Introduction

In the autumn of 2019, the federal government announced on www.buyandsell.gc.ca the creation of a discussion group to address in-service support for the Canadian Surface Combatants (CSCs). The objective of Canada's procurement is 15 warships and the project is in the early stages of modifying the design of the U.K.'s global combat ship (GCS), with the first Canadian ship delivery anticipated after 2025. It must be assumed that this discussion group formation is the first stage of industry consultation.

The City-class Type 26 frigate design has been in development for over a decade and the first of eight U.K. Type 26 warships is now in production. BAE Systems won the contract for the design and construction work in the U.K. This design has been available for export under the moniker global combat ship, and both Canada and Australia have selected it – the latter intending to build nine Hunter-class frigates.

While neither the Australian nor Canadian designs have been completed, the combat systems will apparently be quite different across the three nations. However, it is unlikely that the major platform design will change dramatically. If this assumption is correct, it could mean that the major equipment of the platforms of some 32 hulls would likely be substantially the same.

And from an in-service support point of view, this clearly creates an opportunity for international co-operation wherever it makes sense.

TOP OF PAGE


Conventional Wisdom – International Programs

There are indications that three-nation government-to-government meetings have taken place to exchange views on creating a user group during the acquisition activity. It would make sense to also explore a related arrangement for in-service support.

Clearly, with the potential to support 32 equipment sets across the marine platforms, there are many opportunities for economies of scale which could reduce the costs for all three nations – for common design modifications, for spares through bulk buys, for depot-level maintenance with many more units, for common training of potentially two to four times individual nations' throughput/requirements and the like. Such synergies could be worth hundreds of millions of dollars in savings over the extended lives of these warships.

But international programs are not always easy to establish and implement, for many reasons.

Nations are very different. They place different priorities on defence matters so the simple co-ordination required to achieve timely agreements can be difficult. Governments also change and a falling-out between two nations can lead to reversals. Nations lose some of their autonomy in decision-making when they join such programs, which can be a major deterrent. And governments have approaches to contracting which are very different, so negotiations on behalf of multiple governments can become bogged down in disagreements as to what approaches nations will support.

In a perfect world, Canadian and Australian officials might have included an option during the design selection competitions so that such international in-service support programs could have been enabled by adopting a number of mandatory attributes. Unfortunately, the variability in schedules driving Canada's and Australia's frigate programs, as well as the built-in challenges of running competitions, conspired against any detailed discussion of “what ifs”.

Work share (or industrial benefits) is important – to the domestic industries and thus to governments that always care about high-value jobs of the sort one finds in defence-related work. Without doubt, companies in all three countries are already seeing dollar signs and/or may already have won certain rights during the competitions for selection. Hence, Australia and Canada would be unlikely to sign up if all the work is being done, say, in Europe because the bar to agree to collaborate for other reasons could be so high as to be a non-starter. And there could be a number of other challenging commercial issues related to such things as intellectual property that could affect the shape of work-share agreements.

There are also many tactical issues. The three time zones are not conducive to ongoing dialogue; one should never underestimate the challenges of working across large distances. As simple as international meeting arrangements should be, one of the partners will not be able to make it at the 11th hour more often than one expects – much less the travel budget involved and/or the cost of personnel liaison/exchange programs between the countries. Canada's Treasury Board is frequently much more involved in expensive and long-term international contracts, routinely requiring the tedious achievement of annual approvals. Nations and organizations have different laws/regulations and standards respectively which must be synchronized upfront and as changes occur.

And so it goes. One can conclude that, aside from international information exchange forums, complex business arrangements involving both governments and industries in international programs detrimentally impact a nation's autonomy in decision-making and often offer fewer economic benefits. They are not for the faint of heart.

TOP OF PAGE


Conventional Wisdom – The Opportunity

If one were to consider an international three-party in-service support (ISS) program for common platform major equipment/systems which would leverage BAE Systems as the common ISS agent, wouldn't there be potentially significant benefits to Canada? On the face of it, one must assume that the answer is “maybe” and this is worth exploring.

