Back to news

December 18, 2018 | International, Aerospace, Naval, Land, C4ISR

The military could save hundreds of billions — by capping pay, scrapping aircraft, slashing benefits, experts say

By:

WASHINGTON — Analysts from the Congressional Budget Office say the government could trim hundreds of billions from the federal deficit by enacting a host of already discussed military and veterans program reforms.

The problem is that those reforms include some of the most controversial and politically unpopular policies of the last few years, things like limiting military pay raises, ending a host of military equipment purchases, and cutting back on veterans benefits.

The document released last week — CBO's annual “options for reducing the deficit” report — lists more than 120 ideas to reduce federal spending or boost federal revenues over the next 10 years. Authors said the goal is to “reflect a range of possibilities” of moves that lawmakers could make in dealing with government debt and escalating federal programming costs.

Twenty of the proposals would affect the departments of Defense and Veterans Affairs, including a plan to cut the Pentagon budget by 10 percent ($591 billion in reduced budget authority over the next decade). That dramatic cut would “require DOD to decrease the size of its forces, slow the rate at which it modernizes weapon systems, or do both,” which in turn would prompt a host of complaints from military leaders and defense lawmakers.

Still, the size of the savings involved show why the ideas continue to attract debate on Capitol Hill each year, even with the significant disruptions they may bring.

Here is a look at some of the other potential VA and Pentagon moves:

Limit pay raises for troops ($18 billion in savings over 10 years)

The CBO idea would give troops an annual raise of 0.5 percent less than the expected growth in civilian salaries. Service members would still see annual raises, but opponents of the idea argue that those increases wouldn't keep up with the cost of living for military families.

President Barack Obama's Pentagon capped the military raises at this level for three years during his presidency, leading to criticism from advocates that he had created a new gap in military and civilian wages. President Donald Trump suggested a 0.3 percent reduction in the expected raise formula in his first budget, but saw the proposal rejected by Congress.

Narrow eligibility for VA disability benefits ($33 billion over 10 years)

The CBO plan would drop a host of conditions not directly related to military service — illnesses like arteriosclerotic heart disease, hemorrhoids and multiple sclerosis — from the list of claims eligible for disability benefits. More than 750,000 veterans' checks would be affected by the move.

Any such trims in benefits have prompted harsh attacks from veterans groups, who have accused supporters of breaking faith with men and women who were promised lifelong assistance for their military service.

Cancel new F-35 purchases ($16 billion over 10 years), retire the F-22 fleet ($30 billion over 10 years) and delay development of the B-21 bomber until after 2028 ($45 billion over 10 years)

All three ideas would require Air Force officials to continue using aging aircraft, a concern for Pentagon planners who have seen a spike in aviation accidents in recent years.

The CBO report acknowledged that a disadvantage of the idea would be making the military “less flexible against advanced enemy air defense systems” but said the current mix of aircraft types already in use by the services would mitigate some of those concerns.

Stop building Ford-class aircraft carriers ($18 billion over 10 years)

Under this option, the Navy would stop building new aircraft carriers after the USS Enterprise, scheduled to be completed in 2027. A carrier set for the start of construction in 2023 would be scrapped.

The CBO report argues that even with the move, the Navy would still have 11 active carriers until 2036 given its current fleet size. However, defense lawmakers have long argued against any delays in ship building schedules, given the long wait for construction and fielding of new vessels.

End VA's Individual Unemployability program for retirement-age veterans ($48 billion over 10 years)

Trump also suggested this idea in his first VA budget, only to have lawmakers and veterans groups soundly reject it.

The IU program provides extra benefits to veterans unable to work because of disabilities, even if they don't have a 100 percent disabled rating. Supporters have argued that money should stop once Social Security payouts begin. Opponents of the idea could leave as many as 235,000 veterans in dire financial need.

Reduce military housing allowances to 80 percent of rent costs ($15 billion over 10 years)

Under this plan, BAH payments wouldn't change for troops until they move, but it would slowly increase their out-of-pocket costs for housing. The change would also create savings for the VA, since post-9/11 GI Bill housing stipends are tied to the military housing formula.

Similar BAH reform proposals on Capitol Hill have met fierce opposition in recent years. Advocates argue that since military members have little say in their next duty assignment, they shouldn't have to shoulder the costs of unexpected moves and expensive housing costs.

Replace thousands of troops with civilian workers ($17 billion over 10 years)

The CBO idea calls for reducing military end strength by 80,000 over four years and replacing them with 64,000 civilian employees. The work would not be directly related to warfighting, and the health care and ancillary costs of non-military workers would create significant savings compared to service members' benefits.

