Martin Corp., Owego, New York, is awarded a not-to-exceed $375,488,269 undefinitized contract modification (P00014) to a previously awarded firm-fixed-price, cost-plus-fixed-fee contract (N00019-19-C-0013). This modification provides non-recurring efforts to design and develop unique hardware and software for the Multi-Role Helicopter MH-60R development program for the government of India. Work will be performed in Owego, New York (81%); and Stratford, Connecticut (19%), and is expected to be complete by June 2025. Foreign Military Sales funds for $117,700,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $183,815,073 modification (P00096) to a previously awarded firm-fixed-price, fixed-price-incentive-fee, cost-plus-fixed-fee contract (N00019-15-C-0003). This modification incorporates additional operation, security and technical services in support of the F-35 Lightning II program for the Republic of Korea. Work will be performed in Fort Worth, Texas, and is expected to be complete by January 2021. Foreign Military Sales funds in the amount of $183,815,073 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Scientific Systems Co. Inc.*, Woburn, Massachusetts, is awarded a $9,575,556 cost-plus-fixed-fee order (N68335-20-F-0006) against a previously issued basic ordering agreement (N68335-15-G-0030). This order provides for continuing improvement of the software development processes to enhance cybersecurity and software safety for the Image Based Navigation for Vertical Take-off and Landing Tactical Unmanned Aerial Vehicle Shipboard Landing program in support of the MQ-8 Fire Scout unmanned air vehicle. This is a Small Business Innovation Research (SBIR) Phase III for research and development performed under the SBIR topic numbers N112-127, N03-025 and AF06-149. Work will be performed in Woburn, Massachusetts (95%); and Bedford, New Hampshire (5%), and is expected to be complete by June 2023. Fiscal 2020 research, development, test and evaluation (Navy) funds for $50,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity. Engility Corp., Andover, Massachusetts, is awarded a $7,956,180 modification (P00010) to a previously awarded cost-plus-fixed-fee, cost reimbursable order (N68936-19-F-0379) against a General Services Administration One Acquisition Solution for Integrated Services Multiple Award Contract (GS00Q14OADU336). Work will be performed in Point Mugu, California (90%); Whidbey Island, Washington (1.67%); Patuxent River, Maryland (1.67%); China Lake, California (1.67%); Baltimore, Maryland (1.67%); St. Louis, Missouri (1.67%); and El Segundo, California (1.65%). This modification exercises an option for engineering, technical and programmatic support services for the development of electronic attack and electronic warfare products within the Airborne Electronic Attack Integrated Program. Work is expected to be complete by June 2021. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $829,056 will be obligated at the time of award, none of which will expire at the end of the fiscal year. The Naval Air Warfare Center Weapons Division, Point Mugu, California, is the contracting activity. Johnson Controls Government Systems LLC, Rockville, Maryland, is awarded a $7,836,200 firm-fixed-price modification to increase the dollar of a contract task order for the upgrade of a cogeneration power plant, government-maintained buildings and the Metasys building automation software under the Energy Savings Performance Contract within the Naval Facilities Engineering Command (NAVFAC) Southwest area of operations. Work will be performed in Twentynine Palms, California, and provides for contractors to complete the upgrade of the cogeneration plant, government-maintained buildings and the Metasys building automation software. Work is expected to be complete by November 2026. After the award of this modification, the total cumulative task order value will be $194,104,318. For this project, Marine Corps Air Ground Combat Center Twentynine Palms has agreed to pay for the costs of services and construction from project financing, which will be obtained by Johnson Controls Government Systems LLC. The NAVFAC Engineering and Expeditionary Warfare Center, Port Hueneme, California, is the contracting activity (DACA87-97-D-0069-EJP3). ARMY Versar Inc., Springfield, Virginia (W912PL-20-D-0028); E3 Federal Solutions LLC, McLean, Virginia (W912PL-20-D-0029); Accura Engineering,* Atlanta, Georgia (W912PL-20-D-0030); and Stanley Consultants, Austin, Texas (W912PL-20-D-0031), will compete for each order of the $300,000,000 firm-fixed-price contract to support various construction activities along the southern border of the U.S. Bids were solicited via the internet with eight received. Work locations and funding will be determined with each order, with an estimated completion date of June 11, 2025. U.S. Army Corps of Engineers, Los Angeles, California, is the contracting activity. Advanced Technology International, Summerville, South Carolina, was awarded an Other Transaction Authority agreement with a ceiling of $180,752,982 for enhanced technology maturation and risk reduction for Precision Strike Missile. Work will be performed in Grand Prairie, Texas; and Summerville, South Carolina, with an estimated completion date of Nov. 20, 2021. Fiscal 2020 research, development, test and evaluation, Army funds in the amount of $180,752,982 were obligated at the time of the award. U.S. Army Contracting Command, Newark, New Jersey, is the contracting activity (W15QKN-18-9-1008). Valiant Integrated Services, San Diego, California, was awarded a $68,045,249 hybrid (cost-no fee, firm-fixed-price) contract to provide an immersive training environment. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of July 31, 2025. U.S. Army Contracting Command, Orlando, Florida, is the contracting activity (W900KK-20-D-0013). L3 Combat Propulsion Systems, Muskegon, Michigan, was awarded a $44,529,726 firm-fixed-price contract to procure hydro-mechanically propelled transmission, operational reliability, 800 series transmissions in two configurations. Bids were solicited via the internet with one received. Work will be performed in Muskegon, Michigan, with an estimated completion date of Dec. 30, 2022. Fiscal 2018 and 2019 weapons and tracked combat vehicle procurement, Army funds; 2019 overseas contingency operations funds; and 2020 Army working capital funds in the amount of $44,529,726 were obligated at the time of the award. U.S. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity (W56HZV-20-C-0124). Kiewit Infrastructure West Co., Vancouver, Washington, was awarded a $38,875,500 firm-fixed-price contract to replace a full-depth concrete ramp, taxiways and shoulders. Bids were solicited via the internet with two received. Work will be performed in Klamath Falls, Oregon, with an estimated completion date of June 27, 2022. Fiscal 2019 operations and maintenance, Army National Guard funds in the amount of $38,875,500 were obligated at the time of the award. U.S. Property and Fiscal Office, Oregon, is the contracting activity (W50S8Z-20-C-0002). Walsh Federal LLC, Chicago, Illinois, was awarded a $22,955,000 firm-fixed-price contract to provide labor, materials, equipment and supervision necessary for upgrading the main gate access control point at Defense Depot San Joaquin. Bids were solicited via the internet with three received. Work will be performed in Tracy, California, with an estimated completion date of Nov. 23, 2021. Fiscal 2020 military construction, Army funds in the amount of $22,955,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity (W91238-20-C-0011). Avion Solutions Inc.,* Huntsville, Alabama, was awarded a $19,825,503 modification (0002 33) to time-and-materials Foreign Military Sales (Bahrain, Egypt, Latvia, Saudi Arabia, Slovakia, Sweden, Taiwan, and United Arab Emirates) contract for utility helicopter logistics support services. Bids were solicited via the internet with four received. Work will be performed in Huntsville, Alabama, with an estimated completion date of June 11, 2021. Fiscal 2020 other procurement, Army; and Foreign Military Sales funds in the amount of $19,825,503 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-15-A-0029). ICF Inc. LLC, Fairfax, Virginia, was awarded a $13,444,607 modification (P00036) to contract W911QX-17-C-0018 to extend mission critical defense cyber operation services provided by ICF. Work will be performed in Adelphi, Columbia, Fort Meade, and Aberdeen Proving Ground, Maryland; Fort Belvoir, Virginia; San Antonio, Texas; and Colorado Springs, Colorado, with an estimated completion date of Dec. 15, 2020. Fiscal 2020 research, development, test and evaluation, Army funds in the amount of $13,444,607 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. Orion Marine Construction Inc., Tampa, Florida, was awarded a $10,499,080 firm-fixed-price