Filter Results:

All sectors

All categories

    3363 news articles

    You can refine the results using the filters above.

  • Inside Project Convergence: How the US Army is preparing for war in the next decade

    September 14, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Inside Project Convergence: How the US Army is preparing for war in the next decade

    By: Jen Judson WASHINGTON — The U.S. Army is in the midst of conducting what Army Futures Command Commander Gen. Mike Murray is calling “this generation's digital Louisiana Maneuvers” in the Arizona desert, as the service aims to bring key technologies together designed to fight across air, land, sea, space and cyber. The famed Louisiana Maneuvers, a series of mock battles during World War II, were designed to figure out how the United States could use its existing technology to fight in a fundamentally different way against the German military's airplanes, radios and tanks. “It was a combination of those three technologies and how the Germans put it together to execute what we call Blitzkrieg" that was “fundamentally different” than any of the capabilities the Allied forces, to include the U.S., brought to the battlefield, Murray told Defense News in an exclusive interview. In 2020, there are three key technologies that when paired together in novel ways can provide a strong advantage against possible conflict with near-peer adversaries, according to Murray: artificial intelligence, autonomy and robotics in the air and on the ground. “To make those three work in a digital environment, you have to have an underlying robust and resilient network,” Murray said, “and you have to have a data architecture and the data and the talent to put all that together.” Enter Project Convergence, the Army's weekslong “campaign of learning” to bring together the weapons and capabilities it envisions fighting with in the 2030s and beyond in a seamlessly networked environment. The capstone event began in the middle of August and will wrap up September 18 amid the global coronavirus pandemic. Murray reported there has been only one isolated case of COVID-19 at Yuma and that person was quickly isolated without the disease spreading. The effort aims to bring in as many capabilities across the Army's six modernization priorities as possible and put them through maneuvers that service's new Multidomain Operations (MDO) warfighting concept lays out. The service is particularly focused on three key phases of MDO at Project Convergence: Penetrating and neutralizing enemy long-range systems, contesting enemy maneuver forces from operational and strategic distances Disintegrating the enemy's anti-access and area denial (A2AD) systems taking out enemy long- and short-range systems while conducting independent maneuver and deception operations Exploiting freedom to maneuver to defeat enemy objectives and forces. “Convergence is one of the tenets,” Murray said. “The ability to converge effects across all five warfighting domains (air, land, sea, cyber and space) and we're really taking that tenant and putting it together in the dirt live and bringing multiple things together... and the key thing is here is being able to act faster than any opponent in the future.” Murray also discussed Convergence as part of the 2020 Defense News Conference. Getting the upper hand To act faster, the Army has moved a system called Firestorm out of a science and technology effort from Picatinny Arsenal's armaments center and into the exercise. Firestorm is being developed as the brain that connects the sensors on the battlefield to the right shooter through the appropriate command and control node, Murray explained. “I firmly believe on a future battlefield, the commander that can see first, understand first, decide first and the act first will have a distinct advantage and will ultimately win any future battle,” Murray said, “so that's this learning experience year to year.” While Project Convergence will have surrogate capability this year representing its Future Attack Reconnaissance Aircraft, the Future Long-Range Assault Aircraft, as well as the Extended Range Cannon Artillery system, more and more technologies across the Army's modernization priorities will be brought in in subsequent years. The Army, this year, is also using available Air-Launched Effects (ALE) as well as a surrogate system called Titan — at Joint Base Lewis McChord in Washington State — that will process targeting information from ground and air autonomous vehicles using artificial intelligence. Titan is managed by the Army's Multidomain Task Force's Intelligence, Information, Cyber, Electronic Warfare and Space (I2CEWS) battalion. The system will pass targeting information to a fire control element sitting at Yuma. The service is also experimenting with space sensing capabilities this year and bringing it all together using new network architecture. “The network is a huge piece of this and so we are building out mesh networks, communications between the air in terms of Gray Eagle [unmanned aircraft system] and ALE and [Future Vertical Lift] surrogates to the ground.” The hope from the first year is to walk away with conclusions about whether technology currently being developed works, Murray said. “Can we actually link multiple sensors and shooters right? In this case, it's not a huge number. It's less than a handful,” he said, “but the ability for Firestorm to figure out the right shooter against the right target is one of the key things we're driving and then can we do this in near-real time.” During National Training Center rotations, “it takes a while to clear fires,” Murray said. “So what is that order of magnitude we can do this faster, to see faster and really put rounds on target faster.” Early intel out of Project Convergence is that Firestorm has already shown “great success” and “the ability to put lethal effects on a target much, much, much faster than we do right now in an order of magnitude that is at least 10 times faster,” Murray said, “but we still have a ways to go.” Spiraling in capability Project Convergence this year came together quickly, Murray said. The inspiration came from an AI-focused effort through the Army's Next-Generation Combat Vehicle (NGCV) modernization outfit dubbed Project Quarterback, which paired automated target recognition with future combat vehicles. Brig. Gen. Ross Coffman, who is in charge of the NGCV cross-functional team, discussed what he was doing with Murray over the winter, with the latter saying “It just occurred to me, it should have occurred to me a long time ago. It is so much bigger than that.” The Army is already wrapping up its plans for Project Convergence in 2021 and setting its sites on what is possible in 2022, according to Murray. While the Integrated Battle Command System (IBCS), the command and control system for the Army's future air-and-missile defense system, was tied up in Limited User Test this year, the service is looking for a way to integrate that into the effort next year. IBCS will be going through its Initial Operational Test and Evaluation at that time, but Murray said he is hopeful there is a way to bring the integral capability of the system to the event. Another test of the Precision Strike Munition (PrSM) will also be executed during the event next year. The missile had three successful test shots this calendar year. And while the exercise this year had roughly 500 people at Yuma this year, most of those are data collectors, Murray said. The exercise represents a platoon-sized operation, but in 2021, Murray said he intends to bring in an operational headquarters element to drive the learning in terms of how “we organize and how we fight the capability in the future.” Ideally, the Army would involve one of the MDTF units, but due to conflicts in schedule this year it wasn't possible to bring them into the event, so the service is working with U.S. Army Forces Command to incorporate MDTF participation. Next year will also bring in joint participation. While the Air Force will be present at Project Convergence this year, the Army plans to use the F-35 fighter into the architecture. Joint participation is critical to developing Joint All-Domain Command and Control (JADC2), which is the joint warfighting doctrine now in development of which MDO as a concept is a part. “Convergence is our contribution to an all-domain command-and-control,” Murray emphasized, “and it is not in conflict with what the Air Force is doing with JADC2 and the [Air-Battle Management System].” In 2022, Murray said the plan is to bring coalition partners and so far the United Kingdom has committed to participation and Australia will also likely sign on to attend. “We've been very open-kimono in terms of the technology that we're bringing and there's been a lot of crosstalk between the three nations,” he added. https://www.defensenews.com/smr/defense-news-conference/2020/09/10/army-conducting-digital-louisiana-maneuvers-in-arizona-desert/