But Congress has worked to increase the military's end strength in recent years, saying it brings more readiness and flexibility to the overall force. An end-strength cut of that size would represent a major political backtrack for many elected officials.

https://www.militarytimes.com/news/pentagon-congress/2018/12/17/analysts-find-hundreds-of-billions-in-military-savings-by-capping-military-pay-scrapping-aircraft-slashing-veterans-benefits

On the same subject

  • Contract Awards by US Department of Defense - May 21, 2020

    May 22, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - May 21, 2020

    U.S. TRANSPORTATION COMMAND Marine Terminals Corp., San Pedro, California, has been awarded a $95,835,034 firm-fixed-price contract (HTC711-20-D-R046) providing stevedoring and related terminal services at ports in Northern California. Work will be performed at the Military Ocean Terminal, Concord, California; and the Port of Oakland, California. The contract period of performance is from Aug. 7, 2020, to Aug. 6, 2025. Fiscal 2020 transportation working capital funds were obligated at award. U.S. Transportation Command, Directorate of Acquisition, Scott Air Force Base, Illinois, in the contracting activity. NAVY AECOM-BAKER-CARDNO NAVFAC Atlantic Planning JV, Arlington, Virginia, is awarded a $95,000,000 maximum amount, firm-fixed-price, indefinite-delivery/indefinite-quantity, architect-engineering contract for architect-engineer services for preparation of Navy and Marine Corps planning and engineering services for work located primarily in the continental U.S. east coast, but also worldwide. The work to be performed provides for: (a) Plans: global shore infrastructure plans; installation development plans; regional integration plans; functional plans; maintenance and sustainment plans; integrated product support plans; encroachment action plans; family housing and bachelor quarters comprehensive neighborhood plans; activity overview plans; and installation appearance plans; (b) Project Planning Documents: the preparation of military construction project planning documentation; preparation of construction cost estimates, preliminary and parametric cost estimates and siting-land use studies/analyses; special site approvals; economic analyses; asset evaluations; basic facility requirements documentation; facilities planning documents; preliminary hazard analyses; preliminary hazard lists, and sustainable design studies; (c) Studies: concept studies; special planning studies, business case analysis studies and traffic/parking/movement studies; facilities planning studies, feasibility studies, safety studies and air installation compatible use zones; range air installation compatible use zones studies; site studies; facilities life cycle studies; activity planning and management models and electronic land use/planning tools/studies. Work is expected to be complete by May 2025. No task orders are being issued at this time. The term of the contract is not to exceed 60 months. Fiscal 2020 operations and maintenance (Navy) (O&M,N) contract funds in the amount of $10,000 are obligated on this award and will expire at the end of the current fiscal year. Future task orders will be primarily funded by O&M, N. This contract was competitively procured via the Navy Electronic Commerce Online website and two proposals were received. The Naval Facilities Engineering Command Atlantic, Norfolk, Virginia, is the contracting activity (N62470-20-D-0006). Lockheed Martin Corp. Rotary and Mission Systems, Baltimore, Maryland, is awarded a $48,965,154 firm-fixed-price modification to previously awarded contract N63394-20-C0004 to exercise options for launch sequencer MK 5 Mod 2 production units in support of the Vertical Launch System. Work will be performed in Oldsmar, Florida. The Vertical Launch System provides area and self-defense, anti-air warfare capabilities, counter-air and land attack cruise missile defense and surface and subsurface warfare capabilities. Work is expected to be complete by April 2022. Fiscal 2019 shipbuilding and conversion (Navy) funds in the amount of $48,965,154 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Surface Warfare Center, Port Hueneme Division, Port Hueneme, California, is the contracting activity. The Boeing Co., Seattle, Washington, is awarded a $27,770,370 modification (P00174) to previously awarded cost-plus-fixed-fee contract N00019-14-C-0067. This modification procures integrated logistics support for the Boeing P-8A Poseidon warfare aircraft for the Navy, the government of Australia, and the government of the United Kingdom. Work will be performed in Seattle, Washington (68%); Jacksonville, North Carolina (16%); Whidbey Island, Washington (4%); Sigonella, Italy (3%); Kadena, Japan (2%); Bahrain, Bahrain (2%); Misawa, Japan (2%); Kaneohe Bay, Hawaii (2%); and various locations within and outside the continental U.S. (1%). Work is expected to be complete by March 2023. Fiscal 2020 aircraft procurement (Navy) funds in the amount of $8,391,473; Royal Australian Air Force cooperative program funds in the amount of $256,187; and Foreign Military Sales funds in the amount of $133,083 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. DRS Laurel Technologies, Johnstown, Pennsylvania, is awarded a $26,047,878 firm-fixed-price modification to previously-awarded contract N63394-20-C-0002 to exercise options for launch control unit Mk 235 Mod 11 and Mod 12 production units in support of the Vertical Launch System (VLS). Work will be performed in Johnstown, Pennsylvania. This option exercise is for the manufacture, assembly, test and delivery of additional production units of the VLS launch sequencer launch control unit Mk 235 Mod 11 and 12, part numbers 7104280-119 and 7104280-129, respectively. The VLS provides area and self-defense, anti-air warfare, surface and subsurface capabilities, counter-air and land attack cruise missile defense, and is equipped with two redundant launch control units, each of which is electrically interfaced with all of the launch sequencers in the system. Work is expected to be complete by February 2021. Fiscal 2020 shipbuilding and conversion (Navy) funding in the amount of $26,047,878 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Surface Warfare Center, Port Hueneme Division, Port Hueneme, California, is the contracting activity. Management Services Group Inc.,* doing business as Global Technical Systems, Virginia Beach, Virginia, is awarded a $24,385,746 firm-fixed-price modification to previously-awarded contract N00024-20-C-5608 for procurement of network, processing and storage (NPS) technical insertion (TI) 16, modification (MOD) 1 production equipment, which provides computer processing and memory, data storage and extraction, network systems and input/output interfaces to host software applications of Navy combat systems. This contract combines purchases for the Navy (62%) and the government of the Commonwealth of Australia (38%) under the Foreign Military Sales (FMS) program. Work will be performed in Virginia Beach, Virginia. The NPS program consists of enterprise products in use across surface Navy combat systems which introduce powerful, commercially available, off-the-shelf processors as part of a general strategy to achieve a modular and open architecture design. NPS is comprised of two different common processing system enclosure assemblies and three variants: advanced storage area network, core computing system, and air-cooled processing and storage subsystem. Aegis weapon system Aegis modernization upgrade equipment systems are also included in this procurement and align requirements to include the Aegis local area network interconnect system, Aegis conversion equipment group Input/Output 1 and 2, and digital video display system. Work is expected to be complete by December 2021. Fiscal 2020 shipbuilding and conversion (Navy) funds; FMS Australia funds; 2015 shipbuilding and conversion (Navy) funds; 2016 shipbuilding and conversion (Navy) funds; and 2020 other procurement (Navy) funds in the amount of $24,385,746 will be obligated at time of award, and funds in the amount of $39,356 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. Innovative Defense Technologies LLC,* Arlington, Virginia, is awarded a $22,506,572 modification (P00007) to previously awarded cost-plus-fixed-fee contract N00014-19-C-1054 for the Cloud to Edge Environment. This modification adds Options 5 through 10, and exercises Options 5, 9 and 10, which increases the contract value by $22,506,572. Under this modification, the contractor will continue work to deliver a secure development and operations (SecDevOps) environment enabling cloud-based collaborative development, simulation, testing and certification of evolving Navy software systems. Work will be performed in Arlington, Virginia (68%); Mount Laurel, New Jersey (23%); Washington, D.C. (6%); Rhode Island (2%); and various places below 1%. Work is expected to be complete by February 2022. Fiscal 2019 research, development, test and evaluation (Navy) funds in the amount of $77,844 are obligated at the time of award and will expire at the end of the current fiscal year. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $20,453,641 are obligated at the time of award and will not expire at the end of the current fiscal year. The Office of Naval Research, Arlington, Virginia, is the contracting activity. Alere San Diego Inc., doing business as Immunalysis Corp., San Diego, California, is awarded a $7,066,152 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for U.S. Food and Drug Administration and quality management documented fentanyl/norfentanyl immunoassay reagent kits for use with the currently installed Beckman Coulter AU5800 series systems for the Department of Defense Drug Demand Reduction Program. This is a two-year single award contract, and deliveries are expected to be complete by May 2022. Fiscal 2020 defense-wide, one-year operations and maintenance funds will be obligated on decentralized individual delivery orders during the base period. No funds will be obligated at the time of award and the minimum guarantee under the contract is 100 kits. The contract was competitively procured via the Federal Business Opportunities website, and three offers were received. The Naval Medical Logistics Command, Fort Detrick, Maryland, is the contracting activity (N62645-20-D-5004). ARMY Raytheon Co., Tewksbury, Massachusetts, was awarded a $92,370,000 hybrid (cost-no-fee, cost-plus-fixed-fee, and firm-fixed-price) contract for sustainment, maintenance, training, refurbishment, overhaul, engineering services and spares to support ongoing operations of the National Advanced Surface to Air Missile System. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 14, 2024. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-20-D-0008). AECOM Management Services Inc., Germantown, Maryland, was awarded a $10,507,113 modification (0001BW) to contract W52P1J-12-G-0028 for logistics support services, including maintenance, supply and transportation. Work will be performed at Fort Polk, Louisiana, with an estimated completion date of Nov. 17, 2020. Fiscal 2020 operations and maintenance (Army) funds in the amount of $10,507,113 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. Integration Innovation Inc.,* Huntsville, Alabama, was awarded an $8,310,128 modification (000117) to contract W31P4Q-18-A-0089 for the International Apache Technical Lifecycle Support task order. Work will be performed in Huntsville, Alabama, with an estimated completion date of June 4, 2021. Fiscal 2020 Foreign Military Sales (Egypt, India, Indonesia, Israel, Japan, Kuwait, Netherlands, Qatar, Saudi Arabia, Singapore, Republic of Korea, Taiwan, United Arab Emirates and United Kingdom) funds in the amount of $8,310,128 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. DEFENSE LOGISTICS AGENCY Creighton AB Inc.,* Reidsville, North Carolina, has been awarded a maximum $12,080,120 indefinite-delivery/indefinite-quantity contract for men's and women's dress coats. This was a competitive acquisition with two responses received. This is a one-year base contract with four one-year option periods. Locations of performance are North Carolina and New York, with a May 20, 2021, performance completion date. Using military service is Air Force. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-20-D-1274). AIR FORCE LinQuest Corp., Los Angeles, California, has been awarded an $11,008,552 firm-fixed-price modification (P00047) to contract FA8819-15-F-0001 for the Space and Missile Systems Center technical support follow-on task order bridge extension. This modification provides continued technical support services for the Special Programs Directorate, Los Angeles Air Force Base, California. Work will be performed at Los Angeles AFB, California, and is expected to be completed May 31, 2021. Fiscal 2020 operations and maintenance funds in the amount of $856,651; and fiscal 2020 research, development, test and evaluation funds in the amount of $3,000,000 are obligated at the time of award. The U.S. Space Force, Space and Missile Systems Center, Special Programs Directorate, Los Angeles AFB, California, is the contracting activity. Central Coast Water Authority, Buellton, California, has been awarded a $7,600,000 indefinite-delivery/indefinite-quantity delivery order to provide Vandenberg Air Force Base, California, and outlying municipalities with potable water. Work will be provided at Vandenberg AFB, California, and is expected to be completed June 14, 2032. The cumulative value of this contract is $165,443,388. Fiscal 2020 operations and maintenance funds in the amount of $7,593,715 are being obligated at the time of award. The 30th Contracting Squadron, Vandenberg AFB, California, is the contracting activity (F04684-92-D-0013). *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2194990/source/GovDelivery/

