Back to news

December 11, 2023 | International, Land

Homeland defense interceptor defeats ballistic missile in test

Missile Defense Agency sees successful takedown using an upgraded Ground-Based Interceptor for homeland missile defense of a ballistic missile target.

https://www.defensenews.com/land/2023/12/11/homeland-defense-interceptor-defeats-ballistic-missile-in-test/

On the same subject

  • The US Army is building a ‘cloud in the sky’ for its aviation fleet

    October 15, 2019 | International, Aerospace

    The US Army is building a ‘cloud in the sky’ for its aviation fleet

    By: Jen Judson WASHINGTON — The Army is building what is essentially a “cloud in the sky” for its current aviation fleet as it prepares the aircraft to fight alongside a future fleet under development, according to Brig. Gen. Thomas Todd, the program executive officer for Army aviation. The general spoke to Defense News in an interview ahead of the Association of the U.S. Army's annual conference. The current fleet won't dissolve into thin air when future helicopters are fielded, and they will be expected to fly together in operational environments across multiple domains. The Army is aiming to field a future attack reconnaissance aircraft and a future long-range assault aircraft by 2030. “We have to figure out a way to host a common server so that we can store data, process data and transport data quicker,” Todd said. “So while they work on the future vertical lift architecture, we still have to make the enduring fleet, that will fly alongside it, work and be capable.” So the Army is building an Aviation Mission Common Server, or AMCS, that is a stack of storage, data processing and transport capability “that's very much a flying cloud, if you will,” Todd said. The AMCS “will reside inside every aircraft. It has to reside in every aircraft because there has to be onboard processing and storage power,” Todd said, adding that it will be the engine that drives the associated user interface and apps as well as provide connectivity to the network overall. The user interface will be built upon the technology developed by Northrop Grumman for the Victor-model Black Hawk. The "V" model is an L-model UH-60 with a digital, modern cockpit like the "M" model, the latest Black Hawk variant, but not with an M-model price tag. Additionally, the interface in a V model can take on new capability through apps like a smartphone. The V model wrapped up its initial operational test and evaluation in September at Joint Base Lewis-McChord in Washington state, Brig. Gen. MacMcCurry, who is the Army G-3/5/7 aviation director inside the Pentagon, told Defense News in a separate interview. He reported the tests went well and the service looks forward to building out the fleet. The Army is currently assessing integrating the same user interface into Mike-model Black Hawks, according to Todd. The effort to build the server is part of a larger effort to ensure the current fleet is ready to fight in multidomain operations. The Army wants to obtain multidomain dominance by 2035. “We took a look at Army Futures Command's guidance on exactly what those combat aviation brigades would have in them and what would be enduring. For example, the Apache would be there indefinitely,” Todd said. “We also found that the requirements for data, the transport of and use of was exponential. So ultimately it's a problem that exists for the entire fleet, so we need to get after, at a minimum, making the enduring fleet compatible with future vertical lift, if not more capable.” There are several cross-cutting initiatives for the current fleet to make the aircraft more agile, interoperable, survivable and integrated in multidomain operations, Todd said, and the network will play an integral role. For example, the Army is working with the network community to replace its AN/ARC-201 radios with radios with the TSM waveform, which will improve and comply with future air-to-ground radio communications, according to Todd. There is also work being done within the position, navigation and timing community and with the Air Force to develop antennas, processors and software that hep the current fleet to survive battle, Todd added. And the service is working to improve power sources onboard aircraft. “There is a huge demand requirement coming, a demand signal for onboard systems and the power requirements of those is exponential. So given that it's not linear and it's going to grow exponentially, we have to get after alternative means,” Todd said. The same team that is in charge of the Improved Turbine Engine Program — which will replace engines in Apaches and Black Hawks and be the engine for the future attack reconnaissance aircraft — is looking at supplemental power units, upgrades to generators and upgrades to batteries to better power onboard systems that may not require the main power system anymore, Todd said. https://www.c4isrnet.com/2019/10/15/the-us-army-is-building-a-cloud-in-the-sky-for-its-aviation-fleet

