7 août 2019 | International, Naval

A hazy future: Amid a competition to build British frigates, a UK shipyard hits hard times

By: Andrew Chuter

LONDON — The Northern Irish shipyard that built the Titanic ceased business Aug. 5, and its part in a bid to build a new class of the general-purpose frigate for the British Royal Navy appears to have sunk with it.

Harland and Wolff was the lead U.K. yard in a proposal by German-based warship company Atlas Elektronik to build five Type 31e frigates for the Royal Navy.

But the Belfast shipyard of Harland and Wolff went into administration after a 158-year history, which included production of the Titanic and ended with its parent company insolvent and running out of offshore renewable-energy work that had become the mainstay of its business.

Industry executives, who spoke on condition of anonymity, said that unless Atlas has a plan B, the bid has likely been scuttled by the Belfast yard slipping into administration and thus putting the jobs of 125 on-site workers at risk.

Atlas Elektronik UK did not return calls regarding its bid.

British warships must be locally built, but designs can be foreign. Atlas Elektronik UK is offering parent company ThyssenKrupp Marine Systems' Meko A200 frigate to Britain. Currently, Atlas Elektronik and its U.K. partners Harland and Wolff and Ferguson Marine Engineering of Scotland are vying for the deal against rival proposals led by BAE Systemsand Babcock International.

An announcement by the Ministry of Defence on a winning bidder for the program worth more than £1.25 billion (U.S. $1.52 billion) could come next month. The procurement competition was aimed at breaking the local maritime monopoly of BAE Systems.

Sharing work across the shipbuilding sector via the Type 31e was part of a national shipbuilding strategy published by the British government in 2017. A strategy review was completed this year by its author, John Parker, but the findings have not been published by the MoD.

New Defence Procurement Minister Anne-Marie Trevelyn, the fourth such minister in three years, will likely give Parker's findings a close review. Trevelyn has no previous ministerial experience, but she is known in maritime circles for her membership of Parliament's all-party group on shipbuilding and ship repair, which recently published a report advocating for the domestic production of a new fleet of logistics support ships.

However, it's unclear how long the government, and hence the new ministerial team at the MoD, will survive given the political uncertainty here around Britain's exit from the European Union and murmurings of a general election.

Buy British?

The logistic vessels, known here as fleet solid support ships, are not considered military vessels by the British government; this is so the government can procure them more cheaply overseas. A competition is underway with a U.K. team led by BAE Systems bidding against overseas rivals.

But the tide may be turning, as there's parliamentary pressure that two or three large supply ships be built locally.

The industry executives who spoke to Defense News said that although the upcoming DSEI defense show had been touted as a possible venue for some kind of an announcement, the timing was — like most other defense issues — clouded by political uncertainties, including the appointment of a new defense secretary and defense procurement minister as part of the government reshuffle by the new prime minister, Boris Johnson.

An MoD spokesman said the department wouldn't provide a running commentary on the Type 31e competition or Harland and Wolff's part in it. However, the spokesman did suggest an announcement could take place after DSEI.

“It would be inappropriate to comment on Harland and Wolff's involvement in the Type 31e program, whilst this is subject to an ongoing competition," the spokesman said. “The competitive design phase is proceeding to schedule. The outcome of the competition for the design and build of the ships will be announced by December 2019.”

All three bidders have been in a competitive design phase ahead of submitting their proposals in late June.

The MoD previously ran a competition for the Type 31e (the "e" stands for export), but it halted the procurement effort when all of the bidders failed to submit fully compliant bids.

The Royal Navy wants the first of the five Type 31e frigates handed over during 2023 to start replace aging Type 23 frigates in its fleet.

Some analysts and industry executives think that's a tall order.

The government originally demanded a price tag of no more than £250 million per frigate, although earlier this year, industry executives said the budget restriction had been abandoned, as the MoD agreed to supply more equipment and systems at its own expense.

Atlas Elektronik isn't the only company with Harland and Wolff on its team. Babcock International also listed the Northern Irish yard in its proposal. But Babcock has various options, including using its site at Rosyth in Scotland, where the second of two aircraft carriers being assembled for the Royal Navy is now virtually complete.

“Our solution for the T31(e) requirement includes a flexible U.K. build approach that can accommodate the use of a range of delivery sites,” a Babcock spokesman said.

BAE's plan is to build it's Leander-class warships at the Cammell Laird yard near Liverpool while its own yards on the River Clyde in Scotland focus on completing the design and build of eight Type 26 anti-submarine warfare frigates destined for the Royal Navy. Three have been ordered so far.

Steve Turner, the assistant general secretary for manufacturing at the Unite union, said there are strategic defense interests why the Belfast yard should be saved.

“The shipyard works with BAE on the Dreadnought [nuclear] submarine program, has an important part to play in the building of the Royal Navy's new Type 31e and is central to the U.K. consortium's bid to build the Navy's fleet solid support ships,” Turner noted. “All this proud workforce needs is a temporary boost from government and a commitment from U.K. ministers that they will back U.K. shipbuilding by block building the new fleet solid support ships in yards across the UK."