  • Elbit Systems Awarded $670 Million Contract to Supply Defense Solutions to a Country in Asia-Pacific

    February 19, 2020 | International, C4ISR

    Elbit Systems Awarded $670 Million Contract to Supply Defense Solutions to a Country in Asia-Pacific

    Haifa, Israel, February 18, 2020 – Elbit Systems Ltd. (NASDAQ: ESLT, TASE: ESLT) (“Elbit Systems”) announced today that it was awarded an approximately $670 million contract to supply defense solutions to a country in Asia-Pacific. The contract will be performed over a 25-month period. Bezhalel (Butzi) Machlis, Elbit Systems President & CEO, commented: “This significant contract award is a testament to the trust that customers place with our solutions and to the leading position we hold in the market.” About Elbit Systems Elbit Systems Ltd. is an international high technology company engaged in a wide range of defense, homeland security and commercial programs throughout the world. The Company, which includes Elbit Systems and its subsidiaries, operates in the areas of aerospace, land, and naval systems, command, control, communications, computers, intelligence surveillance and reconnaissance (“C4ISR”), unmanned aircraft systems, advanced electro-optics, electro-optic space systems, EW suites, signal intelligence systems, data links and communications systems, radios and cyber-based systems and munitions. The Company also focuses on the upgrading of existing platforms, developing new technologies for defense, homeland security and commercial applications and providing a range of support services, including training and simulation systems. For additional information, visit: https://elbitsystems.com/, follow us on Twitter or visit our official Facebook, Youtube and LinkedIn Channels. Contacts: Company Contact: Joseph Gaspar, Executive VP & CFO Tel: +972-4-8316663 j.gaspar@elbitsystems.com Rami Myerson, Director, Investor Relations Tel: +972-77-2946403 rami.myerson@elbitsystems.com David Vaaknin, VP, Brand & Communications Tel: +972-77-2946691 david.vaaknin@elbitsystems.com IR Contact: Ehud Helft Gavriel Frohwein GK Investor Relations Tel: 1-646-688-3559 elbitsystems@gkir.com View source version on Elbit Systems Ltd: https://elbitsystems.com/pr-new/elbit-systems-awarded-670-million-contract-to-supply-defense-solutions-to-a-country-in-asia-pacific/