  • Industry could wait months for COVID reimbursements from Pentagon

    September 10, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Industry could wait months for COVID reimbursements from Pentagon

    By: Aaron Mehta WASHINGTON — As the defense department seeks billions in emergency funding to reimburse industry for costs incurred during the COVID-19 pandemic, the Pentagon's top acquisition official pledged not to rush that money out the door. Speaking at the annual Defense News Conference, Ellen Lord, undersecretary of defense for acquisition and sustainment, said it will likely take five to six months before any reimbursements to industry under the Coronavirus Aid, Relief, and Economic Security (CARES) act will take place as the department seeks a “very data driven approach” to that money. Section 3610 of the CARES act allows firms serving the federal government to seek reimbursement for pandemic-related expenses, but Congress hasn't passed corresponding appropriations. Defense officials have said they need roughly $10 billion, and that without added funding from Congress, the Pentagon would have to dip into modernization and readiness funds. “We believe we need that appropriation to maintain readiness because if we do not get that what we are going to find is we are not going to get the number of units delivered, we are not going to maintain warfighter readiness, we're not going to move forward in modernization,” Lord said. “We would like to take the one-time hit and then see where we go from there.” Should Congress appropriate the requested funds, the Pentagon would issue a request for proposal, with the large primes gathering data from up and down their supply chains before returning with their requests to the Pentagon. That process will likely take two to three months, Lord said. “Then we want to look at all of the proposals at once. It isn't going to be a first-in-first-out and we have to rationalize using the rules we've put in place, what would be reimbursable, and what's not,” she added. “So overall, we think five to six months, in terms of a process.” When the COVID pandemic struck in March, hundreds of defense subcontractors had to close up shop. As of now, only 30 remain shuttered, Lord said, although she acknowledged that the department is keeping a wary eye on the situation. “What we are looking for is whether or not we're maintaining warfighter readiness for our production programs, and then relative to modernization, whether we are hitting key milestones relative to development programs,” she said. “We have seen some slowdowns. We are carefully monitoring, using monthly metrics, where we are.” While the most recent round of quarterly earnings reports from public defense companies did not show a major slowdown from COVID, Lord warned that those reports “in large part don't reflect the hits that were taken by business,” warning of a “delayed response” in terms of the diseases' economic impact on the sector. “I would contend that most of the effects of COVID haven't yet been seen, because most companies gave their employees time off, they stretched out production, paid a lot of people for working 100% when perhaps they were only getting 50% of the hours in and so forth,” she said. “So I think the system has absorbed it up to this point in time. Now when we get to the point where we're having payments and incentive fees and award fees earned, and if we haven't done the deliveries, that's where you're going to see the hit.” https://www.defensenews.com/smr/defense-news-conference/2020/09/09/industry-could-wait-months-for-covid-reimbursements-from-pentagon

  • Contract Awards by US Department of Defense - September 09, 2020

    September 10, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - September 09, 2020