In reviewing this option from a Canadian perspective, it would be appropriate to assess the ISS outcomes against the four sustainment pillars as now mandated for inclusion in the business cases driving Department of National Defence (DND) ISS procurement decisions: performance (operational readiness), value for money (price at or below the market rate), flexibility (adaptable and scalable to accommodate change in operational tempo and available budgets) and economic benefits (jobs and economic growth for Canadian companies).

As mentioned earlier, international programs often render economic benefits much more elusive. However, in terms of performance, flexibility and value for money, there is no doubt that the potential exists to see maximum return on investment. In the case under review, BAE Systems is reported to be the second largest Western defence contractor and therefore should be able to wield the clout that comes with it when dealing with major equipment system manufacturers (OEMs). And of course, the supplemental impact must also be understood and catered to – BAE Systems can choose to be difficult in any business arrangement without significantly affecting its bottom line.

With respect to contractual response to major equipment and systems performance (which contributes to technical readiness), a client with a large work share is more likely to get attention for initiatives to maintain and improve performance than will smaller clients. This would be important in this case because the three navies operate in significantly different environments around the world with the concomitant variations in some performance requirements. As well an OEMs' failure to address the concerns of three allied navies could result in being blacklisted by BAE Systems when procuring equipment/systems for new ship designs, while timely and effective contractual response could lead to future opportunities. Low performance achievement could also deliver a much more significant blow to an OEM's reputation if more than one navy is impacted detrimentally – witness the Boeing scenario with the 737 Max. This can be important, as select foreign OEMs have essentially ignored Canada before when Canadian Armed Forces (CAF) equipment has suffered performance shortfalls. From a performance perspective, an international ISS program with BAE Systems at the centre could be a plus.

In terms of providing adaptability and scalability, the presence of a number of clients can allow reductions in the demand for various services by one client (e.g., facing a budget downturn) to be picked up by another on an interim basis. Alternatively, the need for a surge in support by one navy (e.g., facing major unforeseen operations) may be easier to address by diverting some degree of effort from other clients. Only in the case where all clients are experiencing a similar variation in demand will such flexibility be jeopardized; but such a challenge can equally accrue whether in an international support program or not. Therefore, on balance, there can be greater flexibility in traditional circumstances for an international program, but there are limits.

Value for money should be a strong argument for an international collaboration, if only because of economies of scale when considering, in this case, a fleet of 32 ship sets instead of eight, nine or 15 – and that is as-fitted, with spares increasing the overall numbers of common units of equipment. As an ISS client agent with much more maintenance, repair work and spares demand for an OEM, there would be greater interest in keeping multiple navies happy with the prices paid and the requirement over time to see support costs reduced. International programs frequently benefit by pooling spare units and ownership by OEMs, such that the number required (and hence the costs) are lower and risks to availability can be somewhat mitigated. Instead of each nation addressing emerging technical issues separately, sharing the costs should make it cheaper for all. So too are there potential benefits for OEM infrastructure, as top-notch physical plant and software assurance against cyber-attack are much more affordable to all concerned.

Hence, the conventional wisdom is that such an international in-service support program should offer a better return on investment in terms of greater performance at lower costs, as well as the possibility for greater scalability to adapt to variations in demand for services. But as mentioned earlier, this comes typically with the potential for fewer economic benefits for Canada – clearly an important consideration.

TOP OF PAGE


Unique Considerations of the Case at Hand

In exploring a possible international program for the U.K., Australia and Canada to leverage their selection of the same basic platform design and designer (BAE Systems), it is useful to accept the conventional wisdom but explore additional factors that should be weighed in a sustainment business case. What follows is a potpourri of additional considerations worthy of study.

It is useful to address what could be included in the term “in-service support”. Based on common equipments and systems, it could include design agent services, maintenance, spares, training and documentation within an integrated data environment, to name the most important few. Nations could also select from among these options for hybrid arrangements.