  • Extending Field of View in Advanced Imaging Systems

    August 12, 2019 | International, C4ISR

    Extending Field of View in Advanced Imaging Systems

    New program focuses on developing curved infrared focal plane arrays to improve optical performance and widen field of view while reducing system size of military imagers The military relies on advanced imaging systems for a number of critical capabilities and applications – from Intelligence, Surveillance, and Reconnaissance (ISR) and situational awareness to weapon sights. These powerful systems enable defense users to capture and analyze visual data, providing key insights both on and off the battlefield. Today, nearly all imaging systems rely on detector arrays fabricated using planar processes developed for electronic integrated circuits on flat silicon. While significant progress has been made in advancing these technologies for narrow field of view (FOV) systems, optical aberrations can limit the performance at the periphery in wide FOV systems that then require large, costly, and complex optics to correct. The trade-off for correcting optical aberrations by using large, heavy lenses is a reduction in optical signal and a large size penalty, which limits their use for new and emerging capabilities. “Tremendous progress has been made over the past 20 years towards making multi-megapixel infrared (IR) focal plane arrays (FPA) for imaging systems cost effective and available to the Department of Defense,” said Dr. Whitney Mason, a program manager in DARPA's Microsystems Technology Office (MTO). “However, limitations to the technology's performance and size remain. Current advances on the commercial side have shown the viability of small area, curved FPAs (CFPAs) for visible cameras. While these technologies have shown modest benefits, more must be done to achieve the performance and size requirements needed for imaging systems used in emerging defense applications.” DARPA developed the FOcal arrays for Curved Infrared Imagers (FOCII) program to expand upon the current commercial trend for visible sensor arrays by extending the capability to both large and medium format midwave (MWIR) and/or longwave (LWIR) infrared detectors. The program seeks to develop and demonstrate technologies for curving existing state-of-the-art large format, high performance IR FPAs to a small radius of curvature (ROC) to maximize performance, as well as curve smaller format FPAs to an extreme ROC to enable the smallest form factors possible while maintaining exquisite performance. FOCII will address this challenge through two approaches to fabricating a curved FPA. The first involves curving existing state-of-the-art FPAs, while keeping the underlying design intact. The focus of the research will be on achieving significant performance improvements over existing, flat FPAs, with a target radius of curvature of 70mm. The fundamental challenge researchers will work to address within this approach is to mitigate the mechanical strain created by curving the FPGA, particularly in silicon, which is very brittle. The second approach will focus on achieving an extreme ROC of 12.5 mm to enable a transformative reduction in the size and weight compared to current imagers. Unlike the first approach, researchers will explore possible modifications to the underlying design, including physical modifications to the silicon that could relieve or eliminate stress on the material and allow for creating the desired curvature in a smaller sized FPA. This approach will also require new methods to counter the effects of any modifications during image reconstruction in the underlying read-out integrated circuit (ROIC) algorithm. The FOCII program is hosting a proposers' day on August 13, 2019 at the Executive Conference Center, 4075 Wilson Blvd., Suite 300, Arlington, Virginia, 22203 from 9:00 a.m. to 4:00 p.m. EDT. The purpose of this meeting is to provide information on the FOCII program, promote additional discussion on this topic, address questions from potential proposers, and provide an opportunity for potential proposers to share their capabilities and ideas for teaming arrangements. The Special Notice for can be found here, https://www.fbo.gov/index.php?s=opportunity&mode=form&id=4c8a360d1f5be2e1b7e784f86b7d42fb&tab=core&_cview=0 Full details are available in the FOCII Broad Agency Announcement on FBO.gov: https://go.usa.gov/xV3EH. https://www.darpa.mil/news-events/2019-08-09

All news