    NAVY Lockheed Martin Rotary and Mission Systems, Manassas, Virginia, is awarded a $126,934,433 cost-plus-incentive-fee and cost only contract modification to previously awarded contract N00024-17-C-6259 to exercise and fund options for Navy engineering services, materials and spares. Work will be performed in Manassas, Virginia (65%); Clearwater, Florida (32%); Syracuse, New York (2%); and Marion, Florida (1%), and is expected to be completed by December 2021. Fiscal 2020 operations and maintenance, Navy (63%); and fiscal 2020 research development test and engineering, Navy (37%) funding in the amount of $1,400,676 will be obligated at time of award, of which $882,426 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. Harper Construction Co., Inc., San Diego, California (N62473-16-D-1881); Hensel Phelps Construction Co., Irvine, California (N62473-16-D-1882); M. A. Mortenson Co. doing business as Mortenson Construction, Minneapolis, Minnesota (N62473-16-D-1883); R. A. Burch Construction Co., Inc.,* Ramona, California (N62473-16-D-1884); RQ Construction LLC, Carlsbad, California (N62473-16-D-1885); Solpac Construction, doing business as Soltek Pacific Construction Inc., San Diego, California (N62473-16-D-1886); and Straub Construction Inc., Fallbrook, California (N62473-16-D-1887), are awarded $92,000,000 to increase the aggregate capacity of the previously awarded suite of firm-fixed-price, indefinite-delivery/indefinite-quantity, multiple award construction contracts. The maximum dollar value including the base year and four option years for all seven contracts combined is increased from $332,000,000 to $424,000,000. The contracts are for new commercial and institutional building construction projects at various locations within the Naval Facilities Engineering Command (NAVFAC) Southwest area of responsibility, including but not limited to California (90%); Arizona (6%); Colorado (1%); Nevada (1%); New Mexico (1%); and Utah (1%). All work will be performed at various federal sites within the NAVFAC Southwest area of responsibility. No funds are being obligated on this award and no funds will expire. Future task orders will be primarily funded by military construction (Navy); operations and maintenance (O&M) (Navy); O&M (Marine Corps); and Navy working capital funds. The original contract was competitively procured via the Navy Electronic Commerce Online website, with 21 proposals received. The NAVFAC Southwest, San Diego, California, is the contracting activity. Core Services Group Inc.,* Virginia Beach, Virginia, is awarded a $29,000,000 commercial firm-fixed-price, indefinite-delivery/indefinite-quantity contract to provide test and evaluation support services for Commander, Operational Test and Evaluation Force Aviation Warfare Division. The contract will include a 60-month base ordering period with an additional six-month ordering period option pursuant of Federal Acquisition Regulation 52.217-8. The option to extend services, if exercised, will bring the total value to $32,000,000. The base ordering period is expected to be completed by November 2025; if the option is exercised, the ordering period will be completed by May 2026. All work will be performed in Norfolk, Virginia. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $2,500 will be obligated to fund the contract's minimum amount and funds will not expire at the end of the current fiscal year. Individual task orders will be subsequently funded with appropriate fiscal year appropriations at the time of their issuance. This contract was competitively procured with the solicitation posted on beta.sam.gov as a service-disabled veteran-owned small business set-aside using commercial items procedures, with four offers received. Naval Supply Systems Command Fleet Logistics Center, Norfolk, Contracting Department, Norfolk, Virginia, is the contracting activity (N00189-20-D-0020). Science Application International Corp., Reston, Virginia, is awarded a $17,816,869 single-award, firm-fixed-price, indefinite-delivery/indefinite-quantity contract to provide advanced technical training of shipboard communication and network systems in support of the Water Front Training Delivery Program for the Center for Information Warfare Training, Pensacola, Florida. The contract will include a five-year base ordering period with no options. Work will be performed in Pensacola, Florida (52%); San Diego, California (22%); Virginia Beach, Virginia (19%); and Groton, Connecticut (7%). Work is expected to be completed by September 2025. Fiscal 2021 operations and maintenance (Navy) funds in the amount of $100,000 will be obligated to fund the contract's minimum amount and funds will expire at the end of the fiscal year. Individual task orders will be subsequently funded with appropriate fiscal year appropriations at the time of their issuance. This contract resulted from a full and open competitive solicitation through the Federal Business Opportunities website, with two offers received. Naval Supply Systems Command Fleet Logistics Center, Norfolk, Contracting Department, Philadelphia Office, Philadelphia, Pennsylvania, is the contracting activity (N00189-20-D-Z032). Bell Textron Inc., Fort Worth, Texas, is awarded an $8,941,785 firm-fixed-price modification (P00018) to previously awarded fixed-price-incentive-firm-target contract N00019-17-C-0030. This modification increases the total contract value to produce, deliver, install