Back to news

February 2, 2018 | Information, Aerospace

Defence Procurement - Air

Public Services and Procurement Canada is responsible for the oversight of major aircraft procurement initiatives, including:

The department is also responsible for acquiring a wide range of complex aerospace systems, including military and civilian aircraft, and related mechanical systems, equipment, aircraft trainers and simulators and logistic spares. It also acquires various services such as engineering, repair and overhaul, maintenance, modifications, component repair, publications maintenance and revision services.

https://www.tpsgc-pwgsc.gc.ca/app-acq/amd-dp/air/index-eng.html

On the same subject

  • The Air Force’s new information warfare command still has work before full integration

    September 17, 2020 | Information, Aerospace

    The Air Force’s new information warfare command still has work before full integration

    Mark Pomerleau WASHINGTON — While the Air Force's new information warfare command has reached its full operational capability less than a year after it was created, leaders still have work to do to fully integrate its combined capabilities in a mature fashion. That assessment comes from Brig. Gen. Bradley Pyburn, deputy commander of 16th Air Force, who on Tuesday laid out a three-pronged criteria — deconfliction, synchronization and integration — for assessing the command's maturity during a virtual event hosted by AFCEA's Alamo chapter. The command combines what was previously known as 24th and 25th Air Force, placing cyber, intelligence, surveillance and reconnaissance, electronic warfare and weather capabilities under a single commander. The first category Pyburn coined is deconfliction, which essentially means “do no harm.” Pyburn described the need to have situational awareness of the battlespace and understand what friendly and enemy forces are where, what authorities exist, what targets forces are looking at and what capabilities they have. The second phase of maturity is synchronization, which involves aligning all the capabilities and actions in the battlespace. Pyburn said if the command adds activity A to activity B and C, it will end up with a greater result, because it can change the timing and tempo of how the effects are delivered for maximum impact. Lastly, Pyburn described integration as the most mature aspect of where 16th Air Force currently is. This involves baking in planning, assessment, command and control, all the desperate effects and operations from the beginning. This is where the command really begins to break down all the stovepipes that previously existed with all these capabilities, a key reason for integrating and creating the new organization. “From a maturity perspective, where do I think 16th Air Force is? We're probably somewhere between deconfliction and synchronization. We've got some examples of where we approach integration but I think it's healthy we understand where we're at today and where we want to go forward in the future,” Pyburn explained. The command has created what Pyburn called a J9 to help with assessing maturity. The J9 would be plugged into real world events and exercises to help with those self assessments. In a generic example, Pyburn outlined what full maturity integration would look like. A mission partner requests support, which could be in the form of air domain awareness, finding particular targets or threats or ISR assistance. 16th Air Force, in turn, would be able to link that request with other needs, either in the same geographic area or in other areas of operations, pioneering what its top officials describe as a “problem-centric approach,” which aims to look at the specific problems the commands they support are looking to solve and starting from there. “[In] our problem centric approach, as we look to generate insights across all of our 16th Air Force capabilities, what we may find is that particular problem set is linked to other problem sets and we're able to focus on the root cause of the problem,” Pyburn said. Based on a raft of authorities from cyberspace to intelligence collection as well as the relationships built through other communities and organizations, 16th Air Force can look at the root cause of a problem and build from there. “We can build a community of interest, we can start to put mission partners together into [an] operational planning team and we can not only generate better insights against that root cause, we can start to look at how we can layer in effects at speed and at scale across all domains of warfare and give the options to the combatant commander and the mission partner as the authorities to go after that adversary,” Pyburn said. Pyburn also offered insight into the command structure of 16th Air Force, which has his deputy commander job along with a vice commander role. That latter job, held by Brig. Gen. David Gaedecke — who previously served as the lead for the Air Force's year long electronic warfare study — does more of the traditional operational, test and evaluation functions. In the deputy commander role, Pyburn said his job is similar to the director of operations. He comes up with the requirements in support of combatant commanders. “Part of it is, I may think I know what I want, but if I don't see what the art of the possible is, it's really hard to know what I want, if that makes sense. It's a little bit of a chicken and egg,” he said. https://www.c4isrnet.com/information-warfare/2020/09/16/the-air-forces-new-information-warfare-command-still-has-work-to-go-to-fully-integrate/

  • Contract Awards by US Department of Defense – September 17, 2020

    September 18, 2020 | Information, Aerospace, Naval, Land, Security, Other Defence