contract for maintenance dredging. Bids were solicited via the internet with one received. Work will be performed in Corpus Christi, Texas, with an estimated completion date of March 30, 2021. Fiscal 2017, 2018, 2019, and 2020 civil construction funds; and 2017, 2018 and 2020 non-federal funds in the amount of $10,499,080 were obligated at the time of the award. The U.S. Army Corps of Engineers, Galveston, Texas, is the contracting activity (W912HY-20-C-0015). Torch Technologies Inc., Huntsville, Alabama, was awarded a $7,484,308 modification (P00049) to contract W31P4Q-19-F-C003 for technical and engineering support for research and development. Work will be performed in Huntsville, Alabama, with an estimated completion date of July 10, 2020. Fiscal 2020 research, development, test and evaluation, Army funds in the amount of $7,484,308 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. (Awarded June 10, 2020) AIR FORCE Raytheon Co., El Segundo, California, has been awarded a $202,600,272 definitive contract for F-15 sustainment. The estimated value of the options is $112,670,298. This contract provides support for the APG 82(V)1 radar modernization program depot activation in support of the Air Force. These services will include the engineering services required to support depot activation. Work will be performed in El Segundo, California; Forest, Mississippi; and McKinney, Texas. Work is expected to complete Dec. 11, 2024. This award is a result of a sole-source acquisition. Fiscal 2018 aircraft procurement funds in the amount of $89,929,974 are being obligated at the time of award. Air Force Life Cycle Management Center, Robins Air Force Base, Georgia, is the contracting activity (FA8505-20-C-0001). The Boeing Co., St. Louis, Missouri, has been awarded a $24,570,275 definitized, fixed-price-incentive-fee, cost-plus-fixed-fee modification (PZ0011) to contract FA2103-18-C-0061 for the B61-12 Life Extension Program. The contract modification is to definitize contract action for Lot One and Lot Two. Work will be performed in Saint Charles, Missouri, and is expected to be completed Dec. 31, 2022. Fiscal 2019 ammunition procurement funds in the amount of $72,091,114; and 2020 ammunition procurement funds in the amount of $19,545,218 are being obligated at the time of award. Total cumulative face value of the contract is $148,572,879. Air Force Nuclear Weapons Center, Eglin Air Force Base, Florida, is the contracting activity. IBM Corp., Reston, Virginia, has been awarded an $8,964,932 firm-fixed-price modification (P00010) to contract FA7014-19-F-A152 for advisory and assistance support. This modification exercises Option Year One that continues support for the development, implementations, analysis and provision of policies, guidance, oversight, career field management and human capital management programs across the civil engineer enterprise. Work will be performed in Washington, D.C., and if all options are exercised, work is expected to be completed Aug. 2, 2024. This award is the result of a competitive acquisition with three offers received. Fiscal 2020 operations and maintenance funds in the amount of $4,340,387 are being obligated at the time of award. The Air Force District of Washington Contracting Directorate, Joint Base Andrews, Maryland, is the contracting activity. DEFENSE ADVANCED RESEARCH PROJECTS AGENCY Raytheon Co., El Segundo, California, has been awarded a $37,442,009 cost-plus-fixed-fee contract for the Blackjack program, Phase 2. This contract provides for the research, development, and demonstration of an Overhead Persistent Infrared (OPIR) payload for Blackjack. Raytheon will complete design, fabricate, test, and deliver in quantity space-flight ready OPIR payloads capable of integrating with multiple Blackjack buses and Pit Boss subsystem supporting an on-orbit constellation level demonstration. Work will be performed in El Segundo, California, with an estimated completion date of April 2023. Fiscal 2019 research and development funds in the amount of $24,934,144; and fiscal 2020 research and development funds in the amount of $8,000,000 are being obligated at the time of award. This contract is a competitive acquisition in accordance with the original broad agency announcement, HR001118S0032. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity (HR001120C0096). *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2218996/source/GovDelivery/

Toutes les nouvelles