Near the top of the list for CSC is the fact that it is under the umbrella of the National Shipbuilding Strategy (NSS). The strategy specifically prevents the NSS shipyards from providing a single day of in-service support once they are delivered to the Royal Canadian Navy (RCN) unless such shipyards win those rights through a competitive procurement process. This is unique – a departure from past approaches in Canadian government shipbuilding – and quite frankly considered to be imprudent. In the very early days of a new class of complex ships, the prime contractor (often the build shipyard and/or designer) usually provides as a minimum a number of years of ISS. The shipbuilder typically has the best expert knowledge that exists for the initial years of services, along with the relationships and a degree of leverage with the major equipment/systems' OEMs. Normally, an in-service support bridging contract is awarded concurrent with the ship construction contract. Often, the prime contractor is then awarded a long-term ISS contract. There is a story as to why ship maintenance support for vessels delivered under NSS departed from the norm (there is always a story), and confirmation should be obtained as soon as possible that the earlier decision is reversible, to allow the business case to include all options.

Related to the former paragraph, Canada has relatively recently awarded a contract to Thales for support services for the Arctic offshore patrol ships and the joint support ships. Although these ships have yet to be turned over to the RCN, one would expect that even at this early stage many lessons have been learned which should be taken into account when conducting the business case, such as whether the knowledge was/is available to support first-day-under-power with the RCN.

BAE Systems is at the heart of the potential international program. From the internet alone, one observes that, among other classes of Royal Navy (RN) ships, BAE Systems manages design, equipment maintenance and ship modifications for the RN's Type 45 destroyers. It therefore would be important to ask the RN how well their approach is working and to explore the details of the existing contract, infrastructure arrangements, innovations introduced and performance to date. This would be a bellwether to the likelihood that the RN would be at least interested in an international support program for their Type 26 frigates in terms of capability and customer-focused cultural flexibility at BAE Systems. And if they have misgivings and/or if Australia is not interested, the international program option may be eliminated from the business case. One would expect that all three nations would support the generation of their own business cases and compare conclusions before making decisions.

Earlier, I offered the assumption that the platform systems are likely to employ the same major equipment systems, but that the combat systems are unlikely to be common. But to overstate the obvious, warships are not like layer cakes – they do not have separate top and bottom halves. The three naval variants being procured are exceptionally integrated and complex super-systems. Therefore, in-service support must address both sets of major equipment/systems – platform and combat systems. BAE Systems is the overall combat systems integrator for the Type 26 frigates destined for the RN and an obvious choice to deliver in-service support. Lockheed Martin Canada is the equivalent for the CSC. And BAE Systems Australia is partnered with Lockheed Martin Australia and Saab Australia to deliver the combat system integration for the Hunter-class frigates. Therefore, an international – almost-whole-of-ship – ISS solution might even offer significant economic benefits to all three nations. This could create challenges based on the proverbial “too many eggs in one basket”, and certain safeguards would be required.

It is worthwhile to note an anomaly in Canada's case regarding the construction of these warships. BAE Systems is responsible for building all of the ships in question in the U.K. and Australia, but Irving Shipbuilding is responsible under NSS to construct the CSCs. One should never underestimate the shipbuilder's knowledge when dealing with a complex seagoing vessel, and a sole platform-related focus on BAE Systems alone would, in the Canadian case, be a deficit in any international program. Irving Shipbuilding's contribution should therefore be considered in the business case for Canada. Should the business case be strong, there is an argument that a directed contract to an Irving-BAE partnership for in-country platform in-service support would make sense and be in the public's interest. As mentioned earlier, although this was prohibited under the original terms of the National Shipbuilding Procurement Strategy, it could be waived in this instance for those warships that will be the backbone of Canada's maritime defence for 30 years. It would provide significant economic benefits as well.

There is clearly the significant potential of operational value to such an arrangement, in addition to strong performance supporting day-to-day readiness. The three nations are on three different continents, and all three navies pursue global deployments. The availability of full ISS in or within the reach of Canada, the U.K. and Australia provides significant benefits to all three navies over their 30-year lives when breakdowns occur far from home port.