    Contract Awards by US Department of Defense – September 17, 2020

    NAVY Collins Aerospace, Cedar Rapids, Iowa, is awarded a $316,733,831 modification (P00015) to previously awarded firm-fixed-price contract N00421-18-D-0004. This modification exercises an option for the procurement of 11,313 AN/ARC-210(v) radios for installation in over 400 strategic and tactical airborne, seaborne and land based (mobile and fixed) platforms for the Navy, Marine Corps, Army, Coast Guard, other government agencies and Foreign Military Sales customers. Work will be performed in Cedar Rapids, Iowa, and is expected to be completed by September 2023. No funds are being obligated at time of award. Funds will be obligated on individual delivery orders as they are issued. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity. Marathon Construction Corp., Lakeside, California (N62473-16-D-1802); Granite-Healy Tibbitts JV, Watsonville, California (N62473-16-D-1803); Reyes Construction Inc., Pomona, California (N62473-16-D-1804); Manson Construction, Seattle, Washington (N62473-16-D-1805); and R.E. Staite Engineering Inc.,* San Diego, California (N62473-16-D-1806), are awarded $75,000,000 to increase the aggregate capacity of the previously awarded suite of firm-fixed-price, indefinite-delivery/indefinite-quantity, multiple award construction contracts. The maximum dollar value including the base year and four option years for all five contracts combined is increased from $240,000,000 to $315,000,000. The contracts are for new construction, repair and renovation of various waterfront facilities at various locations predominantly within the Naval Facilities Engineering Command (NAVFAC) Southwest area of responsibility (AOR). Work will be performed predominantly within the NAVFAC Southwest AOR including, but not limited to, California (98%), and will be available to the NAVFAC Atlantic AOR (2%) as approved by the contracting officer. No funds are being obligated on this award and no funds will expire. Future task orders will be primarily funded by military construction (Navy); operations and maintenance (O&M) (Navy); O&M (Marine Corps); and Navy working capital funds. The original contract was competitively procured via the Navy Electronic Commerce Online website, with 13 proposals received. NAVFAC Southwest, San Diego, California, is the contracting activity. Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $70,847,707 modification (P00023) to previously awarded cost-plus-incentive-fee contract N00019-19-C-0010. This modification provides requirements decomposition through system functional review for the F-35 Super Multi-Function Aircraft Data Link Band 5 receiver warning capability in support of the Navy, Air Force, Marine Corps, and non-Department of Defense (DOD) participants. Work will be performed in Nashua, New Hampshire (35%); San Diego, California (20%); Fort Worth, Texas (20%); Baltimore, Maryland (15%); and Hunt Valley, Maryland (10%), and is expected to be completed by June 2023. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $821,960; fiscal 2020 research, development, test and evaluation (Air Force) funds in the amount of $821,960; non-DOD participant funds in the amount of $356,080 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Testek LLC, Wixom, Michigan, is awarded a $38,071,331 firm-fixed-price, indefinite-delivery/indefinite-quantity contract. This contract is for the production and delivery of up to 42 Aircraft Generator Test Stands (AGTS), 41 for the Navy and one for a Foreign Military Sales customer. The AGTS will be used to conduct full functional testing of the new F/A-18E/F and EA-18G G4 generator converter units, the V-22 Constant Frequency Generator and Variable Frequency Generator, the ALQ-99 Ram Air Turbine Generator and generators tested by the legacy Aircraft Engine Component Test Stand (AECTS) at those sites where the AECTS is being replaced by the AGTS. Work will be performed in Wixom, Michigan, and is expected to be completed by September 2026. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was competitively procured via an electronic request for proposal, two offers were received. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity (N68335-20-D-0048). General Electric Aviation, Lynn, Massachusetts, is awarded a $19,631,873 cost-plus-fixed-fee order (N00019-20-F-0748) against previously issued basic ordering agreement N00019-16-G-0005. This order provides project management as well as recurring and non-recurring engineering support, materials and documentation to implement, manage and report on the B-Sump Additive Manufacturing, Temperature Distortion Sensitivity Test, second source bearing, second source external hose and fittings, Second Source Accessory Gear Box, and emergency oil system elimination cost reduction initiatives in support of the CH-53K T408 engine. Work will be performed in Lynn, Massachusetts (80%); Patuxent River, Maryland (15%); and Evendale, Ohio (5%), and is expected to be completed by December 2024. Fiscal 2018 aircraft procurement (Navy) funds in the amount of $14,997,273; and fiscal 2019 aircraft procurement (Navy) funds in the amount of $4,634,600 will be obligated at time of award, $14,997,273 of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. U.S. SPECIAL OPERATIONS COMMAND Battelle Memorial Institute, Columbus, Ohio, received a ceiling increase modification in the amount of $140,000,000 to an indefinite-delivery/indefinite-quantity contract for the production of Non-Standard Commercial Vehicle 2 (H92222-16-D-0043). This modification raises the contract ceiling to $310,000,000 to account for additional emergent Special Operations Forces requirements. The work will be performed in Columbus, Ohio, and is expected to be completed by July 2023. This modification was awarded through a sole-source acquisition in accordance with 10 U.S. Code 2304(c)(1) and Federal Acquisition Regulation 6.302.1. U.S. Special Operations Command, Tampa, Florida, is the contracting activity. MISSILE DEFENSE AGENCY Modern Technology Solutions Inc. (MTSI),* Huntsville, Alabama, is being awarded a noncompetitive cost-plus-fixed-fee contract with a total value of $68,503,410. Under this new contract, the contractor will support the extension of Missile Defense System capabilities through evaluation, identification and maturation of new technologies and future concepts (e.g. hypersonics, cruise missiles, cyber offense and defense, artificial intelligence/machine learning, quantum science, left-through-right-of-launch integration, fully networked command and control and directed energy) to support the Concepts and Performance Lab (CAPL) under the Missile Defense Agency's Advanced Technology initiative. The CAPL program shall support these initiatives by maturing advanced interceptor and sensor concepts models and simulations, algorithm development/implementations, laboratory experiments and/or ground and flight-testing required for technical and operational assessment of capabilities. The work will be performed in Huntsville, Alabama. The period of performance is Sept. 17, 2020, through Sept. 16, 2023, with two one-year options. Fiscal 2020 research, development, test and evaluation funds in the amount of $3,800,000 are being obligated on this award. The Missile Defense Agency, Redstone Arsenal, Alabama, is the contracting activity (HQ0860-20-C-0006). DEFENSE LOGISTICS AGENCY LOC Performance Products Inc.,* Plymouth, Michigan, has been awarded a maximum $47,634,898 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for left and right final drives. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five-year contract with no option periods. Location of performance is Michigan, with an Aug. 30, 2025, ordering period end date. Using military service is Army. Type of appropriation is fiscal 2020 through 2025 defense working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-20-D-0093). Golden State Medical Supply Inc., Camarillo, California, has been awarded a maximum $10,306,354 fixed-price, requirements contract for Duloxetine HCL DR (hydrochloride, delayed release) capsules. This was a competitive acquisition with three responses received. This is a one-year base contract with four one-year option periods. Locations of performance are California and Spain, with a Sept. 16, 2021, performance completion date. Using customers are Department of Defense, Department of Veterans Affairs, Indian Health Services and Federal Bureau of Prisons. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting agency is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2D2-20-D-0098). ARMY Marinex Construction Inc., Charleston, South Carolina, was awarded a $33,998,700 firm-fixed-price contract for maintenance and new work dredging. Bids were solicited via the internet with four received. Work will be performed in Charleston, South Carolina, with an estimated completion date of July 10, 2022. Fiscal 2020 civil construction funds in the amount of $31,639,750 were obligated at the time of the award. U.S. Army Corps of Engineers, Charleston, South Carolina, is the contracting activity (W912HP-20-C-0008). Benaka Inc.,* New Brunswick, New Jersey, was awarded a $9,162,000 firm-fixed-price contract for design and build renovations and additions for an Army Reserve Center. Bids were solicited via the internet with four received. Work will be performed in Orangeburg, New York, with an estimated completion date of Sept. 7, 2022. Fiscal 2020 operations and maintenance (Army) Reserve funds in the amount of $9,162,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-20-C-0038). General Dynamics Information Technology, Falls Church, Virginia, was awarded an $8,204,786 modification (P00026) to contract W81XWH-17-F-0078 for administrative support services for the U.S. Army Medical Materiel Activity. Work will be performed at Fort Detrick, Maryland, with an estimated completion date of Sept. 30, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $8,204,786 were obligated at the time of the award. U.S. Army Medical Research Acquisition Activity, Fort Detrick, Maryland, is the contracting activity. Zodiac-Poettker HBZ JV LLC,* St. Louis, Missouri, was awarded a $7,516,000 firm-fixed-price contract to design and construct a dining facility for the Veterans Affairs (VA) Law Enforcement Training Center and Eugene J. Towbin Healthcare Center. Bids were solicited via the internet with six received. Work will be performed in North Little Rock, Arkansas, with an estimated completion date of April 12, 2022. Fiscal 2019 VA minor construction funds in the amount of $7,516,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Little Rock, Arkansas, is the contracting activity (W9127S-20-C-6013). DEFENSE ADVANCED RESEARCH PROJECTS AGENCY Strategic Analysis Inc., Arlington, Virginia, has been awarded a $10,040,273 modification (P00008) to previously awarded contract HR0011-19-F-0101 for engineering, artificial intelligence and machine learning, social science, chemistry, physics, mathematics, materials and front office technical and administrative support services. The modification brings the total cumulative face value of the contract to $19,805,466 from $9,765,193. Work will be performed in Arlington, Virginia, with an expected completion date of September 2021. Fiscal 2020 research, development, test and evaluation funds in the amount of $2,237,061 are being obligated at time of award. The Defense Advanced Research Projects Agency, Arlington, Virginia, is the contracting activity. WASHINGTON HEADQUARTERS SERVICES Logistics Management Institute, Tysons, Virginia, has been awarded a $7,714,127 firm-fixed-price-level-of-effort and time-and-materials contract. The contract provides a broad range of Department of Defense logistics and program support operations to the Assistant Secretary of Defense for Sustainment, the Office of Deputy Assistant Secretaries of Defense for Logistics and the Office of Deputy Assistant Secretaries of Defense for Materiel Readiness. This includes analytic support, meeting facilitation, statistical and data analyses and subject matter expertise in various logistics disciplines and government/commercial supply chain practices; strategic communications; operational contract support; private security contractors; vendor threat mitigation; and strategic integration. Fiscal 2020 operations and maintenance funds in the amount of $7,714,127 are being awarded. The expected completion date is June 25, 2025. Washington Headquarters Services, Arlington, Virginia, is the contracting activity (HQ0034-20-F-0505). AIR FORCE Riverside Research Institute, New York, New York, has been awarded a $7,051,887 cost-plus-fixed-fee contract for the research and development of algorithms and tools to produce high-quality radio frequency modeling data. Work will be performed at Wright-Patterson Air Force Base, Ohio, and is expected to be completed by Sept. 30, 2025. Fiscal 2020 research, development, test and evaluation funds in the amount of $1,140,000 are being obligated at the time of award. Air Force Research Laboratory, Wright-Patterson AFB, Ohio, is the contracting activity (FA8650-20-C-1131). *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2352082/source/GovDelivery/