and integrate, in country, a fully assembled AH-1Z flight training device for the government of Bahrain. Work will be performed in Broken Bow, Oklahoma (50%); Fort Worth, Texas (30%); and St. Louis, Missouri (20%), and is expected to be completed in May 2022. Foreign Military Sales funds in the amount of $8,941,785 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Life Cycle Engineering Inc., North Charleston, South Carolina, is awarded an $8,364,504 firm fixed price modification to task order N32253-19-F-3000 against previously issued SeaPort-e multiple award contract N00178-07-D-4077. This modification exercises Option Period One for the accomplishment of the technical, engineering, management, programmatic and education support services at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility. Work will be performed in Hawaii, and is expected to be completed by September 2021. Fiscal 2020 operations and maintenance (Navy) funding in the amount of $8,364,504 will be obligated at time of modification award and expire at the end of the current fiscal year. The Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility, Pearl Harbor, Hawaii, is the contracting activity. Sabre Systems, Inc.,* Warrington, Pennsylvania, is awarded an $8,174,314 cost-plus-fixed-fee order (N68335-20-F-0212) against previously issued basic ordering agreement N68335-16-G-0022. This order provides support for the rapid research, development, maturation, procurement, integration, training and sustainment of cyber resilient and full spectrum cyber warfighting capabilities for the Digital Analytics, Infrastructure and Technology Advancement Group. These solutions support various systems within the Naval Air Systems Command portfolio throughout all phases of acquisition, operational field demonstrations, prototyping, experiments, operational assessments, extended user evaluations and fleet/force deployments. Work will be performed in Patuxent River, Maryland, and is expected to be completed in September 2025. Fiscal 2020 research, development, test and evaluation (Defense wide) funds in the amount of $667,721; and fiscal 2020 operations and maintenance (Navy) funds in the amount of $52,000 will be obligated at time of award, $52,000 of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity. AIR FORCE Raytheon Missiles Systems, Tucson, Arizona, has been awarded a ceiling $125,000,000 four-year, indefinite-delivery/indefinite-quantity contract (FA8675-20-D-0002) for the Advanced Medium Range Air-to-Air Missile (AMRAAM) system improvement program. This contract provides for delivery of software updates to the AMRAAM inventory. Software development activities are expected to use a recognized agile framework consisting of government/Prime collaboration through repeatable increments of study, development, integration, test and capability demonstration. Work will be performed in Tucson, Arizona, and is expected to be completed Sept. 30, 2026. An initial task order (FA8675-20-F-1026) will be awarded concurrently with the basic contract, for a total cost-plus-fixed-fee face value of $1,192,809. This award is the result of a sole-source acquisition. Fiscal 2020 research, development, test and evaluation funds in the amount of $678,402 are being obligated at the time of award. Air Force Life Cycle Management Center, Eglin Air Force Base, Florida, is the contracting activity. FPM Remediations Inc., Oneida, New York, has been awarded a ceiling $60,000,000 indefinite-delivery/indefinite-quantity contract for base realignment and closure (BRAC) environmental construction optimization services to support the Air Force Civil Engineer Center (AFCEC) Installations Directorate (CIB). These performance-based remediation efforts support the AFCEC BRAC mission and enhance BRAC program capabilities within AFCEC/CIB. The requirements support a variety of environmental restoration services and construction necessary to maintain regulatory selected remedies, implement optimization to enhance remedial progress and advance sites to completion in a cost-effective manner. The efforts will be executed in accordance with technical and regulatory requirements to ensure protection of human health and the environment. Work will be performed at the following deactivated Air Force bases: Bergstrom Air Force Base, Texas; Brooks AFB, Texas; Carswell AFB, Texas; Eaker AFB, Arkansas; England AFB, Louisiana; Kelly AFB, Texas; Myrtle Beach AFB, South Carolina; Reese AFB, Texas; Buckley Annex, Colorado; and Lowry AFB, Colorado. Work is expected to be completed Sept. 30, 2030. This award is the result of a competitive acquisition and four offers were received. Fiscal 2020 BRAC funds in the amount of $2,466,636 are being obligated at the time of award. Air Force Installation Contracting Center, Joint Base San Antonio-Lackland, Texas, is the contracting activity (FA8903-20-D-0003). DEFENSE LOGISTICS AGENCY Valneva USA Inc.,* Gaithersburg, Maryland, has been awarded a maximum $60,601,800 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for Japanese Encephalitis vaccines. This is a one-year base contract with two one-year option periods. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. Locations of performance are Maryland and United Kingdom, with a Sept. 8, 2021, ordering period end date. Using military services are Army, Marine Corps, Navy and Air Force. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2DP-20-D-0005). Vinyl Technology, Monrovia, California, has been awarded a maximum $10,996,200 modification (P00011) exercising the first one-year option period of a one-year base contract (SPE1C1-19-D-1188) with three one-year option periods for Advanced Technology Anti-G Suits. This is a firm-fixed-price, indefinite-delivery/indefinite-quantity contract. Location of performance is California, with a Sept.16, 2021, ordering period end date. Using military service is Air Force. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. ARMY Battelle Memorial Institute, Columbus, Ohio, was awarded a $49,525,698 modification (P00006) to contract W9132V-19-F-0005 for geospatial research, development, technology and evaluation of current and emerging geospatial technologies that will help characterize and measure phenomena within the physical and social environments encountered by the Army. Work will be performed in Washington, D.C., with an estimated completion date of Sept. 28, 2023. Fiscal 2020 revolving funds in the amount of $1,038,309 were obligated at the time of the award. The U.S. Army Corps of Engineers, Engineer Research and Development Center, Vicksburg, Mississippi, is the contracting activity. Moog Inc., Elma, New York, was awarded a $46,659,837 firm-fixed-price contract to overhaul and upgrade cylinder assembly actuators for UH-60 Blackhawk helicopters. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 9, 2024. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-20-D-0032). Lockheed Martin, Orlando, Florida, was awarded a $22,335,977 modification (P00035) to contract W31P4Q-19-C-0071 for engineering services in support of the Hellfire and Joint-Air-to-Ground missiles. Work will be performed in Orlando, Florida, with an estimated completion date of Sept. 2, 2022. Fiscal 2018 and 2020 missile procurement (Air Force) funds; 2019 research, development, test and evaluation (Navy) funds; 2020 operations and maintenance (Army) funds; and 2018 and 2020 missile procurement (Army) funds in the amount of $22,335,97 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Optimal GEO Inc.,* Athens, Georgia (W912P9-20-D-0027); and Surdex Corp., Chesterfield, Missouri (W912P9-20-D-0026), will compete for each order of the $16,000,000 firm-fixed-price contract for photogrammetric and lidar surveying and mapping. Bids were solicited via the internet with 38 received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 3, 2025. U.S. Army Corps of Engineers, St. Louis, Missouri, is the contracting activity. David Boland Inc.,* Titusville, Florida, was awarded a $15,472,000 firm-fixed-price contract for renovation of Building 546 at Missile Command Headquarters. Bids were solicited via the internet with four received. Work will be performed at Minot Air Force Base, North Dakota, with an estimated completion date of Aug. 25, 2023. Fiscal 2020 operations and maintenance (Army) funds in the amount of $15,472,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Omaha, Nebraska, is the contracting activity (W9128F-20-C-0036). Speegle Construction,* Niceville, Florida, was awarded a $13,214,700 firm-fixed-price contract to construct a two-story, 39,500 square-foot facility with reinforced concrete foundation and floor slab, steel structure, masonry walls, metal roof, heating, ventilation, air conditioning, fire detection and protection and mass notification system. Bids were solicited via the internet with six received. Work will be performed at Hurlburt Field, Florida, with an estimated completion date of Sept. 16, 2022. Fiscal 2024 military construction (Defense-wide) funds in the amount of $13,214,700 were obligated at the time of the award. U.S. Army Corps of Engineers, Mobile, Alabama, is the contracting activity (W91278-20-C-0028). BAE Systems Land & Armaments L.P., San Jose, California, was awarded a $10,457,946 modification (P00143) to contract W56HZV-15-C-0099 for Bradley Fighting Vehicle current fleet sustainment logistics management. Work will be performed in San Jose, California, with an estimated completion date of Dec. 9, 2022. Fiscal 2018 procurement (Defense-wide) funds in the amount of $10,457,946 were obligated at the time of the award. U.S. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity. Limno-Tech Inc.,* Ann Arbor, Michigan, was awarded a $9,900,000 fixed-price-level-of-effort contract for research and development services for water quality and contaminant modeling. Bids were solicited via the internet with two received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 8, 2025. The U.S. Army Corps of Engineers, Engineer Research and Development Center, Vicksburg, Mississippi, is the contracting activity (W912HZ-20-D-0004). Accenture Federal Services, Arlington, Virginia, was awarded an $8,293,896 modification (P00001) to contract W52P1J-20-C-0005 for unified enterprise resource planning capability support services. Work will be performed at Aberdeen Proving Ground, Maryland, with an estimated completion date of Sept. 8, 2026. Fiscal 2020 operations and maintenance (Army) funds in the amount of $8,293,896 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. CORRECTION: The contract announced on Sept. 8, 2020, for Amentum Services Inc., Germantown, Maryland (W56HZV-20-F-0396), for $29,034,547, was announced with an incorrect award date. The correct award date is Sept. 9, 2020. *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2341844/source/GovDelivery/