The business case should take into account the fact that the U.K. may export the global combat ship design more broadly in the world. If an international consortium delivering in-service support were in place, it could become an important selling feature for potential buyers of the GCS. This undoubtedly could enhance value for money, flexibility and performance for the three plank owner nations. And from a Canadian perspective, as the nation with the largest stake in the game at 15 warships, we should be able to significantly influence the contractual arrangements with current and future parties to the international program.

A typical and expensive part of the life cycle of warships is midlife conversions. Combat systems in particular require modernization to employ new technologies designed to address new threats. These are extremely complex endeavours. Once again, the degree of value for money through life could be even greater, depending on the degree of commonality of the equipment upgrade options selected. And the very fact that Canada would see opportunities worth considering as fully developed options would in itself offer potential cost benefits that would otherwise be unlikely to occur.

As part of the business case analysis, it would be useful to study the commercial marine industry examples of international in-service support. Large ship operators and OEMs are very experienced in working across national and client boundaries to deliver economical services. Any business case should capture the pros and cons more broadly in the commercial business sector as well.

There could be a benefit as part of an international program in terms of the people required. As the proverb goes, many hands make light work. Since the launch of what was then termed the National Shipbuilding Procurement Strategy, Canada's marine HR challenges within government have become more pronounced. An international program could lighten the load while expanding the experience base for involved government and naval personnel in tackling the demands of supporting as complex a platform as the CSC.

It would be important to understand the challenges surrounding the governance in the broadest sense. Though not at all unique, governance would likely need to be structured to address three separate functions – the integrated supplier-client engagement, the clients' government-to-government activity and industry-to-industry supplier co-ordination. While not uncommon when contracting for goods and services for complex systems, the international aspects, length of the arrangement and the ever-increasing volatility in the marketplace are noteworthy. With such complexity and the constantly changing stakeholders involved over 30 years, the mechanisms for a strong and appropriate relationship alignment would be critical to long-term success. When dealing with a high degree of complexity in an international program such as this, the business case needs to assess the likelihood that the collaboration can be created and maintained in terms of the critical enabling relationships.

In the factors highlighted here and as with any business case, the importance of comparing the international program solution with what seems to be the more recent and typical Canadian in-service solution resulting from a competitive procurement cannot be underestimated. Arctic and Offshore Patrol Ships and Joint Support Ships In-Service Support (AJISS) is the latest Canadian example and must be carefully analyzed even at this early stage to determine the prognosis for achieving the desired outcomes. Again, engagement with allies to assess their experience with single-nation support scenarios would be important in establishing the right comparators to enable coherent business case recommendations.

It would be prudent to consider the long view as part of the business case – including such things as the likelihood that nations would retire their warships at different times or even opt out of the international ISS program long before end-of life. While much can change, an early appreciation and understanding of various scenarios and the related risks would be important.

As a final point, such complicated business case assessments are never easy. After assembling the assumption set and the criteria analysis, and after negotiating “les grandes lignes” of a contractual agreement, it would be important to avoid the common pitfall of allowing one or two pros or cons to dominate the decision-making. Too often, the complexity that defies the “kiss principle” leads to rejection of otherwise optimum solutions. But at the end of the day, one must accept that it will be a judgment call.

TOP OF PAGE


Concluding Material

Under the five-year-old Defence Procurement Strategy, Public Services and Procurement Canada (PSPC) is responsible for leading the industry engagement that launches defence procurement processes. More recently, the ISS procurement strategies have been based on the results of the sustainment initiative business case led by DND.

At virtually every opportunity over the past decade, I have emphasized the importance of managing expectations. In every discussion with industry, it behooves those leading the CSC in-service support exploration activity to include the possibility of an international program solution. To eliminate that option without study would be both shortsighted and inexcusable. Also, failing to repeatedly ensure that all stakeholders are aware of the potential for such an outcome would lack transparency and be disingenuous.

