Back to news

July 15, 2020 | International, Aerospace

Japan Self-Defense Force Accepts Delivery of First V-22 Osprey

By:

July 14, 2020 3:45 PM

A V-22 Osprey aircraft bound for the Japan Ground Self-Defense Force based at Camp Kisarazu prepares to depart Marine Corps Air Station (MCAS) Iwakuni, Japan, July 6, 2020. The ferry flight from MCAS Iwakuni marked the delivery of the first V-22 to the Japan Self-Defense Force. US Marine Corps photo.

Japan accepted delivery of its first Bell Boeing V-22 Osprey on Friday, making it the first nation outside the U.S. to own and operate the tiltrotor aircraft.

The Japan Ground Self-Defense Force (JGSDF) took delivery of the aircraft at Camp Kisarazu, across the Tokyo Bay from Yokosuka, according to news releases from Bell and Boeing, who collaborate on the aircraft program.

“Congratulations to Japan on becoming the first international operator of the Osprey,” Kurt Fuller, Bell Boeing program director, said in a release.
“The delivery of the Japanese V-22 represents a milestone for revolutionary aircraft capabilities for the Government of Japan and is a testament to our enduring friendship. The Osprey will provide Japan a tremendous advantage, unlike ever before, to respond to a broad range of challenges throughout the Asia Pacific region.”

The Japanese V-22 variant has a unique configuration with a Japanese-specific communication system, according to the news releases. Despite the different communication system, JGSDF personnel have been working with U.S. Marines since May to learn how to operate the aircraft ahead of accepting delivery of their own Osprey.

“This is an exciting moment in our partnership with the JGSDF; we have had the pleasure of working with them state-side to produce, develop, train and maintain their initial fleet of aircraft,” Marine Corps Col. Matthew Kelly, program manager for the V-22 Joint Program Office (PMA-275), said in the news release.
“This arrival marks a key step in standing up its V-22 fleet, and more importantly, the continued collaboration between our nations.”

The start of Japan's V-22 fleet comes shortly after the U.S. Navy also accepted its first V-22 – called the CMV-22 – to carry out the carrier onboard delivery (COD) mission once the aging C-2A Greyhound propeller planes retire. Bell Boeing delivered the first aircraft to the “Black Jacks” of Air Test and Evaluation Squadron (HX) 21 in February, and the first operational aircraft arrived at Naval Air Station North Island in California last month to begin building up the inventory of the “Titans” of Fleet Logistics Multi-Mission Squadron (VRM) 30.

Marine Corps pilots and maintainers have also helped train their Navy counterparts on the aircraft, much like they have been doing in Japan. The Navy variant has extended range due to additional fuel tanks, a beyond-line-of-sight high-frequency radio, a public address system for passengers and an improved lighting system for cargo loading, all to assist in the COD mission ferrying people, supplies and mail across a carrier strike group at sea.

Unlike the C-2, which could only fly from shore to the aircraft carrier, the V-22 will be able to reach the surface combatants in the CSG directly, thanks to its ability to land and take off vertically like a helicopter.

Prior to Japan deciding to buy the V-22 in 2015, Japanese citizens long had concerns about American V-22s operating out of Japanese bases, particularly Okinawa, due to the aircraft's early safety record. Even as recently as 2018, after the V-22 had established itself as a safe and reliable aircraft, Defense News reported that safety concerns from residents near Camp Kisarazu delayed the delivery of Bell Boeing's first aircraft to Japan.

https://news.usni.org/2020/07/14/japan-self-defense-force-accepts-delivery-of-first-v-22-osprey

On the same subject

  • Army Ponders What To Cut If Budget Drops: Gen. Murray

    June 11, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Army Ponders What To Cut If Budget Drops: Gen. Murray