  • Defense authorization bill delayed until after election

    September 10, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Defense authorization bill delayed until after election

    By: Joe Gould WASHINGTON — A bipartisan compromise and vote on the 2021 defense policy bill isn't likely before the Nov. 3 elections, but it should come “quickly” thereafter, the House Armed Services Committee's top Republican said Wednesday. The vote would delay a decision from Congress about whether the Defense Department to rename military bases honoring Confederate leaders. It's defining issue for the $740.5 billion defense authorization bill, which includes must-pass provisions like military pay hikes, defense equipment purchase plans and strategic posturing of forces in coming years. “There are more negotiations that have to occur, and part of that negotiation is talking with the White House about the shape of that provision,” Rep. Mac Thornberry, of Texas, said at the Defense News Conference. “Is there a way to get everybody to ‘good?' Of course there is. Is it likely to happen before the election? No, it's not.” Republicans and Democrats in the House and Senate voted overwhelmingly to back language requiring the changes, though the House requires the names changed within one year and the Senate bill requires them within three years. President Donald Trump has threatened to veto the 2021 National Defense Authorization Act over the Confederate name changes among other issues. Trump has said Senate Armed Services Chairman Jim Inhofe, R-Okla., personally assured him that Congress will not force the Pentagon to change the names. That's fueled speculation that bipartisan negotiations to reconcile the bills could drag on. The summer's sustained protests over racial injustice have buoyed the provision, while Trump has argued that changing the names would dishonor troops who have served at the sites and that Confederate symbols aren't racist. “We can't cancel our whole history,” he told Fox News last month. Thornberry, who had offered a softer alternative as a House amendment, said Wednesday that both sides have political incentives not to compromise on the base renaming provision, among other issues. “I don't know how that will come out in conference, but I do think we are in a time when neither party is rewarded for compromise, and coming together and getting things done,” he said. “On the other hand, I think we should be able to get a conference report pretty quickly after the election.” https://www.defensenews.com/congress/2020/09/09/no-defense-authorization-bill-before-election-says-thornberry/

  • GOP’s ‘targeted’ stimulus doesn’t include defense dollars

    September 9, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    GOP’s ‘targeted’ stimulus doesn’t include defense dollars

    By: Joe Gould WASHINGTON ― Senate Majority Leader Mitch McConnell on Tuesday introduced and set up a floor vote for a leaner Republican coronavirus relief bill, but it does not contain the billions of dollars the defense industry has sought to diffuse the economic impact of the pandemic. The bill, which includes some of the elements of the $1 trillion package the GOP proposed in July, is intended to break a weekslong partisan stalemate. However, it has a slim chance of passage in the face of Democrats' insistence for more sweeping aid. “The Senate Republican majority is introducing a new targeted proposal, focused on some of the very most urgent health-care, education and economic issues. It does not contain every idea our party likes,” McConnell said in a statement. “I will be moving immediately today to set up a floor vote as soon as this week.” It wasn't immediately clear what the differences, if any, were to an earlier version that Senate Republicans floated last month. Both draft bills excluded the $29 billion for defense that the GOP included in its previous $1 trillion package. The $1 trillion proposal from July contained $11 billion to reimburse defense contractors for coronavirus-related expenses, as authorized by Section 3610 of the Coronavirus Aid, Relief and Economic Security Act. which expires Sept. 30. Defense firms and trade associations have lobbied for an extension of Section 3610 as well as the funding, fearing the Pentagon would otherwise have to tap modernization and readiness accounts. The move comes as lawmakers straggle back to Washington for an abbreviated preelection session, as hopes are dimming for another coronavirus relief bill — or much else. Passage of an extension for Section 3610 and any funding may have a better chance if lawmakers can attach it to and pass a stopgap continuing resolution before Sept. 30, when the fiscal year ends and 2020 appropriations run out. However, defense industry observers were pessimistic on Tuesday. “I don't see any of the COVID package procurement money making it into the CR, and the CR is a high hurdle in any event,” a defense industry source told Defense News. “This Senate bill is a ‘press release' bill and not a piece of legislation that has a chance of passing into law.” Several Republican senators in tough reelection bids are eager to show constituents they are working to ease the pandemic's strain on jobs, businesses and health care. But many Senate Republicans are resisting more spending. Senate Finance Committee Chairman Chuck Grassley, R-Iowa, told reporters Tuesday that the GOP conference would discuss the legislation during a meeting on Wednesday. McConnell's move Tuesday would clear the way for a Thursday test vote in which the $500 billion, scaled-back bill — roughly half the size of a measure McConnell unveiled earlier this summer — is sure to be blocked by Democrats. McConnell's bill would provide more than $100 billion to help schools reopen, enact a shield against lawsuits for businesses and others that are powering ahead to reopen, create a scaled-back supplemental jobless benefit of $300-per-week, and write off $10 billion in earlier post office debt. (The National Defense Industrial Association is among groups that have called for a liability shield.) But the bill won't contain another round of $1,200 direct payments going out under President Donald Trump's name. House Speaker Nancy Pelosi, D-Calif., continues to demand $2.2 trillion, and while Trump's negotiators have signaled a willingness to inch further in her direction, a significant gap remains. Pelosi and Senate Minority Leader Chuck Schumer, D-N.Y., rapped McConnell in a statement Tuesday for resisting earlier calls to work on an economic stimulus bill. They called the most recent bill “political” and a nonstarter with Democrats. “As they scramble to make up for this historic mistake, Senate Republicans appear dead-set on another bill which doesn't come close to addressing the problems and is headed nowhere,” Pelosi and Schumer said. The Associated Press contributed to this report. https://www.defensenews.com/congress/2020/09/08/will-gops-targeted-stimulus-include-defense-dollars/