When the RCN's readiness to deliver operational capability is at stake, along with billions of Canadian taxpayers' dollars for CSC in-service support over 30 years, it matters. And an international in-service support program for the new frigates of Canada, the U.K. and Australia is an important option worth considering.

TOP OF PAGE


About the Author

After a 38 year career with the Royal Canadian Navy, Ian Mack (Rear-Admiral Retired) served for a decade (2007-2017) as the Director-General in the Department of National Defence responsible for the conception, shaping and support of the launch and subsequent implementation of the National Shipbuilding Strategy, and for guiding the DND project managers for the Arctic Offshore Patrol Ships, the Joint Support Ships and the Canadian Surface Combatants. He also had responsibility for four vehicle projects for the Canadian Army until 2015. Since leaving the government, he has offered his shipbuilding and project management perspectives internationally. Ian is a longstanding Fellow of the International Centre for Complex Project Management. He also is allied with Strategic Relationships Solutions Inc. He is married to Alex, and has three grown children. With few accommodations for impaired mobility, he remains active. Upon retirement, he founded a small business, Xi Complexity Consulting Inc. in Ottawa Canada.

TOP OF PAGE


Canadian Global Affairs Institute

The Canadian Global Affairs Institute focuses on the entire range of Canada's international relations in all its forms including (in partnership with the University of Calgary's School of Public Policy), trade investment and international capacity building. Successor to the Canadian Defence and Foreign Affairs Institute (CDFAI, which was established in 2001), the Institute works to inform Canadians about the importance of having a respected and influential voice in those parts of the globe where Canada has significant interests due to trade and investment, origins of Canada's population, geographic security (and especially security of North America in conjunction with the United States), social development, or the peace and freedom of allied nations. The Institute aims to demonstrate to Canadians the importance of comprehensive foreign, defence and trade policies which both express our values and represent our interests.

The Institute was created to bridge the gap between what Canadians need to know about Canadian international activities and what they do know. Historically Canadians have tended to look abroad out of a search for markets because Canada depends heavily on foreign trade. In the modern post-Cold War world, however, global security and stability have become the bedrocks of global commerce and the free movement of people, goods and ideas across international boundaries. Canada has striven to open the world since the 1930s and was a driving factor behind the adoption of the main structures which underpin globalization such as the International Monetary Fund, the World Bank, the World Trade Organization and emerging free trade networks connecting dozens of international economies. The Canadian Global Affairs Institute recognizes Canada's contribution to a globalized world and aims to inform Canadians about Canada's role in that process and the connection between globalization and security.

In all its activities the Institute is a charitable, non-partisan, non-advocacy organization that provides a platform for a variety of viewpoints. It is supported financially by the contributions of individuals, foundations, and corporations. Conclusions or opinions expressed in Institute publications and programs are those of the author(s) and do not necessarily reflect the views of Institute staff, fellows, directors, advisors or any individuals or organizations that provide financial support to, or collaborate with, the Institute.

https://www.cgai.ca/an_in_service_support_opportunity

On the same subject

  • ANALYSIS: Cloud lifted from GDLS Saudi deal, but future business uncertain: analyst

    April 14, 2020 | Local, Land

    ANALYSIS: Cloud lifted from GDLS Saudi deal, but future business uncertain: analyst