    The Army Futures commander is making a list of which of the service's 34 top-priority programs to sacrifice first – and which programs outside the top 34 he has to save. By SYDNEY J. FREEDBERG JR.on June 10, 2020 at 4:18 PM WASHINGTON: The Army Secretary and Chief of Staff approved a draft spending plan for 2022-2026 yesterday that funds all 34 of the service's top-priority programs, the Army's modernization chief said this morning. But with the ever-growing cost of COVID looming over the economy and the Pentagon alike, Gen. John “Mike” Murray says he's already made a mental list of which of the 34 the service might have to slow down or sacrifice and which ones it absolutely has to save. “I have a one-to-N list in my mind” of the 34 programs, Murray told an Association of the US Army webcast this morning. “That's only in my mind, right now,” he emphasized. “It's pre-decisional.” In other words, it's not final, it's not official, and it's not ready to share with the public. All that said, however, it's still a telling sign of uncertain budget times that the four-star chief of Army Futures Command not only has such a list, but is willing to say he has it. Meanwhile, Murray's chief civilian partner, Assistant Secretary for Acquisition Bruce Jette, has launched a long-term study of the Army's economic prospects. In effect, Jette's looking at the supply side, asking how tight the budget will be, and Murray is looking at the demand side, asking what the Army should prioritize within that tight budget. Beyond The 34: “Critical Enablers” Gen. Murray is also looking at the Army's 684 other programs, he said, to determine which of them can be cut – while some have been slashed already to free up funding for the 34, others are so far unscathed – and which are essential to the top-34's success. “We can come up with, you know, the most impressive Next Generation Combat Vehicle in the world,” Murray said. “If you can't get fuel to it, then you're wasting your time.” Fuel is just one, particularly knotty logistical problem. Ultimately, Murray wants to reduce Army fuel demands by moving to hybrid diesel-electric motors. While electric power by itself might work for civilian cars, he said, he's skeptical the Army can charge batteries in combat, or that any practical amount of batteries can store enough energy to move, say, a 70-ton main battle tank. Likewise, while civilian quadcopters can run off batteries, the Army's new scout helicopter, the Future Attack Reconnaissance Aircraft, requires a high-powered turbine. So for decades to come, the Army will need fuel trucks, storage bladders, pumps, drums, hoses, and so on. And that's just for the gas. Both current and future combat systems require a staggering array of spare parts, repair tools, maintenance facilities, and more. Logistics is historically a US strength, but it's not a major focus of the 34 priority programs, which range from hypersonic missiles to smart rifles, from tanks to aircraft to robots. Besides weapons, the 34 do include a lot of high-tech information-age infrastructure, both to train the troops in virtual and augmented reality, and to share tactical data like target locations across the battlefield. There has not, however, been nearly as much emphasis on supporting functions such as fuel, maintenance, and transport. Murray now aims to fix that. Starting with a study by the Combined Arms Center at Fort Leavenworth, he said, the Army has come up with a list of “18 key critical enablers that are getting funded,” Murray said, again without naming them. Murray's calling the 34 priority programs “Tier One” and the 18 enablers “Tier Two,” he said. “Then tier three is ammo,” he added. The general didn't elaborate, but certainly a high-tech tank or aircraft can't fight without ammunition, just as it can't move without fuel. The catch is that, in modern warfare, you're not just buying rifle bullets and cannon shells, but a host of precision-guided munitions that are much more expensive to stockpile in bulk for a major war. Even once the Army has figured out which weapons, support systems, and ammunition it can afford to buy, it still won't be able to buy enough of them to equip every unit at once. The service's recent AimPoint study, Murray said, focused on figuring out which units around the world need to be modernized first and which will have to wait. “The whole point behind AimPoint was an understanding that you can't modernize the entire army overnight, or in a year, or really even in a decade,” Murray said. As a young officer, he recalled, his unit had M60 tanks and M113 transports “while the rest of the Army was running around in M1s and Bradleys.” While he doesn't to return to the extreme disparities of the past, he said, “somebody has to be first and somebody has to be last.” https://breakingdefense.com/2020/06/army-ponders-what-to-cut-if-budget-drops-gen-murray/

  • StandardAero valued at $10.4 bln as shares jump in NYSE debut

    October 2, 2024 | International, Aerospace

    StandardAero valued at $10.4 bln as shares jump in NYSE debut

  • Price Drop: Lockheed Pitches $80M F-35A to Pentagon

    May 8, 2019 | International, Aerospace

    Price Drop: Lockheed Pitches $80M F-35A to Pentagon

    BY MARCUS WEISGERBER That's the cheapest price yet for the Air Force version of the fifth-generation jet. Lockheed Martin is offering to come down more than 10% on the price of the least-expensive F-35 as it negotiates the largest sale yet of Joint Strike Fighters. The company is offering to sell the Pentagon about 100 F-35As — the version flown by the U.S. Air Force and most allies — for less than $80 million each, down from $89.5 million apiece in the deal signed last September. That price point suggests the company will meet its 2020 price targets for the warplane, whose lengthy development and higher-than-expected initial costs have drawn much criticism. The 100 F-35A are part of a block buy of three production lots of the jets — in all, roughly 450 jets. The order will include F-35Bs for the Marine Corps, F-35Cs for the U.S. Navy, and a variety of the jets for allies. “We currently have an offer submitted to the Department of Defense for Lots 12-14 that is below the $80 million F-35A for lot 14 in 2020, per our longstanding commitment,” company spokesman Mike Friedman wrote in an email Tuesday. “This represents equal or less than the procurement cost of legacy jets, while providing a generational leap in capability.” The latest round of F-35 negotiations come as the Air Force is planning to buy new Boeing-made F-15 Eagle fighters for the first time in two decades. While the new Eagles would replace existing F-15s, Lockheed has arguedthe F-35 is a cheaper alternative and offers stealth and other technology that comes standard in a more modern, fifth-generation warplane. The proposed purchase of three batches of jets simultaneously is meant to get a better price than past years' annual purchases of a few dozen of the jets. A 2018 Rand study put the potential savings at more than $2 billion. Lockheed has delivered more than 385 F-35s to the U.S. Air Force, Navy, Marine Corps and American allies. “As we ramp up production, each year we have lowered cost, reduced build time, improved quality and on time delivery,” Friedman said. “Moving forward, we are focused on and taking action to further reduce costs across both production and sustainment.” https://www.defenseone.com/business/2019/05/price-drop-lockheed-pitches-80m-f-35a-pentagon/156825

All news