  • Contract Awards by US Department of Defense - September 08, 2020

    September 9, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - September 08, 2020

    AIR FORCE Northrop Grumman Systems Corp., Roy, Utah, has been awarded a $13,293,562,839 cost-plus-incentive-fee contract for a tested and fully qualified design of the Ground Based Strategic Deterrent (GBSD). The GBSD will replace the Minuteman III Intercontinental Ballistic Missile Weapon system. This contract will provide for the engineering and manufacturing of the GBSD. Work will be performed in Roy, Utah, and multiple other locations nationwide, and is expected to be completed February 2029. This award is the result of a competitive acquisition and one offer was received. Fiscal Year 2020 research, development, test and evaluation funds in the amount of $85,000,000 are being obligated at the time of award. Air Force Nuclear Weapons Center, Hill Air Force Base, Utah, is the contracting activity (FA8219-20-C-0006). NAVY Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $174,221,174 modification (P00022) to previously awarded fixed-price-incentive-firm, cost-plus-fixed-fee, cost contract N00019-18-C-1021. This modification exercises an option for the production and delivery of 14 F135-PW-100 low rate initial production Lot 14 propulsion systems for the Air Force in support of the F-35A conventional take-off and landing aircraft. Work will be performed in Middletown, Connecticut (46%); East Hartford, Connecticut (22%); Windsor Locks, Connecticut (16%); North Berwick, Maine (11%); Phoenix, Arizona (3%); and Santa Isabel, Puerto Rico (2%), and is expected to be completed in June 2022. Fiscal 2020 aircraft procurement (Air Force) funds in the amount of $174,221,174 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. RDA Inc.,* Doylestown, Pennsylvania, is awarded a $19,983,378 cost-plus-fixed-fee order (N68335-20-F-0360) against previously issued basic ordering agreement N68335-20-G-3039. This order provides for continued advanced technology research and development efforts for Small Business Innovation Research (SBIR) products for anti-submarine warfare (ASW) and under-sea warfare (USW) systems under SBIR topic N98-035 titled “Signal Processing and System Concepts to Exploit Passive Signals in Airborne Active ASW Missions; topic N04-247 titled “Littoral Environment Parameter Estimation from Bistatic and Multistatic Fleet Air ASW Acoustic Reverberation Data;” and topic N06-011 titled “Multi-Sensor Data Fusion for Littoral Undersea Warfare.” Further development and research efforts will include engineering, technical, managerial, analysis, prototyping, maintenance, quality control, training and test participation. Additionally, this order provides operational software development, acoustic capability enhancements and technical engineering for further development and transition of technologies and system performance improvements, providing on-going fleet training and maintenance products for deployed systems. Work will be performed in Warrenton, Virginia (45%); Patuxent River, Maryland (35%); and Doylestown, Pennsylvania (20%), and is expected to be completed in September 2025. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $852,759 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity. Northrop Grumman Systems Corp. Aeronautics Systems, San Diego, California, is awarded an $11,635,599 cost-plus-fixed-fee order (N00019-20-F-0103) against previously issued basic ordering agreement N00019-20-G-0005. This order provides non-recurring engineering for qualification testing and integration of the Redundancy unmanned air vehicle common automatic recovery systems and multi-platform anti-jam Global Positioning System navigation antenna integrated upgrades into the MQ-8C Fire Scout aircraft. Work will be performed in San Diego, California (90%); and Moss Point, Mississippi (10%), and is expected to be completed in January 2023. Fiscal 2019 aircraft procurement (Navy) funds in the amount of $11,635,599 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. DEFENSE INFORMATION SYSTEMS AGENCY Qwest Government Solutions Inc., doing business as CenturyLink QGS, Herndon, Virginia, was awarded a $70,250,013 modification (P00004) against non-competitive firm-fixed-price, indefinite-delivery/indefinite-quantity contract HC1013-19-D-0002 to increase the current contract ceiling. This modification allows for the continued operations and maintenance support for dark fiber and commercial facilities in the continental U.S. to support the Department of Defense. Funding will be obligated at the individual task orders. The total contract ceiling value has increased from $126,895,698 to $197,145,711. The period of performance is Nov. 30, 2018, through Nov. 29, 2023. The Defense Information Technology Contracting Organization, Scott Air Force Base, Illinois, is the contracting activity. ARMY Amentum Services Inc., Germantown, Maryland, was awarded a $29,034,547 hybrid (cost-no-fee, labor-hours) contract for contractor labor support services at Anniston Army Depot and Watervliet Arsenal. Bids were solicited via the internet with three received. Work will be performed at Anniston Army Depot, Alabama; and Watervliet Arsenal, New York, with an estimated completion date of Jan. 15, 2023. Fiscal 2020 Army working capital funds in the amount of $29,034,547 were obligated at the time of the award. U.S. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity (W56HZV-20-F-0396). Manson Construction, Seattle, Washington, was awarded a $26,493,750 firm-fixed-price contract for maintenance dredging. Bids were solicited via the internet with two received. Work will be performed in Plaquemines, Louisiana, with an estimated completion date of June 20, 2021. Fiscal 2020 civil operations and maintenance funds in the amount of $26,493,750 were obligated at the time of the award. U.S. Army Corps of Engineers, New Orleans, Louisiana, is the contracting activity (W912P8-20-C-0061). Kallidus Technologies Inc.,* Lowell, Massachusetts, was awarded a $15,478,911 firm-fixed-price contract to construct a new security forces and communications training facility. Bids were solicited via the internet with six received. Work will be performed in Westhampton Beach, New York, with an estimated completion date of April 1, 2022. Fiscal 2020 military construction (Army National Guard) funds in the amount of $15,478,911 were obligated at the time of the award. U.S. Property and Fiscal Office, New York, is the contracting activity (W50S8E-20-C-0005). Bell Textron Inc., Fort Worth, Texas, was awarded a $13,500,000 order-dependent contract to conduct design studies, analyses, simulation, testing, integration and fabrication activities in order to mitigate risks, investigate operational usage and conduct maturation activities at the technology, subsystem and system-level maturation for the Future Attack Reconnaissance Aircraft and its variants. Bids were solicited via the internet with two received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 7, 2025. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W911W6-20-D-0006). Enviremedial Services Inc.,* Oceanside, California, was awarded a $9,455,140 firm-fixed-price contract for a vehicle wash system, preventive maintenance and inspections, labor, management, supervision, tools, materials and equipment to perform facility support services at Marine Corps Reserve centers. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of March 28, 2026. U.S. Army Corps of Engineers, Charleston, South Carolina, is the contracting activity (W912HP-20-D-3000). DEFENSE ADVANCED RESEARCH PROJECTS AGENCY HRL Laboratories LLC, Malibu, California, was awarded a modification to incorporate sole-source additional scope totaling $8,390,427 to previously awarded contract HR0011-19-C-0006 for a Phase 2 Millimeter-wave GaN Maturation (MGM) project. The modification brings the total cumulative face value of the contract to $18,789,575 from $10,399,148. Work will be performed in Malibu, California, with an expected completion date of September 2022. Fiscal 2020 research, development, test and evaluation funds in the amount of $1,950,000 are being obligated at time of award. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity. Kryptowire LLC, McLean, Virginia, was awarded a $7,337,148 cost-plus-fixed-fee contract for a research project under the Open, Programmable, Secure 5G (OPS-5G) program. The OPS-5G program will create open source software and systems enabling secure 5G and subsequent secure mobile networks such as 6G. Work will be performed in McLean, Virginia; Blacksburg, Virginia; and Fairfax, Virginia, with an expected completion date of September 2024. Fiscal 2020 research, development, test and evaluation funding in the amount of $883,977 is being obligated at time of award. This contract was a competitive acquisition under an open broad agency announcement and 40 offers were received. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity (HR0011-20-C-0154). *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2340084/source/GovDelivery/