    Canada's $14-billion deal to sell armoured vehicles to Saudi Arabia is going ahead and will keep a London defence giant rolling, but some say questions remain about future business between General Dynamics Land Systems Canada (GDLS) and the desert kingdom. NORMAN DE BONO Canada's $14-billion deal to sell armoured vehicles to Saudi Arabia is going ahead and will keep a London defence giant rolling, but some say questions remain about future business between General Dynamics Land Systems Canada (GDLS) and the desert kingdom. The federal government said it's lifting a moratorium on new permits for military exports to Saudi Arabia, a critical step for London since GDLS, with about 2,000 employees in London, has a nearly 40-year relationship supplying armoured vehicles to the Saudis. But Ottawa also said it's appointing an advisory panel of experts to review Canada's arms export process and to push for an international inspection for arms sales. That could threaten future business, warned analyst David Perry, vice-president of the Canadian Global Affairs Institute. The Canadian-Saudi deal, with GDLS at the centre, negotiated by the former Conservative government and inherited by the Liberal successor, had come under sharp attack, with some critics calling for it to be scrapped, amid concerns about Saudi Arabia's poor human rights record. “If I was a worker I would be tremendously relieved and happy they made the decision,” Perry said of the federal government. He stressed reviews of the contract determined there was no indication GDLS vehicles were involved in human rights violations. “This went back and forth for a few years, and the government reviewed and threatened to cancel this contract outright. I think there has been irreparable harm. If you're another country open to exports, they may be thinking twice about doing business with Canada,” said Perry. “They (Saudi Arabians) have options when it comes to sourcing. I think they may be thinking in the future about where they source (their military equipment).” Lifting the cloud from the Saudi deal comes at a critical time on the London business landscape, with the fallout of the coronavirus pandemic and the lockdowns that have brought new uncertainty for many employers. In clearing the air on the deal, the federal government also revealed it would have been on the hook for up to $14 billion if it had cancelled the contract to sell light armoured vehicles to the Saudis, a deal that dates to 2014. The review panel, however, poses a level of uncertainty in future business dealings, Perry noted. “A new export panel will offer another layer of review. I don't know how to interpret that. It depends on who is appointed to that panel,” he said. In 2018, after news broke that the Saudi government had ordered the murder of dissident journalist Jamal Khashoggi, the Trudeau Liberals announced a review of all Canada's existing arms sales to Saudi Arabia. Ottawa also slapped a moratorium on new export permits for shipments of military goods to Riyadh. Existing military contracts, such as the GDLS deal, were not affected by the moratorium. But in 2018 Prime Minister Justin Trudeau publicly talked about trying to find a way to end shipments of armoured vehicles to Saudi Arabia. Thursday, Foreign Affairs Minister François-Philippe Champagne and Finance Minister Bill Morneau said the suspension of approval of new Saudi permits is now lifted. They cited a government review last September that found no credible evidence linking Canadian exports of military or other controlled goods to Saudi human rights violations. But the moratorium on trade with the Saudis has already affected the Canadian defence sector to the tune of about $2 billion, according to a memo sent to the foreign affairs minister from two top foreign affairs and international trade officials. “(Twenty) companies that have a history of exporting to KSA (Kingdom of Saudi Arabia) suggest that approximately $2 billion in trade has been affected since August 2018. A number of Canadian exporters to KSA have suspended their business development operations . . . The open-ended nature of Canada's moratorium on new export permits, and the lack of identified conditions that would allow a resumption of permit issuance, present a high commercial risk for Canadian companies,” the memo says. Perry, who shared the memo with The Free Press, said he has heard similar concerns from the Canadian defence sector. “I have spoken to businesses that have lost business opportunities” from the moratorium on arms trade with Saudis. “This is welcome news,” he added of the lifting of restrictions, “but the government has introduced uncertainty into Canadian defence industry and exports.” Political scientist Erika Simpson at Western University also questioned the role of the panel, saying there are few details about its authority and adding that only Global Affairs has the authority to impact trade agreements. She also questioned why the contract appears to have been reduced by $1 billion in value. When the Conservatives announced it in 2014, it was worth $15 billion. Ottawa now says it is a $14-billion contract. “I think $1 billion is a lot of money. What happened to $1 billion?” asked Simpson, an associate professor of international politics. “This is good news, but I want to know where the $1 billion went.” GDLS Canada declined comment Friday. Perry also questioned the timing of the announcement. With more than three million Canadians expected to be left unemployed due to the COVID-19 crisis, Ottawa could not jeopardize thousands of jobs across Canada, he said. “As important as this is in Southwestern Ontario, it is not just Southwestern Ontario,” he said. London Liberal MP Peter Fragiskatos downplayed down the idea the review panel could dampen further GDLS business. “I don't think so. This government is behind this contract, this workforce, 100 per cent. On the contrary, I would say a review is a good thing. It will bring greater transparency to the arms program. I welcome it,” the London North Centre MP said. He also stressed the Saudi deal is only about half complete, meaning about six more years of work may remain before there needs to be a discussion about future contracts. “I am pleased to say the least. It was in the making for some time, but it is a very good result not just for the company and its workers, but for the city,” said Fragiskatos. It's too soon to draw conclusions about the future of work by GDLS for the Saudis, since that depends largely on who is at the table negotiating future deals, said Bill Pettipas, former president of GM Defence, which General Dynamics bought and renamed. Pettipas bargained several arms contracts with foreign powers, including a multi-billion dollar deal with the U.S. army to supply it with Stryker armoured vehicles. “It depends on individuals, on relationships. It will get resolved. It will normalize eventually. That relationship has been going on since the early 1980s,” said Pettipas. “Time takes care of things.” Officials with Unifor Local 27, the union for many GDLS workers in London, couldn't be reached for comment Friday. Unifor's national office declined comment. https://lfpress.com/news/local-news/analysis-cloud-lifted-from-gdls-saudi-deal-but-future-business-uncertain-analyst