  • Navy Issues Sikorsky $550.4 Million Modification for 6 CH-53Ks

    October 29, 2020 | International, Aerospace, Naval

    Navy Issues Sikorsky $550.4 Million Modification for 6 CH-53Ks

    Mallory Shelbourne This post has been updated to include a new photo of the CH-53K from Sikorsky. The Navy has issued Lockheed Martin-owned Sikorsky a $550.4 million contract modification for the next lot of the Marine Corps' new heavy-lift helicopter. The Navy awarded Sikorsky the funds for six CH-53K King Stallions as part of lot 4 of the program's low-rate initial production phase, according to an Oct. 26 Pentagon contract announcement. “The production of this CH-53K helicopter represents a new era in capabilities, technologies, safety and mission flexibility for the U.S. Marine Corps,” Bill Falk, the CH-53K program director for Sikorsky, said in a statement. “Sikorsky is committed to supporting the Marine Corps to maximize the benefits of this all-new helicopter,” he added. “Pilots are already training on state-of-the art flight training devices to prepare in a safe, cost-effective manner for operational deployment.” The Navy anticipates Sikorsky finishing the work in July 2024, according to the announcement. USNI News previously reported that the Navy restructured the CH-53K test program to address technical deficiencies discovered on the test aircraft. Sikorsky and the Marine Corps announced the two had found a fix to one of the main problems – exhaust gas reingestion – in December 2019. The Navy decreased the number of aircraft it planned to purchase in the Fiscal Year 2021 budget request because it had not yet identified fixes to several technical problems. Lt. Gen. Steven Rudder, the former Deputy Commandant of the Marine Corps for Aviation, told the House Armed Service tactical air and land forces subcommittee earlier this year that the service was ready to increase the rate of production in hopes of bringing cost of the aircraft down. “The higher the numbers, the greater the learning curve from production,” Rudder told the panel of lawmakers at the time. “As we saw with F-35, as we ramp production, the cost curve comes down.” https://news.usni.org/2020/10/27/navy-issues-sikorsky-550-4-million-modification-for-6-ch-53ks

  • Farnborough International launches FIA Connect, a digital aerospace event

    June 1, 2020 | International, Aerospace

    Farnborough International launches FIA Connect, a digital aerospace event

    Farnborough International has launched FIA Connect: a platform to connect the global aerospace industry. Taking place during what would have been the 2020 airshow week, FIA Connect will run from July 20-24. Over five days, there will be a series of free-to-attend digital aerospace events, including a full virtual conference program focussed on topics leading industry and featuring high profile speakers, as well as range of business growth opportunities. Speaking about the launch of FIA Connect, Gareth Rogers, chief executive of Farnborough International said: “The cancellation of the airshow in response to the COVID-19 pandemic was a major shock, however the team is determined to create something that brings as many aspects of the show to the global aerospace industry as possible. “Through our biennial airshow, we have been privileged to serve as a platform for connecting industry, facilitating business growth, and showcasing the very latest in innovation and technology. “The Farnborough International team is working hard to deliver a week of world-class content and thought leadership in order to provide some support to industry at a time when we cannot meet.” Registration for FIA Connect is set to go live in the middle of June. The schedule of events includes: The FINN Sessions – a comprehensive webinar program of insight and analysis featuring leading figures and focussed on the topics that matter: MRO, defence, airlines, space, urban aviation and future workforce. Meet the Buyer is to run free-of charge on Tuesday July 21. This is a strategic opportunity, connecting suppliers with buying decision makers at pre-arranged, private and secure virtual meetings. Farnborough Friday a day developed to help address the skills gap, this virtual hub will include careers advice, inspirational speaker videos, downloads and workshops. ADS Partnership – FIA Connect is partnering with ADS Group, the U.K. trade association for aerospace, defence and security, to provide support, guidance and topical sessions of analysis, giving the best of insight and resource to help business keep up to date, informed and connected. All content for FIA is being created in-house by the team at Farnborough International with the technological capability being delivered by Eventscase: a platform designed to facilitate all key areas of live, hybrid and virtual events. https://www.skiesmag.com/press-releases/farnborough-international-has-launched-fia-connect-a-digital-aerospace-event/

All news