  • The Army wants a singular focus, not one-off solutions

    June 10, 2019 | Information, C4ISR

    The Army wants a singular focus, not one-off solutions

    By: Mark Pomerleau The days of one-off solutions for providing situational awareness and command-and-control information in the Army could be numbered. “We are on the verge of putting tactical common operating environment capability into the Army organization in the very near term,” Col. Troy Crosby, project manager for mission command at Program Executive Office for Command, Control and Communications-Tactical, said June 6 at the C4ISRNET Conference in Arlington, Virginia. The Army is getting ready to field the first set of capabilities under a new modernized network architecture in 2021, which will include the first iteration of the Command Post Computing Environment (CP CE). CP CE is a web-enabled system that will consolidate current mission systems and programs into a single user interface. Crosby said CP CE is on the verge of receiving a critical decision from the Army this month as to whether or not it has passed all of its tests and can be used by soldiers in combat. The Army has been trying to incorporate a DevOps process for CP CE using a variety of units to experiment with the capability that can provide direct feedback on the system to the program office. However, one of the key lessons they learned, according to Crosby, was they used too many test units: six in total. “With that many partners trying to do all the exercises that those different level echelon commands and organizations wanted to do, that piece became untenable,” he said. “I think at least for our portfolio, somewhere around three is a much better level.” Similarly, Crosby noted that the difficulty with mission command is each commander has their own way of performing it. As the Army was trying to come up with a common solution for all units with CP CE, they had to make sure they tailored the capability for the Army rather than an individual commander they received feedback from during the developmental process. https://www.c4isrnet.com/show-reporter/c4isrnet-conference/2019/06/07/the-army-wants-a-singular-focus-not-one-off-solutions/

All news