  • Team Artemis Adds Canadian Companies for Royal Canadian Air Force’s Remotely Piloted Aircraft System Program

    April 22, 2021 | Local, Aerospace

    Team Artemis Adds Canadian Companies for Royal Canadian Air Force’s Remotely Piloted Aircraft System Program

    Highlights:  Four Canadian aerospace companies join team  Companies bring engineering, logistics, training and simulation and mission management expertise  Team's supplier base collectively employs more than 18,000 Canadians MIRABEL, Quebec, April 22, 2021 – Four Canadian companies have joined Team Artemis, expanding its expertise and capabilities to support the Royal Canadian Air Force's (RCAF) Remotely Piloted Aircraft Systems (RPAS) program. Airbus Defence and Space Canada, based in Ontario, joins Alberta-based companies ATCO Frontec, Canadian UAVs and Lockheed Martin CDL Systems as members of Team Artemis, led by L3Harris Technologies, a global technology innovator, and Israel Aerospace Industries (IAI), a world leader in unmanned aircraft system (UAS) development. The additions to Team Artemis bring expertise in aeronautics engineering, deployed logistics, training and simulation, and mission management capability. They complement team members that provide crucial Canadian components – the WESCAM MX-Series EO/IR turret from L3Harris and the PT6A engine from Quebec-based Pratt & Whitney Canada. L3Harris, with Canadian operations in 14 locations and six provinces, is serving as prime contractor and will provide C4ISR integration for the platform as well as all in-service support functions for the planned contract duration of more than 25 years. The Team Artemis supplier base collectively employs more than 18,000 Canadians, generates $11 billion in revenue and operates throughout the country. “The addition of these well-established, innovative and highly qualified companies further strengthens our position to offer the RCAF the most capable solution for its RPAS requirements,” said Ugo Paniconi, General Manager, L3Harris in Mirabel. “Our team will offer a proven, cost-effective solution, which will include substantial and sustainable Canadian industrial content – resulting in significant work packages and jobs across the country.” Team Artemis offers the Artemis UAS, which is based on IAI's Heron TP UAS but uniquely designed to meet Canadian specifications. The Heron TP has been in service for more than 10 years with the Israeli Air Force and has been selected by the German Armed Forces. It is the only combat-proven system that meets the RCAF's demanding operational requirements. The Government of Canada is planning to acquire an RPAS to help meet its defence needs. The RPAS will be integrated into a network of intelligence, surveillance and reconnaissance systems to enable near real-time flow of information essential to RCAF operations. L3Harris was selected as a qualified bidder in late May 2019. The request for proposal is expected to be released later this year, the contract awarded in 2022-2023 and the first system delivery is anticipated in 2024-2025. L3Harris is one of the country's largest and most diverse defense and security companies and employs more than 2,300 Canadian employees. To learn more, visit TeamArtemis.ca. Forward-Looking Statements This press release contains forward-looking statements that reflect management's current expectations, assumptions and estimates of future performance and economic conditions. Such statements are made in reliance upon the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. The company cautions investors that any forward-looking statements are subject to risks and uncertainties that may cause actual results and future trends to differ materially from those matters expressed in or implied by such forward-looking statements. Statements about system capabilities, the value or expected value of orders, contracts or programs are forward-looking and involve risks and uncertainties. L3Harris disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise. ###