Harland and Wolff is not the only potential Type 31e supplier in a tough spot. Ferguson Marine, which has a yard on the River Clyde and has been part of the Atlas and Babcock proposals, is experiencing significant cost and time overruns building two ferries. Nationalization by the Scottish government is one option under consideration for the financially fragile company.

https://www.defensenews.com/naval/2019/08/06/a-hazy-future-amid-a-competition-to-build-british-frigates-a-uk-shipyard-hits-hard-times/

Sur le même sujet

  • America’s bomber force is facing a crisis

    24 avril 2020 | International, Aérospatial

    America’s bomber force is facing a crisis

    By: Maj. Gen. Larry Stutzriem (ret.) and Douglas Birkey The nation faces a bomber crisis, and it is time to openly acknowledge the scale and scope of the problem. Tasked with deterrence and, if necessary, striking targets around the globe, Air Force crews operating these aircraft afford the nation's security leaders unique options best embodied in the phrase: anytime, anyplace. Despite the criticality of this mission, the Air Force currently operates the smallest, oldest fleet of bombers since its 1947 founding. No other service or ally has this capability, which places an imperative on this finite force. The service's recent announcement that it will be ending its continuous bomber presence in Guam further amplifies the precarious state of bombers. It is a stark warning to senior leaders in the Pentagon, in the executive branch and on Capitol Hill that the Air Force is “out of Schlitz” when it comes to the critical missions they perform. Bombers are unique instruments of power. They can strike targets with large volumes of kinetic firepower without requiring access to foreign bases and without projecting the vulnerability associated with regionally based land or sea forces. The striking power of a single bomber is immense. In fact, B-1Bs flying missions against ISIS in the opening days of Operation Inherent Resolve were able to carry more munitions than that delivered by an entire carrier air wing. Stealth bombers can penetrate enemy air defenses, depriving mobile targets of sanctuary. They can also carry large bunker-buster munitions required to eliminate deeply buried and hardened facilities. Bomber aircraft are also cheaper to operate on a per-mission basis when compared to alternate options, like ships, large packages of smaller strike aircraft or standoff missiles. The erosion of the bomber force is no secret. At the end of the Cold War, the U.S. Air Force possessed 400 bombers arrayed to fight the Soviet Union. Today, it has just 157, with a plan to cut a further 17 in the fiscal 2021 budget submission. Air Force efforts to modernize the bomber force a decade ago were thwarted within the Department of Defense by an excessive near-term focus on counterinsurgency operations. Bombers are requested by combatant commands on a continual basis given the concurrent threats posed by peer adversaries, mid-tier nations like Iran and North Korea, and hostile nonstate actors. The Air Force knows this mission area is stretched too thin, and that is precisely why in 2018 leaders called for an additional five bomber squadrons in “The Air Force We Need” force structure assessment. Well-understood risk exists with operating a high-demand, low-density inventory for too long. The B-1B force, which makes up over one-third of America's bomber capacity, offers a highly cautionary tale in this regard. In the immediate aftermath of 9/11, the service retired 26 of these aircraft to free up modernization funds, which subsequently were snatched away from the bomber mission area for other uses. For the next two decades, the Air Force flew the B-1B in a nearly continuous string of intense combat deployments. Sustainment funding was under-resourced, which further wore down the B-1B force. Last summer, B-1B readiness rates plummeted below 10 percent — effectively putting them out of commission. As Air Force Global Strike Command Commander Gen. Tim Ray explained: “We overextended the B-1Bs.” It was a toxic formula of too much mission demand and too few airplanes. Air Force leaders continually signaled concern, but their calls for help went unanswered. The normal solution to this sort of a challenge would be straight-forward: Go buy more airplanes. However, operational B-21s will not be in production until the latter 2020s. The Air Force is asking to retire 17 B-1s to free up resources to nurse the remaining aircraft along as a stopgap measure. COVID-19 emergency spending and corresponding downward pressure on future defense spending are only going to aggravate the complexity of this juggling act with mission demand, available force structure and readiness. Whether world events will align with these circumstances is yet to be seen. It was in this context that the Air Force decided to end its continuous bomber presence on Guam. Launched in 2004 to deter adversaries like China and North Korea and to reassure regional allies, the mission has been a tremendous success. It clearly communicated U.S. readiness to act decisively when U.S. and allied interests were challenged. Ending continuous bomber presence in the Pacific now sends the opposite message, just as the region grows more dangerous. This is a decision with significant risk, yet it is an outcome compelled by past choices resulting in a bomber force on the edge. The path forward begins with admitting the nation has a bomber shortfall. Retiring more aircraft exacerbates the problem. Nor is this just an Air Force problem. Bombers are national assets essential to our security strategy and must be prioritized accordingly. If other services have excess funds to invest in ideas like a 1,000-mile-range cannon when thousands of strike aircraft, various munitions and remotely piloted aircraft can fill the exact same mission requirements, it is time for a roles and missions review to direct funding toward the most effective, efficient options. Bombers would compete well in such an assessment. Ultimately, the solution demands doubling down on the B-21 program. There comes a point where you cannot do more with less. Given the importance of bombers to the nation, rebuilding the bomber force is not an option — it is an imperative. Retired U.S. Air Force Maj. Gen. Larry Stutzriem served as a fighter pilot and held various command positions. He concluded his service as the director of plans, policy and strategy at North American Aerospace Defense Command and U.S. Northern Command. He is currently the director of studies at the Mitchell Institute for Aerospace Studies, where Douglas Birkey is the executive director. Birkey researches issues relating to the future of aerospace and national security, and he previously served as the Air Force Association's director of government relations. https://www.defensenews.com/opinion/commentary/2020/04/23/americas-bomber-force-is-facing-a-crisis/

  • Marines to test out first stern landing vessel at Project Convergence

    7 septembre 2023 | International, Naval

    Marines to test out first stern landing vessel at Project Convergence

    Five companies are building competitive prototypes, and the Marines will select one to fulfill the Landing Ship Medium program within the next two years.

  • Rolls-Royce receives U.S military contracts valued at $1.8 billion

    7 septembre 2022 | International, Aérospatial

    Rolls-Royce receives U.S military contracts valued at $1.8 billion

    The contract is valued at up to $1.013 billion, spanning five years

Toutes les nouvelles