  • JUST IN: New Navy Lab to Accelerate Autonomy, Robotics Programs

    September 9, 2020 | International, Naval

    JUST IN: New Navy Lab to Accelerate Autonomy, Robotics Programs

    9/8/2020 By Yasmin Tadjdeh Over the past few years, the Navy has been hard at work building a new family of unmanned surface and underwater vehicles through a variety of prototyping efforts. It is now standing up an integration lab to enable the platforms with increased autonomy, officials said Sept. 8. The Rapid Integration Autonomy Lab, or RAIL, is envisioned as a place where the Navy can bring in and test new autonomous capabilities for its robotic vehicles, said Capt. Pete Small, program manager for unmanned maritime systems. “Our Rapid Autonomy Integration Lab concept is really the playground where all the autonomy capabilities and sensors and payloads come together, both to be integrated ... [and] to test them from a cybersecurity perspective and test them from an effectiveness perspective,” Small said during the Association for Unmanned Vehicle Systems International's Unmanned Systems conference, which was held virtually due to the ongoing COVID-19 crisis. Robotics technology is moving at a rapid pace, and platforms will need to have their software and hardware components replaced throughout their lifecycles, he said. In order to facilitate these upgrades, the service will need to integrate the new autonomy software that comes with various payloads and certain autonomy mission capabilities with the existing nuts-and-bolts packages already in the unmanned platforms. “The Rapid Autonomy Integration Lab is where we bring together the platform software, the payload software, the mission software and test them,” he explained. During testing, the service will be able to validate the integration of the software as well as predict the performance of the unmanned vehicles in a way that “we're sure that this is going to work out and give us the capability we want,” Small said. The RAIL concept will rely on modeling-and-simulation technology with software-in-the-loop testing to validate the integration of various autonomous behaviors, sensors and payloads, he said. “We will rely heavily on industry to bring those tools to the RAIL to do the testing that we require,” he noted. However, the lab is not envisioned as a single, brick-and-mortar facility, but rather a network of cloud-based infrastructure and modern software tools. “There will be a certain footprint of the actual software developers who are doing that integration, but we don't see this as a big bricks-and-mortar effort. It's really more of a collaborative effort of a number of people in this space to go make this happen," Small said. The service has kicked off a prototype effort as part of the RAIL initiative where it will take what it calls a “third-party autonomy behavior” that has been developed by the Office of Naval Research and integrate it onto an existing unmanned underwater vehicle that runs on industry-made proprietary software, Small said. Should that go as planned, the Navy plans to apply the concept to numerous programs. For now, the RAIL is a prototyping effort, Small said. “We're still working on developing the budget profile and ... the details behind it,” he said. “We're working on building the programmatic efforts behind it that really are in [fiscal year] '22 and later.” The RAIL is part of a series of “enablers” that will help the sea service get after new unmanned technology, Small said. Others include a concept known as the unmanned maritime autonomy architecture, or UMAA, a common control system and a new data strategy. Cmdr. Jeremiah Anderson, deputy program manager for unmanned underwater vehicles, said an upcoming industry day on Sept. 24 that is focused on UMAA will also feature information about the RAIL. “Half of that day's agenda will really be to get into more of the nuts and bolts about the RAIL itself and about that prototyping effort that's happening this year,” he said. “This is very early in the overall trajectory for the RAIL, but I think this will be a good opportunity to kind of get that message out a little bit more broadly to the stakeholders and answer their questions.” Meanwhile, Small noted that the Navy is making strides within its unmanned portfolio, citing a “tremendous amount of progress that we've made across the board with our entire family of UVS and USVs.” Rear Adm. Casey Moton, program executive officer for unmanned and small combatants, highlighted efforts with the Ghost Fleet Overlord and Sea Hunter platforms, which are unmanned surface vessels. The Navy — working in cooperation with the office of the secretary of defense and the Strategic Capabilities Office — has two Overlord prototypes. Fiscal year 2021, which begins Oct. 1, will be a particularly important period for the platforms, he said. “Our two Overlord vessels have executed a range of autonomous transits and development vignettes,” he said. “We have integrated autonomy software automation systems and perception systems and tested them in increasingly complex increments and vignettes since 2018.” Testing so far has shown the platforms have the ability to perform safe, autonomous navigation in according with the Convention on the International Regulations for Preventing Collisions at Sea, or COLREGS, at varying speeds and sea states, he said. “We are pushing the duration of transits increasingly longer, and we will soon be working up to 30 days,” he said. “Multi-day autonomous transits have occurred in low- and high-traffic density environments.” The vessels have already had interactions with commercial fishing fleets, cargo vessels and recreational craft, he said. The longest transit to date includes a round trip from the Gulf Coast to the East Coast where it conducted more than 181 hours and over 3,193 nautical miles of COLREGS-compliant, autonomous operation, Moton added. Both Overload vessels are slated to conduct extensive testing and experimentation in fiscal year 2021, he said. “These tests will include increasingly long-range transits with more complex autonomous behaviors,” he said. "They will continue to demonstrate automation functions of the machinery control systems, plus health monitoring by a remote supervisory operation center with the expectation of continued USV reliability." The Sea Hunter will also be undergoing numerous fleet exercises and tactical training events in fiscal year 2021. “With the Sea Hunter and the Overlord USVs we will exercise ... control of multiple USVs, test command-and-control, perform as part of surface action groups and train Navy sailors on these platforms, all while developing and refining the fleet-led concept of operations and concept of employment,” Moton said. https://www.nationaldefensemagazine.org/articles/2020/9/8/navy-testing-new-autonomy-integration-lab

  • Florence Parly confirme la création d’un fonds dédié à l’innovation dans le secteur de la défense

    September 9, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Florence Parly confirme la création d’un fonds dédié à l’innovation dans le secteur de la défense

    Pour soutenir l'innovation, les crédits du ministère de la Défense doivent, selon la loi de programmation militaire, augmenter de 25 % pour atteindre le milliard en 2022. « Nous devons poursuivre notre investissement dans les technologies de rupture : les planeurs hypersoniques capables de parcourir 100 kilomètres en une seule minute, les armes à énergie dirigée, ces armes qui sont capables de perturber, neutraliser voire détruire un équipement ciblé à distance sans projectile, ou encore les technologies quantiques », a déclaré Florence Parly. Les projets souffrent cependant toujours du manque de fonds pour lancer leur industrialisation. La ministre a donc confirmé le lancement avant la fin de l'année, d'un nouveau fonds d'investissement dont la gestion sera confiée à BPI France. Dénommé Definnov, il sera dédié au développement de technologies civilo-militaires et sera doté de 200 millions d'euros pour financer en fonds propres des entreprises innovantes. Les Echos du 9 septembre 2020

  • La cellule de soutien aux industries de défense toujours active

    September 9, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    La cellule de soutien aux industries de défense toujours active

    Mise en place dès mars dernier, la cellule de soutien de la DGA (Direction générale de l'armement) à la base industrielle et technologique de défense (BITD) lancée à l'initiative du ministère des Armées est toujours mobilisée pour les entreprises qui en ont besoin, rappelle Air & Cosmos. Cette « task force » a déjà réussi à trouver des solutions pour 47 entreprises dont l'activité est stratégique ou critique pour la BITD française. Cela représente pratiquement la moitié « des 92 chantiers ouverts » et d'autres s'annoncent pour l'automne. « Une vague va arriver avec l'automne mais nous ne connaissons pas son ampleur. Certaines sociétés ne le savent peut être pas elles-mêmes et toute la difficulté sera de détecter les problèmes et d'utiliser au mieux les moyens dont nous disposons et dans des délais très contraints », indique l'ingénieur général Vincent Imbert qui dirige cette cellule. Air & Cosmos du 9 septembre 2020

Shared by members

  • Share a news article with the community

    It’s very easy, simply copy/paste the link in the textbox below.

Subscribe to our newsletter

to not miss any news from the industry

You can customize your subscriptions in the confirmation email.