  • Joint Support Ship cost up by $1.1 billion - taxpayers will now spend $3.4 billion on project

    June 11, 2018 | Local, Naval

    Joint Support Ship cost up by $1.1 billion - taxpayers will now spend $3.4 billion on project

    DAVID PUGLIESE, OTTAWA CITIZEN Taxpayers will have to spend $1.1 billion extra on new navy supply ships that are going to be built starting this summer, the Liberal government now acknowledges. Previously the cost of building the two ships at Seaspan shipyards in Vancouver, BC had been pegged at $2.3 billion. But the government ordered a review of that cost figure and in an email to Postmedia, Procurement Minister Carla Qualtrough's office now confirms the cost for the Joint Support Ships, or JSS, is set at $3.4 billion. Pat Finn, the head of procurement at the Department of National Defence, said the new price tag came as the government decided to do an additional analysis of the project and include other items it had not previously included. In some cases equipment for the ship has been purchased so there are better costs available on those items, Finn said in an interview Monday. Also taken into account was new infrastructure and the delays with the program, which, in turn, drove up the price as the cost of material increased over the years. “The build period has changed quite dramatically,” Finn acknowledged. At one point, the first ship was supposed to arrive in 2012. That has been changed a number of times with the government later hoping for a 2018 delivery and then a 2019 arrival for the first vessel. The Department of National Defence is now hoping for the delivery of the first ship in 2022 or 2023. Construction will begin at Seaspan this summer of some initial portions of the vessels, Finn said. The government hopes starting construction on the supply ships in the summer will head off any potential layoffs of skilled employees at Seaspan. Finn said of the $3.4 billion figure, the actual cost of building the two ships accounts for a little more than 60 per cent. Finn said the new costing model for the JSS is more akin to the one used by the parliamentary budget office. That office had an even higher estimate for JSS when it concluded in 2013 that the final tally for taxpayers would be $4.13 billion. The Joint Support Ships are critical for the navy as they provide fuel and supplies for warships at sea. But the Royal Canadian Navy retired its last two aging supply ships years ago. One was damaged beyond repair in a fire. The other was removed from service because of excessive corrosion. The Canadian military had been relying on the Spanish and Chilean navies to provide supply vessels for short periods of time to help fuel up Canadian warships at sea. Because of the delays in the JSS program, the previous Conservative government entered into agreement with Davie Shipyards in Quebec to lease a commercial vessel that had been converted into a refueling and supply ship. That ship, the MV Asterix, is at the heart of federal government's case against Vice Admiral Mark Norman. Norman has been accused by the RCMP of warning Davie in the fall of 2015 that Liberal cabinet ministers wanted to derail the Asterix project. Word of the Liberal plan leaked out to the news media and the resulting embarrassment forced the Trudeau government to back down on its plans and the conversion of Asterix proceeded. Norman was put under investigation and Prime Minister Justin Trudeau predicted on two occasions the officer would ultimately end up in court. In March, the RCMP charged Norman with a single count of breach of trust. A date for the trial has not yet been set. Norman denies the charge and has said he looks forward to clearing his name. Asterix is considered a rare achievement in Canadian military procurement in that it was delivered on time and on budget. The supply ship is now at sea with Royal Canadian Navy and is headed to a major military exercise to begin later this month. http://ottawacitizen.com/news/national/defence-watch/joint-support-ship-cost-up-by-1-1-billion-taxpayers-will-now-spend-3-4-billion-on-project

All news